Environmental Assessment Form From FSGEIS Completed by OCIDA Full Environmental Assessment Form Part 1 - Project and Setting Instructions for Completing Part 1 Part 1 is to be completed by the applicant or project sponsor. Responses become part of the application for approval or funding, are subject to public review, and may be subject to further verification. Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as thoroughly as possible based on current information; indicate whether missing information does not exist, or is not reasonably available to the sponsor; and, when possible, generally describe work or studies which would be necessary to update or fully develop that information.
Applicants/sponsors must complete all items in Sections A & B. In Sections C, D & E, most items contain an initial question that must be answered either “Yes” or “No”. If the answer to the initial question is “Yes”, complete the sub-questions that follow. If the answer to the initial question is “No”, proceed to the next question. Section F allows the project sponsor to identify and attach any additional information. Section G requires the name and signature of the applicant or project sponsor to verify that the information contained in Part lis accurate and complete.
A. Project and Applicant/Sponsor Information.
Name of Action or Project:
White Pine Commerce Park (formerly known as the Clay Business Park) Project Location (describe, and attach a general location map):
Brief Description of Proposed Action (include purpose or need):
The Onondaga County Industrial Development Agency (OCIDA) proposes to expand its White Pine Commerce Park (the Park) in the Town of Clay, Onondaga County, NY. The project site is approximately 1,250 acres, of which the County currently owns 450 acres. The expanded Park will be capable of supporting a mix of industrial and/or commercial uses that may include industrially related office, research, manufacturing, assembly, warehousing, data management, material processing and distribution facilities in a campus-like setting. The purpose of the proposed expansion will enable OCIDA to market the Park to a larger, more diverse mix of potential developers, allowing development of the site for advanced forms of manufacturing and state-of-the-art _ industrial uses to facilitate the creation of high-paying employment opportunities in Onondaga County. The Park has many important attributes that make it particularly well suited to large-scale industrial and/or commercial use. The Park is accessible from major nearby interstates and State and Gounty ighways. This includes Interstate 81 (I-81) via Exit 30 at NYS Route 31 in Cicero, approximately 2.2 miles east of the project site. The I-81 interchange at Bartell Road (Exit 31) is approximately 3 miles north of the site, and the Interstate 81/481 interchange is 4 miles to the southeast. The I-481/NYSRoute 31 interchange is approximately 3.5 miles west of the Park. The New York State Thruway (I-90) is about 6.5 miles south of the Park. Syracuse Hancock International Airport is about 5 miles south of the Park along the I-81 corridor. Name of Applicant/Sponsor: Telephone: (315) 435-3770 Onondaga County Industrial Development Agency (OCIDA) E-Mail:
* economicdevelopment@ongov.net Address: 355 yy washington St #130 City/PO: Syracuse State: New York Zip Code: 19202 Project Contact (if not same as sponsor; give name and title/role): Telephone: (315) 435-3770 Robert M. Petrovich — Executive Director E-Mail: robertpetrovich@ongov.net Address:
City/PO: State: Zip Code:
Property Owner (if not same as sponsor): Telephone:
E-Mail:
Address:
City/PO: State: Zip Code:
Page | of 13 B. Government Approvals B. Government Approvals, Funding, or Sponsorship. (“Funding” includes grants, loans, tax relief, and any other forms of financial assistance.) Government Entity If Yes: Identify Agency and Approval(s) Application Date Required (Actual or projected) a. City Counsel, Town Board, WlYes[_]No__ | See attachment {od or Village Board of Trustees b. City, Town or Village WlYesLINo _ | see attachment tbd Planning Board or Commission c. City, Town or WYesCINo see attachment tbd Village Zoning Board of Appeals d. Other local agencies WYesLINo _ [see attachment tod e. County agencies MYesLINo — [See attachment ted f. Regional agencies WyYesLINo_ [S°° attachment tod g. State agencies WlYesLINo [See attachment tbd h. Federal agencies WYesCNo see attachment tbd i. Coastal Resources.
i. Is the project site within a Coastal Area, or the waterfront area of a Designated Inland Waterway? L1YesMINo ii. Is the project site located in a community with an approved Local Waterfront Revitalization Program? YesLINo iii. Is the project site within a Coastal Erosion Hazard Area? CD YesZJNo C. Planning and Zoning C.1. Planning and zoning actions.
