clayny.news

AI for transparency
Clay, New York · Sunday, November 22, 2026· Nov 22, 2026
Public Records › Town of Clay › Legal notice

TBC 1267 Wetzel BESS A B - Carson Power Application Packet

Catalog date 2026-11-06 · PDF · 20,029 words · catalog collection 2026-11-11 Official copy↗ Archived PDF Plain text Mentions

Text index: 400 passages across 33 pages with extracted text; 0 passages have semantic vectors. Pages with any indexed text may still contain unextracted scanned content. Complete page coverage has not been verified.

Recorded original custody binding; reader verifies archived-copy availability separately. Recorded acquisition check: 2026-11-16T07:37:26.484895+00:00. This is not a live source availability check.

Document type unverified. Event date unknown. Issue date unknown. Catalog date: 2026-11-06.
Background page processing

Background page-processing status has not been recorded. This does not certify complete extraction.

Typeset from the PDF of the official document — extraction method is not certified for this historical record; headings, motions and recorded votes are detected automatically, so spacing may differ from the original. The official copy governs.

Contents · 23 sections
  1. PROJECT NAME
  2. PROJECT LOCATION
  3. PROJECT DESCRIPTION
  4. ADDRESS OF SUBJECT PROPERTY
  5. PROPERTY OWNER
  6. WETZEL BESS A&B
  7. 7846 & 7850 GOGUEN RD
  8. CLAY, NY 13090
  9. PRELIMINARY SITE PLAN SUBMISSION
  10. IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE
  11. ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL
  12. ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT OR LAND
  13. SURVEYOR TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE
  14. STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING
  15. SURVEYOR SHALL STAMP THE DOCUMENT AND INCLUDE THE
  16. DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION
  17. REV PER PLANNING
  18. B JM JO 08/19/26
  19. BOARD COMMENTS
  20. A JM JO 02/10/26
  21. OWNER/APPICANT
  22. AUGUST 19, 2026
  23. 08/19/26 104932 AS SHOWN

[Machine extraction from original PDF page 1; PP-OCRv6 medium; recognition errors possible; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; automatically indexed RAW MACHINE TEXT; unreviewed; errors possible; coverage unverified] 087 01

08.2

01 53 Tax Map # 087 Case # TOWNfCLAY A great place to live, work, and raise a family.

Petition for a Tier 2 or Tier 3 BESS Special Use Permit Wetzel BESS A & B

PROJECT NAME

7846 & 7850 Goguen Drive, Clay, NY 13090

PROJECT LOCATION

PROJECT DESCRIPTION

Battery energy storage system NAME OF APPLICANT (Principal contact):

Wetzel BESS A LLC & Wetzel BESS B LLC Mailing Address 39 Broadway, 32nd Floor, New York, NY 10006 Email eanderson@carson-power.com Phone 845-671-1018

ADDRESS OF SUBJECT PROPERTY

7846 & 7850 Goguen Drive, Clay, NY 13090 Enterprise 13, Inc.

PROPERTY OWNER

(Owner of record, if not applicant)

1690 Channelside Trail

Mailing Address Phone 315-729-7766 Baldwinsville, NY 13027 PERSON/FIRMREPRESENTING APPLICANT:

Carson Power LLC, Erik Anderson Mailing Address

39 Broadway, 32nd Floor, New York, NY 10006

Email eanderson@carson-power.com

845-671-1018

Phone Official Use Only September 23, 2026 Date:

Indre Dacden Planning Board Action:

Date filed w/ Planning Department (Signature) Planning Board Action: (a) Date of Filing (b) Date of Hearing (c) Date of Recommendation Carson Power LLC (Entity Name) Date permission referred to County Planning Date recommendation received from County Planning By:Andrew Gordon Vice President Date of Public Hearing called Date of Public Hearing heard (Officer) (Title) Date of Decision Application: [] Approved [ ] Approved w/ conditions [ ] Denied Commissioner of Planning & Development

[Machine extraction from original PDF page 2; PP-OCRv6 medium; recognition errors possible; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; automatically indexed RAW MACHINE TEXT; unreviewed; errors possible; coverage unverified]

Location of the property: YES NO Is located within 500 feet of the Town of Clay or the Village of North X Syracuse Is located within 500 feet of an existing or proposed County or state park or other recreation area; County or State Parkway, Thruway, expressway, road or highway; right-of-way of any stream or X drainage channel owned by County or for which the County has established channel lines;

County or State owned lands on which a public building or institution is situated.

MANDATORY EXHIBITS FOR BESS SPECIAL USE PERMITS. The hearing will not be scheduled without these exhibits:

Legal description of the property; an up-to-date survey or scaled drawing of the subject property showing all dimensions and locations and setbacks of all buildings and structures thereon; and an EAF (Environmental Assessment form) An EAF (Environmental Assessment Form).

Requirements listed in Chapter 209.

Petitioner waives any or all rights otherwise afforded to him under provisions of The Zoning Code of the Town of Clay. September 23, 2026

Dated:

And n docd (Individual Signature) (OR) Carson Power LLC (Entity Name) Andrew Gordon Vice President By:

(Officer) (Title)

Carson Power LLC

39 Broadway

32nd Floor New York, NY 10006 www.carson-power.com Project Narrative Wetzel BESS A&B Town of Clay, NY September 2026 Project Applicant Wetzel BESS A LLC and Wetzel BESS B LLC

39 Broadway, 32nd Floor, New York, NY 10006

Planned Development Overview and Proposed Use The proposal includes the construction of two 5 MW AC, 4-hour duration battery energy storage systems (BESS) on two parcels totaling 2.618 acres located in the Industrial 1 (I-1) zoning district (Wetzel BESS A&B).

The proposed BESS Project would occupy approximately 13,200 square feet of the parcels and would be permitted as a Battery Energy Storage System. Additionally, two (2) utility poles are proposed to be installed outside the fenced area along with six (6) small concrete pads for utility interconnection equipment. The Project will require a SEQRA review, a Site Plan Review, and a BESS Special Use Permit. Components of the system would include BESS within an enclosed outdoor enclosure, equipment pads, security fencing, electric trenching, and electrical grid interconnection poles and equipment.

The proposed BESS Project will operate 24 hours a day seven (7) days a week once fully commissioned and connected to the grid. There will be no regular employees on site. Employees will be on site several times a year for maintenance of the system and surrounding site area. No change to existing traffic volume is anticipated.

Ideal Construction Schedule • Permitting and Approvals: October 2026 - January 2027 • Construction Commencement: May 2027 • Project Completion and Commissioning: October 2027 Project Address and Property Owner • Project address: 7846 & 7850 Goguen Drive, Clay, NY 13090 • Project property owner: Enterprise 13, Inc.

• Tax Parcel(s): 087.-01-08.2 & 087.-01-53 Anticipated Exceptions to the Ordinance The BESS Project is designed to fully comply with applicable local zoning regulations, and the applicant does not anticipate requesting any exceptions.

Construction Sequence The project will be constructed in one (1) phase over an approximate duration of four (4) to six (6) months. Prior to the start of construction, erosion and sediment controls and wetland protection fencing shall be installed in accordance with the approved plans.

Following installation of erosion and sediment controls, clearing and grubbing of the site, along with saw cutting and removal of required existing pavement, shall commence. Next, required excavation for equipment pads and electrical trenching shall be completed, including subgrade preparation. Concrete equipment pads shall be installed following completion of subgrade preparation.

Electrical conduit and associated underground infrastructure shall be installed as required, followed by completion of any remaining backfilling. BESS units and ancillary electrical equipment shall then be installed on the concrete pads, and all electrical connections shall be completed.

Security fencing shall be installed after the BESS units are in place and all below- ground work has been completed. System testing, commissioning, and required inspections shall be performed prior to interconnection. Upon successful completion of all testing and inspections, the system shall be connected to the electric grid.

Once construction activities have ceased, all remaining disturbed areas shall be stabilized through seeding and mulching. The site shall then be demobilized, including removal of construction equipment and temporary erosion and sediment controls.

Fire Safety The drafts of the Emergency Response Plan (ERP) and Hazard Mitigation Analysis (HMA) have been developed based on the site plan submitted in this application.

ESRG (Energy Safety Response Group) completed the ERP and HMA with site-specific information. Any feedback from the municipality and Fire Department will be incorporated into the final document, which will be issued at the time of the building permit. This ensures that all final detailed designs are reflected in the deliverable. Also, a Fire Safety Compliance Memo has been submitted to walk the Town through the codes and certifications that this proposed BESS will comply with.

Species The response from the NYSDEC Natural Heritage Program and federal IPaC results have been submitted with this application. There were no species identified by the NYSDEC. The IPaC references the Indiana Bat, Northern Long-eared Bat, and Tricolored Bat however no critical habitat was found within the project area.

[Literal native PDF text; original page 4; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified] Anticipated Exceptions to the Ordinance The BESS Project is designed to fully comply with applicable local zoning regulations, and the applicant does not anticipate requesting any exceptions.

Construction Sequence The project will be constructed in one (1) phase over an approximate duration of four (4) to six (6) months. Prior to the start of construction, erosion and sediment controls and wetland protection fencing shall be installed in accordance with the approved plans.

Following installation of erosion and sediment controls, clearing and grubbing of the site, along with saw cutting and removal of required existing pavement, shall commence. Next, required excavation for equipment pads and electrical trenching shall be completed, including subgrade preparation. Concrete equipment pads shall be installed following completion of subgrade preparation.

