OCWA Eastern Branch MAP ======================= Eastern Branch Parallel Transmission Main Design Phase: Sept. 2026 - Nov. 2027 Design Phase work includes: • site observation/utility marking • land surveying and staking • soil boring and subsurface investigation • archaeological surveying (hand digging) • brush clearing and temporary access creation. Micron Great Northern Mall OCWA Facility Henry Clay Boulevard Maple Road The new Construction transmission main Phase work is To contact OCWA (shown in red) projected from Email: projects@ocwa.org will run parallel to Dec. 2027 to Phone: 315-455-7061, Ext. 3159 the existing main. Jan. 2031 © OpenStreetMap contributors