Will administrative or legislative adoption, or amendment of a plan, local law, ordinance, rule or regulation be the [1YesINo only approval(s) which must be granted to enable the proposed action to proceed? e If Yes, complete sections C, F and G.
¢ If No, proceed to question C.2 and complete all remaining sections and questions in Part 1 C.2. Adopted land use plans.
a. Do any municipally- adopted (city, town, village or county) comprehensive land use plan(s) include the site WYesLINo where the proposed action would be located?
If Yes, does the comprehensive plan include specific recommendations for the site where the proposed action WYesLINo would be located?
b. Is the site of the proposed action within any local or regional special planning district (for example: Greenway; CYesWINo Brownfield Opportunity Area (BOA); designated State or Federal heritage area; watershed management plan; or other?) If Yes, identify the plan(s):
c. Is the proposed action located wholly or partially within an area listed in an adopted municipal open space plan, [JYesWJNo or an adopted municipal farmland protection plan?
If Yes, identify the plan(s):
C.3. Zoning a. Is the site of the proposed action located in a municipality with an adopted zoning law or ordinance. MW YesLNo If Yes, what is the zoning classification(s) including any applicable overlay district? A portion of the site is zoned Residential Agricultural District (RA-100), another portion is zoned Industrial 2 (I-2), and a small portion of the site zoned as One Family Residential (R-15). The Project is consistent with the intended uses in the community development plan. Some rezoning will be needed. b. Is the use permitted or allowed by a special or conditional use permit? YesL]No c. Is a zoning change requested as part of the proposed action? YesL]No If Yes, i. What is the proposed new zoning for the site? _!-2 Industrial 2 C.4. Existing community services.
a. In what school district is the project site located? North Syracuse Central School District b. What police or other public protection forces serve the project site? Onondaga County Sheriff's Department c. Which fire protection and emergency medical services serve the project site? Clay Volunteer Fire Dept (VFD), Meyers Corner FD, Brewerton Fire District, North Syracuse FD, Caughdenoy VFD, Emergency Medical -NAVAC_& NOVA d. What parks serve the project site?
Two Town of Clay parks are located within one mile of the project site. These include Meltzer Park and the Clay Historical Park. D. Project Details D.1. Proposed and Potential Development a. What is the general nature of the proposed action (e.g., residential, industrial, commercial, recreational; if mixed, include all components)? OCIDA proposes to develop a modern industrial and commercial park on the County’s White Pine Commerce Park consisting of industrial and commercial uses that may include office, research, manufacturing, warehouse, assembly, or distribution facilities. b. a. Total acreage of the site of the proposed action? 1,253+/- acres b. Total acreage to be physically disturbed? TBD acres c. Total acreage (project site and any contiguous properties) owned or controlled by the applicant or project sponsor? 646 acres c. Is the proposed action an expansion of an existing project or use? M1 YesL] No i. If Yes, what is the approximate percentage of the proposed expansion and identify the units (e.g., acres, miles, housing units, square feet)? % Units: 800 acres d. Is the proposed action a subdivision, or does it include a subdivision? OYes WINo If Yes, i. Purpose or type of subdivision? (e.g., residential, industrial, commercial; if mixed, specify types) ii. Is a cluster/conservation layout proposed? CYes LINo iii. Number of lots proposed?
iv. Minimum and maximum proposed lot sizes? Minimum Maximum e. Will the proposed action be constructed in multiple phases? WYesLINo i. If No, anticipated period of construction: months ii. If Yes:
¢ Total number of phases anticipated 2 « Anticipated commencement date of phase | (including demolition) TBD month year e Anticipated completion date of final phase TBD month year e¢ Generally describe connections or relationships among phases, including any contingencies where progress of one phase may determine timing or duration of future phases:
Phase | may include development of manufacturing facilities on a portion of the property. Phase II is envisioned as primarily research and development activities on a smaller portion of the property. f. Does the project include new residential uses? DYesWNo If Yes, show numbers of units proposed.