Electrical conduit and associated underground infrastructure shall be installed as required, followed by completion of any remaining backfilling. BESS units and ancillary electrical equipment shall then be installed on the concrete pads, and all electrical connections shall be completed.

Security fencing shall be installed after the BESS units are in place and all below- ground work has been completed. System testing, commissioning, and required inspections shall be performed prior to interconnection. Upon successful completion of all testing and inspections, the system shall be connected to the electric grid.

[Literal native PDF text; original page 4; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified] Once construction activities have ceased, all remaining disturbed areas shall be stabilized through seeding and mulching. The site shall then be demobilized, including removal of construction equipment and temporary erosion and sediment controls.

Fire Safety The drafts of the Emergency Response Plan (ERP) and Hazard Mitigation Analysis (HMA) have been developed based on the site plan submitted in this application.

ESRG (Energy Safety Response Group) completed the ERP and HMA with site-specific information. Any feedback from the municipality and Fire Department will be incorporated into the final document, which will be issued at the time of the building permit. This ensures that all final detailed designs are reflected in the deliverable. Also, a Fire Safety Compliance Memo has been submitted to walk the Town through the codes and certifications that this proposed BESS will comply with.

Species The response from the NYSDEC Natural Heritage Program and federal IPaC results have been submitted with this application. There were no species identified by the NYSDEC. The IPaC references the Indiana Bat, Northern Long-eared Bat, and Tricolored Bat however no critical habitat was found within the project area.

Wetlands The BESS and supporting electrical equipment are located entirely outside the delineated wetland on the southern property. This wetland received a negative Jurisdictional Determination from the NYSDEC and is therefore not regulated by the NYSDEC. The negative Jurisdictional Determinations for both parcels have been submitted with this application.

Driveway Permit No driveway permit will be required for this project as it will utilize the existing driveway access to the site.

Decommissioning A plan and cost estimate has been submitted with this application. The applicant is proposing a bond in the amount of $451,162.40 to cover decommissioning cost in the event of the owner operator failing to meet their obligations for site restoration.

SHPO and FAA Final approval by NYS SHPO has already been obtained and submitted as part of this application. No Hazard Determination from the FAA has been received and submitted as part of this application.

Proposed System Installer and Owner A system installer has not yet been selected at this stage of development. Carson Power currently owns the project, with a transfer to a long-term owner anticipated after approvals are received. Once identified, contact information for the system installer and long-term owner will be provided to the Town and included with the Building Permit Application.

Conclusion The Wetzel BESS A&B Project is a well-sited energy infrastructure development that will provide long-term benefits to the community. The Applicant looks forward to collaborating with the Town of Clay throughout the review and permitting process to ensure successful implementation.

Full Environmental Assessment Form Part 1 - Project and Setting Instructions for Completing Part 1 Part 1 is to be completed by the applicant or project sponsor. Responses become part of the application for approval or funding, are subject to public review, and may be subject to further verification.

Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as thoroughly as possible based on current information; indicate whether missing information does not exist, or is not reasonably available to the sponsor; and, when possible, generally describe work or studies that would be necessary to update or fully develop that information.

Applicants/sponsors must complete all items in Sections A & B. In Sections C, D & E, most items contain an initial question that must be answered either “Yes” or “No.” If the answer to the initial question is “Yes,” complete the following sub-questions. If the answer to the initial question is “No,” proceed to the next question. Section F allows the project sponsor to identify and attach additional information. Section G requires the name and signature of the applicant or project sponsor to verify the information in Part 1 is accurate and complete.

A. Project and Applicant/Sponsor Information.

Name of Action or Project:

Wetzel BESS A&B Project Location (describe and attach a general location map):

7846 & 7850 Goguen Rd, Clay, NY 13090 Brief Description of Proposed Action (include purpose or need):

Proposed two (2) 5 MW Battery Energy Storage System (BESS) located centrally with 12 units on the southern property and some of the ancillary equipment on the northern property. The system will include up to twelve (12) battery units along with ancillary electrical equipment, inverters, transformers, switchgear, etc. The system will be housed within a self-locking chain link fence with fire department access. A minimum of 10 feet will be clear around each battery unit. In addition to the system components within the fenced area (approximately 20,000 square feet) equipment pads will be placed outside the fence gate for interconnection equipment.

Name of Applicant/Sponsor: Telephone: 607-237-5440 Wetzel BESS A LLC and Wetzel BESS B LLC E-Mail: ethomas@carson-power.com Address:

39 Broadway, 32nd Floor

City/PO: State: Zip Code: New York NY 10006 Project Contact (if not same as sponsor; give name and title/role): Telephone: 607-237-5440 Emily Thomas / Development Operations Manager E-Mail: ethomas@carson-power.com Address:

39 Broadway, 32nd Floor

City/PO: State: Zip Code: New York NY 10006 Property Owner (if not same as sponsor): Telephone: 315-729-7766 Enterprise 13, Inc.

E-Mail: jhickey@charlessigns.com Address:

1690 Channelside Trail

City/PO: State: Zip Code: Baldwinsville NY 13027 Page 1 of 15 FEAF 2026 [Literal native PDF text; original page 6; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified] Full Environmental Assessment Form Part 1 - Project and Setting Instructions for Completing Part 1 Part 1 is to be completed by the applicant or project sponsor. Responses become part of the application for approval or funding, are subject to public review, and may be subject to further verification.

Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as thoroughly as possible based on current information; indicate whether missing information does not exist, or is not reasonably available to the sponsor; and, when possible, generally describe work or studies that would be necessary to update or fully develop that information.

Applicants/sponsors must complete all items in Sections A & B. In Sections C, D & E, most items contain an initial question that must be answered either “Yes” or “No.” If the answer to the initial question is “Yes,” complete the following sub-questions. If the answer to the initial question is “No,” proceed to the next question. Section F allows the project sponsor to identify and attach additional information. Section G requires the name and signature of the applicant or project sponsor to verify the information in Part 1 is accurate and complete.

[Literal native PDF text; original page 6; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified] A. Project and Applicant/Sponsor Information.

Name of Action or Project:

Wetzel BESS A&B Project Location (describe and attach a general location map):

7846 & 7850 Goguen Rd, Clay, NY 13090 Brief Description of Proposed Action (include purpose or need):

Proposed two (2) 5 MW Battery Energy Storage System (BESS) located centrally with 12 units on the southern property and some of the ancillary equipment on the northern property. The system will include up to twelve (12) battery units along with ancillary electrical equipment, inverters, transformers, switchgear, etc. The system will be housed within a self-locking chain link fence with fire department access. A minimum of 10 feet will be clear around each battery unit. In addition to the system components within the fenced area (approximately 20,000 square feet) equipment pads will be placed outside the fence gate for interconnection equipment.

Name of Applicant/Sponsor: Telephone: 607-237-5440 Wetzel BESS A LLC and Wetzel BESS B LLC E-Mail: ethomas@carson-power.com Address:

39 Broadway, 32nd Floor

City/PO: State: Zip Code: New York NY 10006 [Literal native PDF text; original page 6; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified] Project Contact (if not same as sponsor; give name and title/role): Telephone: 607-237-5440 Emily Thomas / Development Operations Manager E-Mail: ethomas@carson-power.com Address:

39 Broadway, 32nd Floor

City/PO: State: Zip Code: New York NY 10006 Property Owner (if not same as sponsor): Telephone: 315-729-7766 Enterprise 13, Inc.

E-Mail: jhickey@charlessigns.com Address:

1690 Channelside Trail

City/PO: State: Zip Code: Baldwinsville NY 13027 Page 1 of 15 FEAF 2026 B. Government Approvals B. Government Approvals, Funding, or Sponsorship. (“Funding” includes grants, loans, tax relief, and any other forms of financial assistance.) Government Entity If Yes: Identify Agency and Approval(s) Application Date Required (Actual or projected) a. City Council, Town Board, 9 Yes 9✔ No or Village Board of Trustees b. City, Town or Village 9 ✔ Yes 9 No Planning Board - Site plan approval and special 1/6/26 Planning Board or Commission use permit c. City, Town or 9 Yes 9✔ No Village Zoning Board of Appeals d. Other local agencies 9 Yes 9✔ No e. County agencies 9 ✔ Yes 9 No Onondaga County - 239m review 1/6/26 f. Regional agencies 9 Yes 9✔ No g. State agencies 9 Yes 9✔ No h. Federal agencies 9 Yes 9✔ No i. Coastal Resources.

i. Is the project site within a Coastal Area or the waterfront area of a Designated Inland Waterway? 9 Yes 9✔ No ii. Is the project site located in a community with an approved Local Waterfront Revitalization Program? 9 Yes ✔ No iii. Is the project site within a Coastal Erosion Hazard Area? 9 Yes 9✔ No C. Planning and Zoning C.1. Planning and zoning actions.

Will administrative or legislative adoption, or amendment of a plan, local law, ordinance, rule, or regulation be the 9 Yes 9 No only approval(s) that must be granted to enable the proposed action to proceed?

 If Yes, complete sections C, F and G.

 If No, proceed to question C.2 and complete all remaining sections and questions in Part 1 C.2. Adopted land use plans.

a. Do any municipally adopted (city, town, village, or county) comprehensive land use plan(s) include the site 9 Yes 9✔ No where the proposed action would be located?