One Family Two Family Three Family Multiple Family (four or more) Initial Phase At completion of all phases g. Does the proposed action include new non-residential construction (including expansions)? WYesL]No If Yes, i, Total number of structures 15 - 30 ii. Dimensions (in feet) of largest proposed structure: _40'- 70' height; 1250'-1500'width; and 1250'-1500length iii. Approximate extent of building space to be heated or cooled: 4-5 million square feet h. Does the proposed action include construction or other activities that will result in the impoundment of any WYesLJNo liquids, such as creation of a water supply, reservoir, pond, lake, waste lagoon or other storage? If Yes, i. Purpose of the impoundment: stormwater management ii. If a water impoundment, the principal source of the water: LJ Ground water [1] Surface water streams W|Other specify: stormwater iii. If other than water, identify the type of impounded/contained liquids and their source. iv. Approximate size of the proposed impoundment. Volume: TBD million gallons; surface area: TBD acres v. Dimensions of the proposed dam or impounding structure: TBD height; TBD length vi. Construction method/materials for the proposed dam or impounding structure (e.g., earth fill, rock, wood, concrete): TBD D.2. Project Operations a. Does the proposed action include any excavation, mining, or dredging, during construction, operations, or both? []Ye (Not including general site preparation, grading or installation of utilities or foundations where all excavated materials will remain onsite) If Yes:
i.What is the purpose of the excavation or dredging?
ii. How much material (including rock, earth, sediments, etc.) is proposed to be removed from the site? « Volume (specify tons or cubic yards):
¢ Over what duration of time?
iii. Describe nature and characteristics of materials to be excavated or dredged, and plans to use, manage or dispose of them. iv. Will there be onsite dewatering or processing of excavated materials? L]YesWJNo If yes, describe.
v. What is the total area to be dredged or excavated? TBD acres vi. What is the maximum area to be worked at any one time? TBD_ acres vii. What would be the maximum depth of excavation or dredging? TBD feet viii. Will the excavation require blasting? LYesVJNo ix. Summarize site reclamation goals and plan:
Conduct excavations and restoration consistent with regulatory permit requirements and guidance. b. Would the proposed action cause or result in alteration of, increase or decrease in size of, or encroachment Yes[|_|No into any existing wetland, waterbody, shoreline, beach or adjacent area? If Yes:
i. Identify the wetland or waterbody which would be affected (by name, water index number, wetland map number or geographic description): Potentially NYSDEC Class C Stream No. 899-10 (Tributaries of Oneida River); NYSDEC Wetlands BRE-11 & BRE-14; and onsite NWI mapped wetlands.
ii. Describe how the proposed action would affect that waterbody or wetland, e.g. excavation, fill, placement of structures, or alteration of channels, banks and shorelines. Indicate extent of activities, alterations and additions in square feet or acres: Specific impacts will be determined by site plan development; potential impacts could include placement of fill or structures for outfall
locations. iii. Will the proposed action cause or result in disturbance to bottom sediments? DIYesINo If Yes, describe:
iv. Will the proposed action cause or result in the destruction or removal of aquatic vegetation? C1 Yes/No If Yes:
« acres of aquatic vegetation proposed to be removed:
* expected acreage of aquatic vegetation remaining after project completion: ¢ purpose of proposed removal (e.g. beach clearing, invasive species control, boat access): ¢ proposed method of plant removal:
e if chemical/herbicide treatment will be used, specify product(s):
v. Describe any proposed reclamation/mitigation following disturbance:
TBD c. Will the proposed action use, or create a new demand for water? WYesLINo If Yes:
i. Total anticipated water usage/demand per day: TBD gallons/day ii, Will the proposed action obtain water from an existing public water supply? WYes LINo If Yes:
e Name of district or service area: Town of Clay UWD / Onondaga County Water Authority (line owned by Metropolitan Water Board) * Does the existing public water supply have capacity to serve the proposal? TBD C1YesL]No e — Is the project site in the existing district? D1 Yes] No e — Is expansion of the district needed? OYesL No ¢ Do existing lines serve the project site? DO YesL No iii. Will line extension within an existing district be necessary to supply the project? CYes No If Yes:
e Describe extensions or capacity expansions proposed to serve this project: TBD e Source(s) of supply for the district:
iv. Is a new water supply district or service area proposed to be formed to serve the project site? D YesWINo If, Yes:
e¢ Applicant/sponsor for new district:
e Date application submitted or anticipated:
¢ Proposed source(s) of supply for new district:
v. If a public water supply will not be used, describe plans to provide water supply for the project: vi. If water supply will be from wells (public or private), what is the maximum pumping capacity: gallons/minute. d. Will the proposed action generate liquid wastes? WYesLINo If Yes:
i. Total anticipated liquid waste generation per day: TBD gallons/day ii. Nature of liquid wastes to be generated (e.g., sanitary wastewater, industrial; if combination, describe all components and approximate volumes or proportions of each):
Sanitary wastewater, potentially industrial associated with future industrial processes. Nature and volume of liquid waste to be generated are to be determined.
iii. Will the proposed action use any existing public wastewater treatment facilities? WYesJNo If Yes:
e Name of wastewater treatment plant to be used: Oak Orchard Wastewater Treatment Plant e Name of district: Onondaga County Consolidated Sewer District © Does the existing wastewater treatment plant have capacity to serve the project? TBD. Limiting factor may be W] Yes[_JNo e — Is the project site in the existing district? BOD not volume. WlYes[JNo e — Is expansion of the district needed? CYesYINo e Do existing sewer lines serve the project site? D1YesWNo e Willa line extension within an existing district be necessary to serve the project? WYesLJNo If Yes:
e Describe extensions or capacity expansions proposed to serve this project: Installation of dual and parallel 6-inch and 12-inch diameter PVC force mains for a total of approximately 4.3 miles. Necessary improvements to the existing OOWT Plant to accommodate the project are being evaluated.
iv. Will a new wastewater (sewage) treatment district be formed to serve the project site? WYesLNo If Yes:
e¢ Applicant/sponsor for new district: OCIDA e Date application submitted or anticipated: TBD . What is the receiving water for the wastewater discharge? Oneida River v. If public facilities will not be used, describe plans to provide wastewater treatment for the project, including specifying proposed receiving water (name and classification if surface discharge or describe subsurface disposal plans): vi. Describe any plans or designs to capture, recycle or reuse liquid waste: e. Will the proposed action disturb more than one acre and create stormwater runoff, either from new point WyYesL]No sources (i.e. ditches, pipes, swales, curbs, gutters or other concentrated flows of stormwater) or non-point source (i.e. sheet flow) during construction or post construction?
If Yes:
i. How much impervious surface will the project create in relation to total size of project parcel? Square feet or _ TBD acres (impervious surface) Square feet or _ 1253 acres (parcel size) ii. Describe types of new point sources. Ditches, pipes, curbs, gutters, detention pond outfalls, etc. iii. Where will the stormwater runoff be directed (i.e. on-site stormwater management facility/structures, adjacent properties, groundwater, on-site surface water or off-site surface waters)?
Onsite stormwater management facility and/or offsite discharge to tributaries of Oneida River. e If to surface waters, identify receiving water bodies or wetlands:
Oneida River e Will stormwater runoff flow to adjacent properties? LYesW] No iv. Does the proposed plan minimize impervious surfaces, use pervious materials or collect and re-use stormwater? W1Yes[_]No f. Does the proposed action include, or will it use on-site, one or more sources of air emissions, including fuel WyYesCINo combustion, waste incineration, or other processes or operations?
If Yes, identify:
i. Mobile sources during project operations (e.g., heavy equipment, fleet or delivery vehicles) Delivery and employee vehicles.
ii, Stationary sources during construction (e.g., power generation, structural heating, batch plant, crushers) Potentially power generation.
iii. Stationary sources during operations (e.g., process emissions, large boilers, electric generation) Site tenant activity may produce process emissions. Certain facilities may require back-up power generation. g. Will any air emission sources named in D.2.f (above), require a NY State Air Registration, Air Facility Permit, WYes[JNo or Federal Clean Air Act Title IV or Title V Permit?
If Yes:
i. Is the project site located in an Air quality non-attainment area? (Area routinely or periodically fails to meet LYesMINo ambient air quality standards for all or some parts of the year) ii. In addition to emissions as calculated in the application, the project will generate: . TBD Tons/year (short tons) of Carbon Dioxide (CO) . TBD Tons/year (short tons) of Nitrous Oxide (NO) . TBD Tons/year (short tons) of Perfluorocarbons (PFCs) e TBD Tons/year (short tons) of Sulfur Hexafluoride (SF,) . TBD Tons/year (short tons) of Carbon Dioxide equivalent of Hydroflourocarbons (HFCs) . TBD Tons/year (short tons) of Hazardous Air Pollutants (HAPs) h. Will the proposed action generate or emit methane (including, but not limited to, sewage treatment plants, DYesW] No landfills, composting facilities)?