If Yes, does the comprehensive plan include specific recommendations for the site where the proposed action Yes No would be located? 9 b. Is the site of the proposed action within any local or regional special planning district (for example: Greenway; Yes ✔ No Brownfield Opportunity Area (BOA); designated State or Federal heritage area; watershed management plan; 9 9 or other)?

If Yes, identify the plan(s):

c. Is the proposed action located wholly or partially within an area listed in an adopted municipal open space plan Yes ✔ No or an adopted municipal farmland protection plan? 9 9 If Yes, identify the plan(s):

Page 2 of 15 FEAF 2026 d. Is the proposed action in a municipality with an adopted comprehensive or individual plan that addresses climate Yes ✔ No change?

9 9

If Yes , identify the elements of the plan that are relevant to the action:

9 9

C.3. Zoning

9 9

a. Is the site of the proposed action located in a municipality with an adopted zoning law or ordinance? ✔ Yes No If Yes, what is the zoning classification(s) including any applicable overlay district?

Industrial 1 b. Is the use permitted or allowed by a special or conditional use permit? ✔ Yes No c. Is a zoning change requested as part of the proposed action? Yes ✔ No If Yes, what is the proposed new zoning for the site?

C.4. Existing community services.

a. In what school district is the project site located?

Liverpool Central School District b. What police or other public protection forces serve the project site?

Onondaga County Sheriff's Office c. Which fire protection and emergency medical services serve the project site?

Moyers Corners Fire Department and Northern Onondaga Volunteer Ambulance d. What parks serve the project site?

Not applicable. There will be no occupants at this site.

D. Project Details D.1. Proposed and Potential Development a. What is the general nature of the proposed action (e.g., residential, industrial, commercial, recreational; if mixed, include all components)? 9 9 Industrial b. a. Total acreage of the site of the proposed action? 2.65 acres b. Total acreage to be physically disturbed? 0.72 acres 9 9 c. Total acreage (project site and any contiguous properties) owned or controlled by the applicant or project sponsor? 2.65 acres c. Is the proposed action an expansion of an existing project or use? 9 Yes9✔ No If Yes, what is the approximate percentage of the proposed expansion and identify the units (e.g., acres, miles, housing units, square feet)? % Units:

d. Is the proposed action a subdivision, or does it include a subdivision? 9 Yes9✔ No If Yes, i. Purpose or type of subdivision? (e.g., residential, industrial, commercial; if mixed, specify types) ii. Is a cluster/conservation layout proposed? Yes No iii. Number of lots proposed?

iv. Minimum and maximum proposed lot sizes? Minimum Maximum Page 3 of 15 FEAF 2026 [Literal native PDF text; original page 8; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified] d. Is the proposed action in a municipality with an adopted comprehensive or individual plan that addresses climate Yes ✔ No change?

9 9

If Yes , identify the elements of the plan that are relevant to the action:

9 9

C.3. Zoning

9 9

a. Is the site of the proposed action located in a municipality with an adopted zoning law or ordinance? ✔ Yes No If Yes, what is the zoning classification(s) including any applicable overlay district?

Industrial 1 b. Is the use permitted or allowed by a special or conditional use permit? ✔ Yes No c. Is a zoning change requested as part of the proposed action? Yes ✔ No If Yes, what is the proposed new zoning for the site?

C.4. Existing community services.

a. In what school district is the project site located?

Liverpool Central School District b. What police or other public protection forces serve the project site?

Onondaga County Sheriff's Office [Literal native PDF text; original page 8; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified] c. Which fire protection and emergency medical services serve the project site?

Moyers Corners Fire Department and Northern Onondaga Volunteer Ambulance d. What parks serve the project site?

Not applicable. There will be no occupants at this site.

D. Project Details D.1. Proposed and Potential Development a. What is the general nature of the proposed action (e.g., residential, industrial, commercial, recreational; if mixed, include all components)? 9 9 Industrial b. a. Total acreage of the site of the proposed action? 2.65 acres b. Total acreage to be physically disturbed? 0.72 acres 9 9 c. Total acreage (project site and any contiguous properties) owned or controlled by the applicant or project sponsor? 2.65 acres [Literal native PDF text; original page 8; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified] c. Is the proposed action an expansion of an existing project or use? 9 Yes9✔ No If Yes, what is the approximate percentage of the proposed expansion and identify the units (e.g., acres, miles, housing units, square feet)? % Units:

d. Is the proposed action a subdivision, or does it include a subdivision? 9 Yes9✔ No If Yes, i. Purpose or type of subdivision? (e.g., residential, industrial, commercial; if mixed, specify types) ii. Is a cluster/conservation layout proposed? Yes No iii. Number of lots proposed?

iv. Minimum and maximum proposed lot sizes? Minimum Maximum Page 3 of 15 FEAF 2026 e. Will the proposed action be constructed in multiple phases? 9 Yes 9✔ No i. If No, anticipated period of construction: 6 months ii. If Yes:

 Total number of phases anticipated  Anticipated commencement date of phase 1 (including demolition) month year  Anticipated completion date of final phase month year  Generally describe connections or relationships among phases, including any contingencies where progress of one phase may determine timing or duration of future phases: 9 9 f. Does the project include new residential uses? Yes ✔ No If Yes, show numbers of units proposed.

One Family Two Family Three Family Multiple Family (four or more) 9 9 Initial Phase At completion of all phases

9 9 9

g. Does the proposed action include new non-residential construction (including expansions)? ✔ Yes No If Yes, i. Total number of structures 12

5.417 28.875

ii. Dimensions (in feet) of largest proposed structure: 9.167 height; width; and length iii. Approximate extent of building space to be heated or cooled: 0 square feet h. Does the proposed action include construction or other activities that will result in the impoundment of any Yes ✔ No liquids, such as creation of a water supply, reservoir, pond, lake, waste lagoon or other storage? If Yes, i. Purpose of the impoundment:

ii. If a water impoundment, the principal source of the water: Ground water Surface water streams 9 Other 9 specify: iii. If other than water, identify the type of impounded/contained liquids and their source.

iv. Approximate size of the proposed impoundment. Volume: million gallons; surface area: acres v. Dimensions of the proposed dam or impounding structure: height; length vi. Construction method/materials for the proposed dam or impounding structure (e.g., earth fill, rock, wood, concrete): D.2. Project Operations a. Does the proposed action include any excavation, mining, or dredging, during construction, operations, or both? Yes ✔ No (Not including general site preparation, grading or installation of utilities or foundations where all excavated materials will remain onsite) If Yes:

i .What is the purpose of the excavation or dredging?

ii. How much material (including rock, earth, sediments, etc.) is proposed to be removed from the site?  Volume (specify tons or cubic yards): 9 9  Over what duration of time?

iii. Describe nature and characteristics of materials to be excavated or dredged, and plans to use, manage or dispose of them. iv. Will there be onsite dewatering or processing of excavated materials? Yes No If yes, describe. 9 9 v. What is the total area to be dredged or excavated? acres vi. What is the maximum area to be worked at any one time? acres vii. What would be the maximum depth of excavation or dredging? feet viii. Will the excavation require blasting? Yes No ix. Summarize site reclamation goals and plan:

Page 4 of 15 FEAF 2026 b. Would the proposed action cause or result in alteration of, increase or decrease in size of, or encroachment Yes ✔ No into any existing wetland, waterbody, shoreline, beach or adjacent area?

If Yes:

i. Identify the wetland or waterbody which would be affected (by name, water index number, wetland map number or geographic description):

ii. Describe how the proposed action would affect that waterbody or wetland, e.g., excavation, fill, placement of structures, or alteration of channels, banks, and shorelines. Indicate extent of activities, alterations and additions in square feet or acres: iii. Will the proposed action cause or result in disturbance to bottom sediments? Yes No If Yes, describe:

iv. Will the proposed action cause or result in the destruction or removal of aquatic vegetation? Yes No If Yes:

 acres of aquatic vegetation proposed to be removed:___________________________  expected acreage of aquatic vegetation remaining after project completion:

 purpose of proposed removal (e.g. beach clearing, invasive species control, boat access):

 proposed method of plant removal:

 if chemical/herbicide treatment will be used, specify product(s):

v. Describe any proposed reclamation/mitigation following disturbance:

c. Will the proposed action use, or create a new demand for water? Yes ✔ No If Yes:

i. Total anticipated water usage/demand per day: gallons/day ii. Will the proposed action obtain water from an existing public water supply? Yes No If Yes:

 Name of district or service area:

 Does the existing public water supply have capacity to serve the proposal? Yes No  Is the project site in the existing district? Yes No  Is expansion of the district needed? Yes No  Do existing lines serve the project site? Yes No iii. Will line extension within an existing district be necessary to supply the project? Yes No If Yes:

 Describe extensions or capacity expansions proposed to serve this project:

 Source(s) of supply for the district:

iv. Is a new water supply district or service area proposed to be formed to serve the project site? Yes No If, Yes:

 Applicant/sponsor for new district:

 Date application submitted or anticipated:

 Proposed source(s) of supply for new district:

v. If a public water supply will not be used, describe plans to provide water supply for the project: vi. If water supply will be from wells (public or private), what is the maximum pumping capacity: gallons/minute. Page 5 of 15 FEAF 2026 d. Will the proposed action generate liquid wastes? Yes ✔ No If Yes:

i. Total anticipated liquid waste generation per day: gallons/day ii. Nature of liquid wastes to be generated (e.g., sanitary wastewater, industrial; if combination, describe all components and approximate volumes or proportions of each):

[Literal native PDF text; original page 10; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified] b. Would the proposed action cause or result in alteration of, increase or decrease in size of, or encroachment Yes ✔ No into any existing wetland, waterbody, shoreline, beach or adjacent area?

If Yes:

i. Identify the wetland or waterbody which would be affected (by name, water index number, wetland map number or geographic description):

ii. Describe how the proposed action would affect that waterbody or wetland, e.g., excavation, fill, placement of structures, or alteration of channels, banks, and shorelines. Indicate extent of activities, alterations and additions in square feet or acres: iii. Will the proposed action cause or result in disturbance to bottom sediments? Yes No If Yes, describe:

iv. Will the proposed action cause or result in the destruction or removal of aquatic vegetation? Yes No If Yes:

 acres of aquatic vegetation proposed to be removed:___________________________  expected acreage of aquatic vegetation remaining after project completion:

 purpose of proposed removal (e.g. beach clearing, invasive species control, boat access):

 proposed method of plant removal:

 if chemical/herbicide treatment will be used, specify product(s):

v. Describe any proposed reclamation/mitigation following disturbance:

[Literal native PDF text; original page 10; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified] c. Will the proposed action use, or create a new demand for water? Yes ✔ No If Yes:

i. Total anticipated water usage/demand per day: gallons/day ii. Will the proposed action obtain water from an existing public water supply? Yes No If Yes:

 Name of district or service area:

 Does the existing public water supply have capacity to serve the proposal? Yes No  Is the project site in the existing district? Yes No  Is expansion of the district needed? Yes No  Do existing lines serve the project site? Yes No iii. Will line extension within an existing district be necessary to supply the project? Yes No If Yes:

 Describe extensions or capacity expansions proposed to serve this project:

[Literal native PDF text; original page 10; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified]  Source(s) of supply for the district:

iv. Is a new water supply district or service area proposed to be formed to serve the project site? Yes No If, Yes:

 Applicant/sponsor for new district:

 Date application submitted or anticipated:

 Proposed source(s) of supply for new district:

v. If a public water supply will not be used, describe plans to provide water supply for the project: vi. If water supply will be from wells (public or private), what is the maximum pumping capacity: gallons/minute. Page 5 of 15 FEAF 2026 iii. Will the proposed action use any existing public wastewater treatment facilities? Yes No If Yes:

 Name of wastewater treatment plant to be used:

 Name of district: 9 9  Does the existing wastewater treatment plant have capacity to serve the project? Yes No  Is the project site in the existing district? Yes No  Is expansion of the district needed? Yes No  Do existing sewer lines serve the project site? Yes No  Will a line extension within an existing district be necessary to serve the project? Yes No If Yes:

 Describe extensions or capacity expansions proposed to serve this project:

9 9

iv. Will a new wastewater (sewage) treatment district be formed to serve the project site? Yes No If Yes:

 Applicant/sponsor for new district: 9 9  Date application submitted or anticipated:

 What is the receiving water for the wastewater discharge?

v. If public facilities will not be used, describe plans to provide wastewater treatment for the project, including specifying proposed receiving water (name and classification if surface discharge or describe subsurface disposal plans): vi. Describe any plans or designs to capture, recycle or reuse liquid waste:

9 9

e. Will the proposed action disturb more than one acre and create stormwater runoff, either from new point Yes ✔ No sources (i.e. ditches, pipes, swales, curbs, gutters or other concentrated flows of stormwater) or non-point source (i.e., sheet flow) during construction or post construction?

If Yes: 9 i. How much impervious surface will the project create in relation to total size of project parcel? Square feet or acres (impervious surface) Square feet or acres (parcel size) ii. Describe types of new point sources.

iii. Where will the stormwater runoff be directed (i.e. on-site stormwater management facility/structures, adjacent properties, groundwater, on-site surface water, or off-site surface waters)?

9 9

 If to surface waters, identify receiving water bodies or wetlands:

 Will stormwater runoff flow to adjacent properties? Yes No iv. Does the proposed plan minimize impervious surfaces, use pervious materials or collect and re-use stormwater? Yes No

9 9

9 9

9 9

Page 6 of 15 FEAF 2026 f. Does the proposed action include, or will it use on-site, one or more sources of air emissions, including fuel Yes ✔ No combustion, waste incineration, or other processes or operations?

If Yes, identify:

i. Mobile sources during project operations (e.g., heavy equipment, fleet or delivery vehicles) ______________________________________________________________________________________________________ ii. Stationary sources during construction (e.g., power generation, structural heating, batch plant, crushers) ______________________________________________________________________________________________________ [Literal native PDF text; original page 11; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified] d. Will the proposed action generate liquid wastes? Yes ✔ No If Yes:

i. Total anticipated liquid waste generation per day: gallons/day ii. Nature of liquid wastes to be generated (e.g., sanitary wastewater, industrial; if combination, describe all components and approximate volumes or proportions of each):

iii. Will the proposed action use any existing public wastewater treatment facilities? Yes No If Yes:

 Name of wastewater treatment plant to be used:

 Name of district: 9 9  Does the existing wastewater treatment plant have capacity to serve the project? Yes No  Is the project site in the existing district? Yes No  Is expansion of the district needed? Yes No [Literal native PDF text; original page 11; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified]  Do existing sewer lines serve the project site? Yes No  Will a line extension within an existing district be necessary to serve the project? Yes No If Yes:

 Describe extensions or capacity expansions proposed to serve this project:

9 9

iv. Will a new wastewater (sewage) treatment district be formed to serve the project site? Yes No If Yes:

 Applicant/sponsor for new district: 9 9  Date application submitted or anticipated:

 What is the receiving water for the wastewater discharge?

v. If public facilities will not be used, describe plans to provide wastewater treatment for the project, including specifying proposed receiving water (name and classification if surface discharge or describe subsurface disposal plans): vi. Describe any plans or designs to capture, recycle or reuse liquid waste:

9 9

[Literal native PDF text; original page 11; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified] e. Will the proposed action disturb more than one acre and create stormwater runoff, either from new point Yes ✔ No sources (i.e. ditches, pipes, swales, curbs, gutters or other concentrated flows of stormwater) or non-point source (i.e., sheet flow) during construction or post construction?

If Yes: 9 i. How much impervious surface will the project create in relation to total size of project parcel? Square feet or acres (impervious surface) Square feet or acres (parcel size) ii. Describe types of new point sources.

iii. Where will the stormwater runoff be directed (i.e. on-site stormwater management facility/structures, adjacent properties, groundwater, on-site surface water, or off-site surface waters)?

9 9

 If to surface waters, identify receiving water bodies or wetlands:

 Will stormwater runoff flow to adjacent properties? Yes No iv. Does the proposed plan minimize impervious surfaces, use pervious materials or collect and re-use stormwater? Yes No [Literal native PDF text; original page 11; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified]

9 9

9 9

9 9

Page 6 of 15 FEAF 2026 iii. Stationary sources during operations (e.g., process emissions, boilers, electric generation, surface coating) ______________________________________________________________________________________________________ g. Will any air emission sources named in D.2.f (above), require an Air Facility Registration, Air State Facility Yes ✔ No Permit, Title IV Permit or Title V Permit?

If Yes:

i. Is the proposed action subject to the Nonattainment New Source Review or Prevention of Significant Deterioration Yes No requirements discussed in 6 NYCRR Part 231?

ii. As calculated in the air permit application, the proposed action has the potential to emit:

 Tons/year (short tons) of carbon monoxide (CO)  Tons/year (short tons) of oxides of nitrogen (NOx)  Tons/year (short tons) of particulate matter (PM-10, PM-2.5)  Tons/year (short tons) of volatile organic compounds (VOC)  Tons/year (short tons) of sulfur dioxide (SO2) iii. Will emissions of air contaminants from the proposed action described above exceed the corresponding major Yes No source thresholds?

iv.Does the proposed action have the potential to emit 10 tons/year or more of any one designated hazardous air Yes No pollutant or 25 tons/year or more of any combination of such hazardous air pollutants (6NYCRR 200.1(ag))? If Yes, provide the total potential to emit hazardous air pollutants in short tons/year: _____________________________ h. Will the proposed action generate or emit annual direct and indirect greenhouse gas emissions, such as carbon dioxide, methane, nitrous oxide, sulfur hexafluoride, hydrofluorocarbons, or perfluorocarbons in excess of 10,000 metric tons of total carbon dioxide equivalents per year at any point in the lifetime of the proposed action (estimated using the carbon dioxide equivalent definition and global warming potentials provided in 6 NYCRR Part 496)? Yes ✔ No If Yes:

i. Estimate the proposed action’s metric tons of carbon dioxide equivalents in tons/year (metric):

ii. Describe any greenhouse gas capture, control, or elimination measures included in project design: i. Will the proposed action result in the release of air pollutants from open-air operations or processes, such as Yes ✔ No quarry or landfill operations?

If Yes: Describe operations and nature of emissions (e.g., diesel exhaust, rock particulates/dust):

j. Will the proposed action result in a substantial increase in traffic above present levels or generate substantial Yes ✔ No new demand for transportation facilities or services?