If Yes:
i, Estimate methane generation in tons/year (metric):
ii. Describe any methane capture, control or elimination measures included in project design (e.g., combustion to generate heat or electricity, flaring):
1. Will the proposed action result in the release of air pollutants from open-air operations or processes, such as OYesM] No quarry or landfill operations?
If Yes: Describe operations and nature of emissions (e.g., diesel exhaust, rock particulates/dust): j. Will the proposed action result in a substantial increase in traffic above present levels or generate substantial WYes[_]No new demand for transportation facilities or services?
If Yes:
i. When is the peak traffic expected (Check all that apply): ©] Morning MW Evening WWeekend OJ Randomly between hours of to ii. For commercial activities only, projected number of truck trips/day and type (e.g., semi trailers and dump trucks): 10 to 30 trucks/peak hour (approximately 2% to 5% of vehicle trips/hr for 870,000 SF logistics, warehousing, and/or shipping & receiving space) iii. Parking spaces: Existing 0 Proposed >500 Net increase/decrease >500 iv. Does the proposed action include any shared use parking? OyesWINo v. Ifthe proposed action includes any modification of existing roads, creation of new roads or change in existing access, describe: Caughdenoy Road/NYS Route 31 improvements; right-in driveway on NYS Route 31; widen Caughdenoy Road; signal timing adjustments, I-81 ramps vi. Are public/private transportation service(s) or facilities available within /% mile of the proposed site? L1YesfJ] No vii Will the proposed action include access to public transportation or accommodations for use of hybrid, electric | []Yesl¥]No or other alternative fueled vehicles?
viii. Will the proposed action include plans for pedestrian or bicycle accommodations for connections to existing OYesW] No pedestrian or bicycle routes?
k. Will the proposed action (for commercial or industrial projects only) generate new or additional demand MYesL]No for energy?
If Yes:
i. Estimate annual electricity demand during operation of the proposed action: TBD ii. Anticipated sources/suppliers of electricity for the project (e.g., on-site combustion, on-site renewable, via grid/local utility, or other):
National Grid iii. Will the proposed action require a new, or an upgrade, to an existing substation? WYesL]No 1. Hours of operation. Answer all items which apply.
i. During Construction: ii. During Operations:
© = Monday - Friday: 7AM-7PM ¢ ~~ Monday - Friday: 24 hours/day e = Saturday: 7AM-7PM e — Saturday: 24 hours/day e Sunday: N/A e = Sunday: 24 hours/day ¢ Holidays: N/A . Holidays: 24 hours/day m. Will the proposed action produce noise that will exceed existing ambient noise levels during construction, MW YesLINo operation, or both?
If yes:
i. Provide details including sources, time of day and duration:
Noise generated from construction (M-F 7am-7pm) and site operations (24/7) are expected to contribute to sound levels within the Town of Clay Code. There is a potential for project noise to exceed ambient noise levels. Site layout will mitigate operational noise levels to the greatest extent possible. ii. Will the proposed action remove existing natural barriers that could act as a noise barrier or screen? MW YesLINo Describe: Onsite tree removal is proposed as part of the site development. Site layout and the possible implementation of berms will mitigate this. n. Will the proposed action have outdoor lighting? MW YesLNo If yes:
i. Describe source(s), location(s), height of fixture(s), direction/aim, and proximity to nearest occupied structures: Light sources could include pole-mounted and/or building-mounted. Luminaries which are dark-sky friendly, high-efficiency LED lights with cut off shields to provide uniform and energy conscious illumination to walkways and parking lots will be implemented to the greatest extent possible. ii. Will proposed action remove existing natural barriers that could act as a light barrier or screen? M YesLINo Describe: Onsite tree removal is proposed as part of site development.
o. Does the proposed action have the potential to produce odors for more than one hour per day? O1YesMINo If Yes, describe possible sources, potential frequency and duration of odor emissions, and proximity to nearest occupied structures:
p. Will the proposed action include any bulk storage of petroleum (combined capacity of over 1,100 gallons) MW YesLINo or chemical products 185 gallons in above ground storage or any amount in underground storage? If Yes:
i. Product(s) to be stored Petroleum, miscellaneous chemicals needed to support manufacturing and research & development. ii. Volume(s) TBD per unit time (e.g., month, year) iii. Generally, describe the proposed storage facilities:
Tanks and containers that are compliant with regulations. Secondary containment structures, as warranted. q. Will the proposed action (commercial, industrial and recreational projects only) use pesticides (i.e., herbicides, OYes YNo insecticides) during construction or operation?