If Yes:

i. When is the peak traffic expected (Check all that apply): Morning Evening Weekend Randomly between hours of to .

ii. For commercial activities only, projected number of truck trips/day and type (e.g., semi trailers and dump trucks): iii. Parking spaces: Existing Proposed Net increase/decrease iv. Does the proposed action include any shared use parking? Yes No v. If the proposed action includes any modification of existing roads, creation of new roads or change in existing access, describe: ______________________________________________________________________________________________________________ vi. Are public/private transportation service(s) or facilities available within ½ mile of the proposed site? Yes No vii Will the proposed action include access to public transportation or accommodations for use of hybrid, electric Yes No or other alternative fueled vehicles?

viii. Will the proposed action include plans for pedestrian or bicycle accommodations for connections to existing Yes No pedestrian or bicycle routes?

Page 7 of 15 FEAF 2026 k. Will the proposed action (for commercial or industrial projects only) generate new or additional energy demand? Yes ✔ No If Yes:

i. Estimate annual electricity demand during operation of the proposed action:

ii. Anticipated sources/suppliers of electricity for the project (e.g., on-site combustion, on-site renewable, via grid/local utility, or other):________________________________________________________________________________________________ iii. Will the proposed action require a new, or an upgrade, to an existing substation? Yes No l. Hours of operation. Answer all items which apply.

i. During Construction: ii. During Operations:

 Monday - Friday: 7am - 7pm  Monday - Friday: 24hrs / day  Saturday:  Saturday: 24hrs / day  Sunday:  Sunday: 24hrs / day  Holidays:  Holidays: 24hrs / day [Literal native PDF text; original page 12; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified] f. Does the proposed action include, or will it use on-site, one or more sources of air emissions, including fuel Yes ✔ No combustion, waste incineration, or other processes or operations?

If Yes, identify:

i. Mobile sources during project operations (e.g., heavy equipment, fleet or delivery vehicles) ______________________________________________________________________________________________________ ii. Stationary sources during construction (e.g., power generation, structural heating, batch plant, crushers) ______________________________________________________________________________________________________ [Literal native PDF text; original page 12; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified] iii. Stationary sources during operations (e.g., process emissions, boilers, electric generation, surface coating) ______________________________________________________________________________________________________ g. Will any air emission sources named in D.2.f (above), require an Air Facility Registration, Air State Facility Yes ✔ No Permit, Title IV Permit or Title V Permit?

If Yes:

i. Is the proposed action subject to the Nonattainment New Source Review or Prevention of Significant Deterioration Yes No requirements discussed in 6 NYCRR Part 231?

ii. As calculated in the air permit application, the proposed action has the potential to emit:

 Tons/year (short tons) of carbon monoxide (CO)  Tons/year (short tons) of oxides of nitrogen (NOx)  Tons/year (short tons) of particulate matter (PM-10, PM-2.5)  Tons/year (short tons) of volatile organic compounds (VOC)  Tons/year (short tons) of sulfur dioxide (SO2) iii. Will emissions of air contaminants from the proposed action described above exceed the corresponding major Yes No source thresholds?

iv.Does the proposed action have the potential to emit 10 tons/year or more of any one designated hazardous air Yes No pollutant or 25 tons/year or more of any combination of such hazardous air pollutants (6NYCRR 200.1(ag))? If Yes, provide the total potential to emit hazardous air pollutants in short tons/year: _____________________________ [Literal native PDF text; original page 12; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified] h. Will the proposed action generate or emit annual direct and indirect greenhouse gas emissions, such as carbon dioxide, methane, nitrous oxide, sulfur hexafluoride, hydrofluorocarbons, or perfluorocarbons in excess of 10,000 metric tons of total carbon dioxide equivalents per year at any point in the lifetime of the proposed action (estimated using the carbon dioxide equivalent definition and global warming potentials provided in 6 NYCRR Part 496)? Yes ✔ No If Yes:

i. Estimate the proposed action’s metric tons of carbon dioxide equivalents in tons/year (metric):

ii. Describe any greenhouse gas capture, control, or elimination measures included in project design: i. Will the proposed action result in the release of air pollutants from open-air operations or processes, such as Yes ✔ No quarry or landfill operations?

If Yes: Describe operations and nature of emissions (e.g., diesel exhaust, rock particulates/dust):

[Literal native PDF text; original page 12; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified] j. Will the proposed action result in a substantial increase in traffic above present levels or generate substantial Yes ✔ No new demand for transportation facilities or services?

If Yes:

i. When is the peak traffic expected (Check all that apply): Morning Evening Weekend Randomly between hours of to .

ii. For commercial activities only, projected number of truck trips/day and type (e.g., semi trailers and dump trucks): iii. Parking spaces: Existing Proposed Net increase/decrease iv. Does the proposed action include any shared use parking? Yes No v. If the proposed action includes any modification of existing roads, creation of new roads or change in existing access, describe: ______________________________________________________________________________________________________________ vi. Are public/private transportation service(s) or facilities available within ½ mile of the proposed site? Yes No vii Will the proposed action include access to public transportation or accommodations for use of hybrid, electric Yes No or other alternative fueled vehicles?

viii. Will the proposed action include plans for pedestrian or bicycle accommodations for connections to existing Yes No pedestrian or bicycle routes?

[Literal native PDF text; original page 12; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified] Page 7 of 15 FEAF 2026 m. Will the proposed action produce noise that will exceed existing ambient noise levels during construction, ✔ Yes No operation, or both?

If yes:

i. Provide details including sources, time of day and duration:

Construction Noise M-F 7am to 7pm ii. Will the proposed action remove existing natural barriers that could act as a noise barrier or screen? ✔ Yes No Describe: Removing Trees n. Will the proposed action have outdoor lighting? Yes ✔ No If yes:

i. Describe source(s), location(s), height of fixture(s), direction/aim, and proximity to nearest occupied structures: ii. Will proposed action remove existing natural barriers that could act as a light barrier or screen? Yes No Describe:

o. Does the proposed action have the potential to produce odors for more than one hour per day? Yes ✔ No If Yes, describe possible sources, potential frequency and duration of odor emissions, and proximity to nearest occupied structures:

p. Will the proposed action include any bulk storage of petroleum (combined capacity of over 1,100 gallons) Yes ✔ No or chemical products 185 gallons in above ground storage or any amount in underground storage?

If Yes:

i. Product(s) to be stored ii. Volume(s) per unit time (e.g., month, year) iii. Generally, describe the proposed storage facilities:

q. Will the proposed action (commercial, industrial and recreational projects only) use pesticides Yes ✔ No (i.e., herbicides, insecticide) during construction or operation?

If Yes:

i. Describe proposed treatment(s):

ii. Will the proposed action use Integrated Pest Management Practices? Yes No Page 8 of 15 FEAF 2026 [Literal native PDF text; original page 13; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified] k. Will the proposed action (for commercial or industrial projects only) generate new or additional energy demand? Yes ✔ No If Yes:

i. Estimate annual electricity demand during operation of the proposed action:

ii. Anticipated sources/suppliers of electricity for the project (e.g., on-site combustion, on-site renewable, via grid/local utility, or other):________________________________________________________________________________________________ iii. Will the proposed action require a new, or an upgrade, to an existing substation? Yes No l. Hours of operation. Answer all items which apply.

i. During Construction: ii. During Operations:

 Monday - Friday: 7am - 7pm  Monday - Friday: 24hrs / day  Saturday:  Saturday: 24hrs / day  Sunday:  Sunday: 24hrs / day  Holidays:  Holidays: 24hrs / day m. Will the proposed action produce noise that will exceed existing ambient noise levels during construction, ✔ Yes No operation, or both?

If yes:

i. Provide details including sources, time of day and duration:

Construction Noise M-F 7am to 7pm [Literal native PDF text; original page 13; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified] ii. Will the proposed action remove existing natural barriers that could act as a noise barrier or screen? ✔ Yes No Describe: Removing Trees n. Will the proposed action have outdoor lighting? Yes ✔ No If yes:

i. Describe source(s), location(s), height of fixture(s), direction/aim, and proximity to nearest occupied structures: ii. Will proposed action remove existing natural barriers that could act as a light barrier or screen? Yes No Describe:

o. Does the proposed action have the potential to produce odors for more than one hour per day? Yes ✔ No If Yes, describe possible sources, potential frequency and duration of odor emissions, and proximity to nearest occupied structures:

p. Will the proposed action include any bulk storage of petroleum (combined capacity of over 1,100 gallons) Yes ✔ No or chemical products 185 gallons in above ground storage or any amount in underground storage?

If Yes:

i. Product(s) to be stored ii. Volume(s) per unit time (e.g., month, year) iii. Generally, describe the proposed storage facilities:

[Literal native PDF text; original page 13; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified] q. Will the proposed action (commercial, industrial and recreational projects only) use pesticides Yes ✔ No (i.e., herbicides, insecticide) during construction or operation?

If Yes:

i. Describe proposed treatment(s):

ii. Will the proposed action use Integrated Pest Management Practices? Yes No Page 8 of 15 FEAF 2026 r. Will the proposed action (commercial or industrial projects only) involve or require the management or disposal Yes ✔ No of solid waste (excluding hazardous materials)?

If Yes:

i. Describe any solid waste(s) to be generated during construction or operation of the facility:

 Construction: tons per (unit of time)  Operation : tons per (unit of time) ii. Describe any proposals for on-site minimization, recycling or reuse of materials to avoid disposal as solid waste:  Construction:

 Operation:

iii. Proposed disposal methods/facilities for solid waste generated on-site:

 Construction:

 Operation:

s. Does the proposed action include construction or modification of a solid waste management facility? Yes ✔ No If Yes:

i. Type of management or handling of waste proposed for the site (e.g., recycling or transfer station, composting, landfill, or9 9 other disposal activities):

ii. Anticipated rate of disposal/processing:

 Tons/month, if transfer or other non-combustion/thermal treatment, or  Tons/hour, if combustion or thermal treatment iii. If landfill, anticipated site life: years t. Will the proposed action at the site involve the commercial generation, treatment, storage, or disposal of hazardous Yes ✔ No waste?

If Yes: 9 9 i. Name(s) of all hazardous wastes or constituents to be generated, handled, or managed at facility: ii. Generally describe processes or activities involving hazardous wastes or constituents:

iii. Specify amount to be handled or generated tons/month iv. Describe any proposals for on-site minimization, recycling, or reuse of hazardous constituents: 9 v. Will any hazardous wastes be disposed at an existing offsite hazardous waste facility? Yes No If Yes: provide name and location of facility:________________________________________________________________________ If No: describe proposed management of any hazardous wastes which will not be sent to a hazardous waste facility: 9 9 9 Page 9 of 15 FEAF 2026

9 99

E. Site and Setting of Proposed Action E.1. Land uses on and surrounding the project site a. Existing land uses.

i. Check all uses that occur on, adjoining and near the project site.

9Urban ■9Industrial 9Commercial 9Residential (suburban) 9Rural (non-farm) 9Forest 9Agriculture 9Aquatic 9Other (specify):

9 9

ii. If mix of uses, generally describe:

9 b. Land uses and cover types on the project site.

Land use or Current Acreage After 9 Change 9 Cover type Acreage Project Completion (Acres +/-)  Roads, buildings, and other paved or impervious 1.04 1.17 + 0.13 surfaces (total)  • Industrial or manufacturing • Commercial • Residential  Forested 0.38 0.15 - 0.23  Meadows, grasslands or brushlands (non- agricultural, including abandoned agricultural)  Agricultural (includes active orchards, field, greenhouse, etc.)  Surface water features (lakes, ponds, streams, rivers, etc.)

9 9

 Wetlands (freshwater or tidal) 0.61 0.61 0  Non-vegetated (bare rock, earth, or fill)  Other, Describe: Lawn / Grass + 0.109

0.62 0.72 9

Page 10 of 15 FEAF 2026 c. Is the project site presently used by members of the community for public recreation? 9 Yes 9■ No i. If Yes: explain:

d. Are there any facilities serving children, the elderly, people with disabilities (e.g., schools, hospitals, licensed 9 Yes 9■ No day care centers, or group homes) within 1500 feet of the project site?

If Yes, i. Identify facilities:

e. Does the project site contain an existing dam? 9 Yes 9■ No If Yes:

i. Dimensions of the dam and impoundment:

 Dam height: feet  Dam length: feet  Surface area: acres  Volume impounded: gallons OR acre-feet ii. Dam’s existing hazard classification:

iii. Provide date and summarize results of last inspection:

[Literal native PDF text; original page 15; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified]

9 99

E. Site and Setting of Proposed Action E.1. Land uses on and surrounding the project site a. Existing land uses.

i. Check all uses that occur on, adjoining and near the project site.

9Urban ■9Industrial 9Commercial 9Residential (suburban) 9Rural (non-farm) 9Forest 9Agriculture 9Aquatic 9Other (specify):

9 9

ii. If mix of uses, generally describe:

9 [Literal native PDF text; original page 15; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified] b. Land uses and cover types on the project site.

Land use or Current Acreage After 9 Change 9 Cover type Acreage Project Completion (Acres +/-)  Roads, buildings, and other paved or impervious 1.04 1.17 + 0.13 surfaces (total)  • Industrial or manufacturing • Commercial • Residential  Forested 0.38 0.15 - 0.23  Meadows, grasslands or brushlands (non- agricultural, including abandoned agricultural)  Agricultural (includes active orchards, field, greenhouse, etc.)  Surface water features (lakes, ponds, streams, rivers, etc.)

9 9

 Wetlands (freshwater or tidal) 0.61 0.61 0  Non-vegetated (bare rock, earth, or fill)  Other, Describe: Lawn / Grass + 0.109

0.62 0.72 9

[Literal native PDF text; original page 15; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified] Page 10 of 15 FEAF 2026 f. Has the project site ever been used as a municipal, commercial or industrial solid waste management facility, 9 Yes 9■ No or does the project site adjoin property that is now, or was at one time, used as a solid waste management facility? If Yes:

i. Has the facility been formally closed? 9 Yes 9 No  If Yes, cite sources/documentation:

ii. Describe the location of the project site relative to the boundaries of the solid waste management facility: iii. Describe any development constraints due to the prior solid waste activities:

g. Have hazardous wastes been generated, treated and/or disposed of at the site, or does the project site adjoin 9 Yes 9■ No property which is now or was at one time used to commercially treat, store and/or dispose of hazardous waste? If Yes:

i. Describe waste(s) handled and waste management activities, including approximate time when activities occurred: h. Potential contamination history. Has there been a reported spill at the proposed project site, or have any 9 Yes 9■ No remedial actions been conducted at or adjacent to the proposed site?

If Yes:

i. Is any portion of the site listed on the NYSDEC Spills Incidents database or Environmental Site 9 Yes 9 No Remediation database? Check all that apply:

9 Yes – Spills Incidents database Provide DEC ID number(s):

9 Yes – Environmental Site Remediation database Provide DEC ID number(s):

9 Neither database

ii. If site has been subject of RCRA corrective activities, describe control measures:

iii. Is the project within 2000 feet of any site in the NYSDEC Environmental Site Remediation database? 9 Yes 9■ No If Yes, provide DEC ID number(s):

iv. If Yes to (i), (ii) or (iii) above, describe current status of site(s):

Page 11 of 15 FEAF 2026 [Literal native PDF text; original page 16; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified] c. Is the project site presently used by members of the community for public recreation? 9 Yes 9■ No i. If Yes: explain:

d. Are there any facilities serving children, the elderly, people with disabilities (e.g., schools, hospitals, licensed 9 Yes 9■ No day care centers, or group homes) within 1500 feet of the project site?

If Yes, i. Identify facilities:

e. Does the project site contain an existing dam? 9 Yes 9■ No If Yes:

i. Dimensions of the dam and impoundment:

 Dam height: feet  Dam length: feet  Surface area: acres  Volume impounded: gallons OR acre-feet ii. Dam’s existing hazard classification:

iii. Provide date and summarize results of last inspection:

[Literal native PDF text; original page 16; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified] f. Has the project site ever been used as a municipal, commercial or industrial solid waste management facility, 9 Yes 9■ No or does the project site adjoin property that is now, or was at one time, used as a solid waste management facility? If Yes:

i. Has the facility been formally closed? 9 Yes 9 No  If Yes, cite sources/documentation:

ii. Describe the location of the project site relative to the boundaries of the solid waste management facility: iii. Describe any development constraints due to the prior solid waste activities:

g. Have hazardous wastes been generated, treated and/or disposed of at the site, or does the project site adjoin 9 Yes 9■ No property which is now or was at one time used to commercially treat, store and/or dispose of hazardous waste? If Yes:

i. Describe waste(s) handled and waste management activities, including approximate time when activities occurred: [Literal native PDF text; original page 16; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified] h. Potential contamination history. Has there been a reported spill at the proposed project site, or have any 9 Yes 9■ No remedial actions been conducted at or adjacent to the proposed site?

If Yes:

i. Is any portion of the site listed on the NYSDEC Spills Incidents database or Environmental Site 9 Yes 9 No Remediation database? Check all that apply:

9 Yes – Spills Incidents database Provide DEC ID number(s):

9 Yes – Environmental Site Remediation database Provide DEC ID number(s):

9 Neither database

ii. If site has been subject of RCRA corrective activities, describe control measures:

iii. Is the project within 2000 feet of any site in the NYSDEC Environmental Site Remediation database? 9 Yes 9■ No If Yes, provide DEC ID number(s):

iv. If Yes to (i), (ii) or (iii) above, describe current status of site(s):

Page 11 of 15 FEAF 2026 v. Is the project site subject to an institutional control limiting property uses? 9 Yes9 ■ No  If Yes, DEC site ID number:

 Describe the type of institutional control (e.g., deed restriction or easement):

 Describe any use limitations:

 Describe any engineering controls:

 Will the project affect the institutional or engineering controls in place? 9 Yes9 No  Explain:

E.2. Natural Resources On or Near Project Site a. What is the average depth to bedrock on the project site? 6.5+ feet b. Are there bedrock outcroppings on the project site? 9 Yes9 ■ No If Yes, what proportion of the site is comprised of bedrock outcroppings? % c. Predominant soil type(s) present on project site: ChB 100 % ________________________ _________% ________________________ _________% d. What is the average depth to the water table on the project site? Average: 18 feet e. Drainage status of project site soils: 9 Well Drained: % of site 9✔ Moderately Well Drained: 100 % of site

9 Poorly Drained % of site

f. Approximate proportion of proposed action site with slopes: 9✔ 0-10%: 100 % of site 9 10-15%: % of site 9 15% or greater: % of site g. Are there any unique geologic features on the project site? 9 9 Yes ■ No If Yes, describe:

h. Surface water features.

i. Does any portion of the project site contain wetlands or other waterbodies (including streams, rivers, 9■ Yes 9 No ponds, or lakes)?

ii. Do any wetlands or other waterbodies adjoin the project site? 9 Yes ■ No If Yes to either i or ii, continue. If No, skip to E.2.i.

iii. Are any of the wetlands or waterbodies within or adjoining the project site regulated by any federal, 9■ Yes No state or local agency?

iv. For each identified regulated wetland and waterbody on the project site, provide the following information:  Streams: Name Classification • Lakes or Ponds: Name Classification • Wetlands: Name W1a Approximate Size 0.61 ac • Wetland No. (if regulated by DEC) v. Are any of the above water bodies listed in the most recent compilation of NYS water quality-impaired 9 Yes9 ■ No waterbodies?

If Yes, name of impaired water body/bodies and basis for listing as impaired:

i. Is the project site in a designated Floodway? 9 9 ■ No Yes j. Is the project site in the 100-year Floodplain? 9 9 Yes ■ No

9 9

k. Is the project site in the 500-year Floodplain? Yes ■ No

9 9

l. Is the project site located over, or immediately adjoining, a primary, principal or sole source aquifer? Yes ■ No If Yes:

i. Name of aquifer:

Page 12 of 15 FEAF 2026 m. Identify the predominant wildlife species that occupy or use the project site:

None (vacant lot) n. Does the project site contain a designated significant natural community? 9 Yes 9■ No If Yes:

i. Describe the habitat/community (composition, function, and basis for designation):

ii. Source(s) of description or evaluation:

iii. Extent of community/habitat:

 Currently: acres  Following completion of project as proposed: acres  Gain or loss (indicate + or -): acres o. Does project site contain any species of plant or animal that is listed by the federal government or NYS as 9 Yes 9■ No endangered or threatened, or does it contain any areas identified as habitat for an endangered or threatened species? If Yes:

i. Species and listing (endangered or threatened):

p. Does the project site contain any species of plant or animal that is listed by NYS as rare, or as a species of 9 Yes 9■ No special concern?

If Yes:

i. Species and listing:

q. Is the project site or adjoining area currently used for hunting, trapping, fishing or shell fishing? 9 Yes 9■ No If Yes, give a brief description of how the proposed action may affect that use:

E.3. Designated Public Resources On or Near Project Site a. Is the project site, or any portion of it, located in a designated agricultural district certified pursuant to 9 Yes 9■ No Agriculture and Markets Law, Article 25-AA, Section 303 and 304?

If Yes, provide county plus district name/number:

b. Are agricultural lands consisting of highly productive soils present? 9 Yes 9■ No i. If Yes: acreage(s) on project site?

ii. Source(s) of soil rating(s):

c. Does the project site contain all or part of, or is it substantially contiguous to, a registered National 9 Yes 9■ No Natural Landmark?

If Yes:

i. Nature of the natural landmark: 9 Biological Community 9 Geological Feature ii. Provide brief description of landmark, including values behind designation and approximate size/extent: d. Is the project site located in or does it adjoin a state listed Critical Environmental Area? 9 Yes 9■ No If Yes:

i. CEA name:

ii. Basis for designation:

iii. Designating agency and date:

Page 13 of 15 FEAF 2026 [Literal native PDF text; original page 18; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified] m. Identify the predominant wildlife species that occupy or use the project site:

None (vacant lot) n. Does the project site contain a designated significant natural community? 9 Yes 9■ No If Yes:

i. Describe the habitat/community (composition, function, and basis for designation):

ii. Source(s) of description or evaluation:

iii. Extent of community/habitat:

 Currently: acres  Following completion of project as proposed: acres  Gain or loss (indicate + or -): acres o. Does project site contain any species of plant or animal that is listed by the federal government or NYS as 9 Yes 9■ No endangered or threatened, or does it contain any areas identified as habitat for an endangered or threatened species? If Yes:

i. Species and listing (endangered or threatened):

p. Does the project site contain any species of plant or animal that is listed by NYS as rare, or as a species of 9 Yes 9■ No special concern?

If Yes:

i. Species and listing:

q. Is the project site or adjoining area currently used for hunting, trapping, fishing or shell fishing? 9 Yes 9■ No If Yes, give a brief description of how the proposed action may affect that use:

[Literal native PDF text; original page 18; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified] E.3. Designated Public Resources On or Near Project Site a. Is the project site, or any portion of it, located in a designated agricultural district certified pursuant to 9 Yes 9■ No Agriculture and Markets Law, Article 25-AA, Section 303 and 304?

If Yes, provide county plus district name/number:

b. Are agricultural lands consisting of highly productive soils present? 9 Yes 9■ No i. If Yes: acreage(s) on project site?

ii. Source(s) of soil rating(s):

c. Does the project site contain all or part of, or is it substantially contiguous to, a registered National 9 Yes 9■ No Natural Landmark?

If Yes:

i. Nature of the natural landmark: 9 Biological Community 9 Geological Feature ii. Provide brief description of landmark, including values behind designation and approximate size/extent: d. Is the project site located in or does it adjoin a state listed Critical Environmental Area? 9 Yes 9■ No If Yes:

i. CEA name:

ii. Basis for designation:

iii. Designating agency and date:

Page 13 of 15 FEAF 2026 e. Does the project site contain, or is it substantially contiguous to, a building, archaeological site, or district Yes ■ No listed on the National or State Register of Historic Places, or that has been determined by the Commissioner of the NYSOffice of Parks, Recreation and Historic Preservation to be eligible for listing on the State Register of Historic Places? If Yes:

i. Nature of historic/archaeological resource: Archaeological Site Historic Building or District ii. Name:

iii. Brief description of attributes on which listing is based:

f. Is the project site, or any portion of it, located in or adjacent to an area designated as sensitive for Yes ■ No archaeological sites on the New York State Historic Preservation Office (SHPO) archaeological site inventory? g. Have additional archaeological or historic site(s) or resources been identified on the project site? Yes ■ No If Yes:

i. Describe possible resource(s):

ii. Basis for identification:

h. Is the project site within five miles of any officially designated and publicly accessible federal, state, or local ■ Yes No scenic, or aesthetic resource?

If Yes:

i. Identify resource: Clay Central Park, Heritage Park, Onondaga Lake Park, Willow Bay Park ii. Nature of, or basis for, designation (e.g., established highway overlook, state or local park, state historic trail, or scenic byway, etc.): Local Parks iii. Distance between project and resource: 0.5 - 5 miles.

i. Is the project site located within a designated river corridor under the Wild, Scenic and Recreational Rivers Yes ■ No Program 6 NYCRR 666?

If Yes:

i. Identify the name of the river and its designation:

ii. Is the activity consistent with development restrictions contained in 6NYCRR Part 666? Yes No E.4. Disadvantaged Communities Designated Pursuant to ECL Article 75 a. Is the project located within, or within ½ mile of, a disadvantaged community? Yes ■ No If No, could impacts(see examples below in E.4.b) from the project affect a disadvantaged community? Yes ■ No If Yes to either question in E.4.a, answer the remaining questions in this section.

b. Will there be direct or indirect impacts that may affect a disadvantaged community, such as those listed below? Yes ■ No i. new noise sources or expansions/modification of existing noise sources;

- noise from operational sources - noise from construction activities ii. emissions of air pollutants including, mobile emissions;

iii. wastewater discharges;

iv. generation of odors;

v. light pollution;

vi. new or modified radiation sources;

vii. new or modified sources of solid waste generation, management, or disposal.

If Yes, describe the impacts:

c. Do any of the State agency approvals identified in question B.g include any of the following DEC permits? State Pollutant Discharge Elimination System (SPDES) Yes ■ No Solid Waste Management Facility Yes ■ No Hazardous Waste Management Facility Yes ■ No Air Pollution Control (Title V or Air State Facility) Yes ■ No Water Withdrawal over 20 MGD for Cooling Water Yes ■ No Waste Transporter Yes ■ No Page 14 of 15 FEAF 2026 E.5 Future Physical Climate Risks Will the proposed action be vulnerable to the following future physical climate risks under current or projected future conditions: a. Is the proposed action vulnerable to damage from a projected 100-year flood? Yes ■ No b. Is the proposed action vulnerable to damage from a projected 500-year flood? Yes ■ No c. Is the proposed action in an area potentially affected by sea level rise? Yes ■ No d. Will the proposed action increase the vulnerability of human or ecological communities to the following: i. drought? Yes ■ No ii. temperature extremes (hot or cold)? Yes ■ No iii. extreme storms, including high winds? Yes ■ No iv. landslides? Yes ■ No v. coastal erosion? Yes ■ No vi. stormwater flooding? Yes ■ No vii. other climate or weather hazards? Yes ■ No If Yes, describe: _____________________________________ F. Additional Information Attach any additional information which may be needed to clarify your project.

If you have identified any adverse impacts which could be associated with your proposal, please describe those impacts plus any measures which you propose to avoid or minimize them.

G. Verification I certify that the information provided is true to the best of my knowledge.

James T. McEnaney III

Applicant/Sponsor Name Date 08/28/2026 Principal Engineer VI Signature Title Page 15 of 15 FEAF 2026 EAF Mapper Summary Report Friday, August 21, 2026 1:18 PM Disclaimer: The EAF Mapper is a screening tool intended to assist project sponsors and reviewing agencies in preparing an environmental assessment form (EAF). Not all questions asked in the EAF are answered by the EAF Mapper. Additional information on any EAF question can be obtained by consulting the EAF Workbooks. Although the EAF Mapper provides the most up-to-date digital data available to DEC, you may also need to contact local or other data sources to confirm data provided by the Mapper or to obtain data not provided by the Mapper.

B.i.i [Coastal or Waterfront Area] No B.i.ii [Local Waterfront Revitalization Area] Yes C.2.b. [Special Planning District] Digital mapping data are not available or are incomplete. Refer to EAF Workbook.

E.1.h [DEC Spills or Remediation Site - Digital mapping data are not available or are incomplete. Refer to EAF Potential Contamination History] Workbook.

E.1.h.i [DEC Spills or Remediation Site - Digital mapping data are not available or are incomplete. Refer to EAF Listed] Workbook.

E.1.h.i [DEC Spills or Remediation Site - Digital mapping data are not available or are incomplete. Refer to EAF Environmental Site Remediation Database] Workbook.

E.1.h.iii [Within 2,000' of DEC Remediation No Site] E.2.g [Unique Geologic Features] No E.2.h.i [Surface Water Features] Digital mapping data are not available or are incomplete. Refer to EAF Workbook.

E.2.h.ii [Surface Water Features] Digital mapping data are not available or are incomplete. Refer to EAF Workbook.

E.2.h.iii [Surface Water Features] Digital mapping data are not available or are incomplete. Refer to EAF Workbook.

E.2.h.v [Impaired Water Bodies] No E.2.i. [Floodway] No E.2.j. [100 Year Floodplain] No E.2.k. [500 Year Floodplain] No E.2.l. [Aquifers] No E.2.n. [Natural Communities] No E.2.o. [Endangered or Threatened Species] No Full Environmental Assessment Form - EAF Mapper Summary Report 1 E.2.p. [Rare Plants or Animals] No E.3.a. [Agricultural District] No E.3.c. [National Natural Landmark] No E.3.d [Critical Environmental Area] No E.3.e. [National or State Register of Historic Digital mapping data are not available or are incomplete. Refer to EAF Places or State Eligible Sites] Workbook.

E.3.f. [Archeological Sites] No E.3.i. [Designated River Corridor] No E.4.a [Disadvantaged Community] No Full Environmental Assessment Form - EAF Mapper Summary Report 2 Drawing Copyright © 2026 [Literal native PDF text; original page 21; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified] EAF Mapper Summary Report Friday, August 21, 2026 1:18 PM Disclaimer: The EAF Mapper is a screening tool intended to assist project sponsors and reviewing agencies in preparing an environmental assessment form (EAF). Not all questions asked in the EAF are answered by the EAF Mapper. Additional information on any EAF question can be obtained by consulting the EAF Workbooks. Although the EAF Mapper provides the most up-to-date digital data available to DEC, you may also need to contact local or other data sources to confirm data provided by the Mapper or to obtain data not provided by the Mapper.

[Literal native PDF text; original page 21; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified] B.i.i [Coastal or Waterfront Area] No B.i.ii [Local Waterfront Revitalization Area] Yes C.2.b. [Special Planning District] Digital mapping data are not available or are incomplete. Refer to EAF Workbook.

E.1.h [DEC Spills or Remediation Site - Digital mapping data are not available or are incomplete. Refer to EAF Potential Contamination History] Workbook.

E.1.h.i [DEC Spills or Remediation Site - Digital mapping data are not available or are incomplete. Refer to EAF Listed] Workbook.

E.1.h.i [DEC Spills or Remediation Site - Digital mapping data are not available or are incomplete. Refer to EAF Environmental Site Remediation Database] Workbook.

E.1.h.iii [Within 2,000' of DEC Remediation No Site] E.2.g [Unique Geologic Features] No E.2.h.i [Surface Water Features] Digital mapping data are not available or are incomplete. Refer to EAF Workbook.

E.2.h.ii [Surface Water Features] Digital mapping data are not available or are incomplete. Refer to EAF Workbook.

E.2.h.iii [Surface Water Features] Digital mapping data are not available or are incomplete. Refer to EAF Workbook.

E.2.h.v [Impaired Water Bodies] No E.2.i. [Floodway] No E.2.j. [100 Year Floodplain] No E.2.k. [500 Year Floodplain] No E.2.l. [Aquifers] No E.2.n. [Natural Communities] No E.2.o. [Endangered or Threatened Species] No [Literal native PDF text; original page 21; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified] Full Environmental Assessment Form - EAF Mapper Summary Report 1 [Literal native PDF text; original page 22; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified] E.2.p. [Rare Plants or Animals] No E.3.a. [Agricultural District] No E.3.c. [National Natural Landmark] No E.3.d [Critical Environmental Area] No E.3.e. [National or State Register of Historic Digital mapping data are not available or are incomplete. Refer to EAF Places or State Eligible Sites] Workbook.

E.3.f. [Archeological Sites] No E.3.i. [Designated River Corridor] No E.4.a [Disadvantaged Community] No Full Environmental Assessment Form - EAF Mapper Summary Report 2

WETZEL BESS A&B

III Winners Circle, PO Box 5269 Albany, NY 12205-0269 518.453.4500 . www.chasolutions.com COI # 0021745

7846 & 7850 GOGUEN RD

CLAY, NY 13090

PRELIMINARY SITE PLAN SUBMISSION

IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE

ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL

ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT OR LAND

SURVEYOR TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE

STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING

ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT OR LAND

SURVEYOR SHALL STAMP THE DOCUMENT AND INCLUDE THE

NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE

DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION

OF THE ALTERATION.

SITE

WETZEL BESS A&B

7846 & 7850 GOGUEN RD

CLAY, NY 13090

No. Submittal / Revision Apv By Date Saved: 8/19/2026 4:08:18 PM Plotted: 8/19/2026 4:09:00 PM Current User: Ordway, Jackson LastSavedBy: 9237 © 2025 Microsoft Corporation © 2025 TomTom SCALE: 1"=2,000' File: V:\PROJECTS\ANY\K7\104932.000\09_DESIGN\DRAWINGS\01_SHEETS\G-001 - COVER SHEET.DWG

REV PER PLANNING

B JM JO 08/19/26

BOARD COMMENTS

REV PER PLANNING

A JM JO 02/10/26

BOARD COMMENTS

OWNER/APPICANT

CONSULTANT

COVER SHEET

Designed By: Drawn By: Checked By:

JM JO JR

AUGUST 19, 2026

Issue Date: Project No.: Scale:

08/19/26 104932 AS SHOWN

39 BROADWAY Drawing No.: 32ND FLOOR III WINNERS CIRCLE NEW YORK, NY 10006 ALBANY, NY 12206 G-001 Drawing Copyright © 2026 [Literal native PDF text; original page 23; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified] Drawing Copyright © 2026 [Literal native PDF text; original page 23; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified]

WETZEL BESS A&B

III Winners Circle, PO Box 5269 Albany, NY 12205-0269 518.453.4500 . www.chasolutions.com COI # 0021745 [Literal native PDF text; original page 23; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified]

7846 & 7850 GOGUEN RD

CLAY, NY 13090

[Literal native PDF text; original page 23; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified]

PRELIMINARY SITE PLAN SUBMISSION

[Literal native PDF text; original page 23; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified]

IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE

ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL

ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT OR LAND

SURVEYOR TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE

STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING

ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT OR LAND

SURVEYOR SHALL STAMP THE DOCUMENT AND INCLUDE THE

NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE

DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION

OF THE ALTERATION. [Literal native PDF text; original page 23; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified]

SITE

[Literal native PDF text; original page 23; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified]

WETZEL BESS A&B

7846 & 7850 GOGUEN RD

CLAY, NY 13090

[Literal native PDF text; original page 23; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified] No. Submittal / Revision Apv By Date Saved: 8/19/2026 4:08:18 PM Plotted: 8/19/2026 4:09:00 PM Current User: Ordway, Jackson LastSavedBy: 9237 © 2025 Microsoft Corporation © 2025 TomTom SCALE: 1"=2,000' File: V:\PROJECTS\ANY\K7\104932.000\09_DESIGN\DRAWINGS\01_SHEETS\G-001 - COVER SHEET.DWG [Literal native PDF text; original page 23; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified]

REV PER PLANNING

B JM JO 08/19/26

BOARD COMMENTS

[Literal native PDF text; original page 23; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified]

REV PER PLANNING

A JM JO 02/10/26

BOARD COMMENTS

[Literal native PDF text; original page 23; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified]

OWNER/APPICANT

CONSULTANT

COVER SHEET

[Literal native PDF text; original page 23; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified] Designed By: Drawn By: Checked By:

JM JO JR

[Literal native PDF text; original page 23; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified]

AUGUST 19, 2026

Issue Date: Project No.: Scale:

08/19/26 104932 AS SHOWN

[Literal native PDF text; original page 23; source SHA256 cf540ee1704cb18ff2d7399216e8146b61b91507f1f420b784f0a5625e5c72b2; extraction completeness unverified] 39 BROADWAY Drawing No.: 32ND FLOOR III WINNERS CIRCLE NEW YORK, NY 10006 ALBANY, NY 12206 G-001 III Winners Circle, PO Box 5269 Albany, NY 12205-0269 518.453.4500 . www.chasolutions.com COI # 0021745

IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE

ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL

ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT OR LAND

SURVEYOR TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE

STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING

ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT OR LAND

SURVEYOR SHALL STAMP THE DOCUMENT AND INCLUDE THE

NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE

DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION

OF THE ALTERATION.

This is a long document — showing the opening sections. Read the complete text.

parcel 087.-01-08.2 parcel 087.-01-53 zoning district I-1