If Yes:
i. Describe proposed treatment(s):
ii, Will the proposed action use Integrated Pest Management Practices? O Yes LINo r. Will the proposed action (commercial or industrial projects only) involve or require the management or disposal MW) Yes LJNo of solid waste (excluding hazardous materials)?
If Yes:
i. Describe any solid waste(s) to be generated during construction or operation of the facility: ¢ Construction: TBD tons per day (unit of time) e Operation : 20-30 tons per day (unit of time) ii. Describe any proposals for on-site minimization, recycling or reuse of materials to avoid disposal as solid waste: e Construction: Onsite recycling will be provided and privately hauled to recycling facility. e Operation: Onsite recycling will be provided and privately hauled to recycling facility. iii. Proposed disposal methods/facilities for solid waste generated on-site: e Construction: Solid waste will be handled by a private contractor or municipality. « Operation: _ Solid waste will be handled by a private contractor or municipality. s. Does the proposed action include construction or modification of a solid waste management facility? OJ Yes WM] No If Yes:
i. Type of management or handling of waste proposed for the site (e.g., recycling or transfer station, composting, landfill, or other disposal activities):
ii, Anticipated rate of disposal/processing:
. Tons/month, if transfer or other non-combustion/thermal treatment, or . Tons/hour, if combustion or thermal treatment iii. If landfill, anticipated site life: years t. Will the proposed action at the site involve the commercial generation, treatment, storage, or disposal of hazardous W/Yes[_]No waste?
If Yes:
i. Name(s) of all hazardous wastes or constituents to be generated, handled or managed at facility: TBD ii. Generally describe processes or activities involving hazardous wastes or constituents: Manufacturing, laboratory chemicals.
iii. Specify amount to be handled or generated tons/month iv. Describe any proposals for on-site minimization, recycling or reuse of hazardous constituents: Re-use and recycle, whenever possible.
v. Will any hazardous wastes be disposed at an existing offsite hazardous waste facility? WyesL]No If Yes: provide name and location of facility:
TBD If No: describe proposed management of any hazardous wastes which will not be sent to a hazardous waste facility: E. Site and Setting of Proposed Action E.1. Land uses on and surrounding the project site a. Existing land uses.
i. Check all uses that occur on, adjoining and near the project site.
O Urban Industrial Commercial Residential (suburban) Rural (non-farm) Forest W Agriculture [] Aquatic O Other (specify):
ii. If mix of uses, generally describe:
The site is bounded by highway commercial uses to the south, industrial uses to the west, residential agricultural use to the north, and commercial. residential, and undeveloped lands to the east.
b. Land uses and covertypes on the project site. Values provided are estimates. Land use or Current Acreage After Change Covertype Acreage Project Completion (Acres +/-) * Roads, buildings, and other paved or impervious surfaces 5 200 to 250 + 195 to 245 e Forested “| © Meadows, grasslands or brushlands (non- | 750 combined | 300 to 380 | ee te 35° agricultural, including abandoned agricultural) e = Agricultural : . 20 0 - 20 (includes active orchards, field, greenhouse etc.) e Surface water features ; 10 20 to 30 +10 to 20 (lakes, ponds, streams, rivers, etc.) e Wetlands (freshwater or tidal) 469 469 0 « Non-vegetated (bare rock, earth or fill) 0 0 0 * Other Describe: N/A N/A N/A c. Is the project site presently used by members of the community for public recreation? LYesl¥]No i. If Yes: explain:
d. Are there any facilities serving children, the elderly, people with disabilities (e.g., schools, hospitals, licensed WYes_]No day care centers, or group homes) within 1500 feet of the project site?
If Yes, i. Identify Facilities:
The Cottages at Garden Grove is a nursing home located approximately 200 ft. east of the site at 5460 Meltzer Ct. in Cicero; Grace Evangelical Covenant Church is located at 5300 NY-31 in Clay, and ~200 ft. south of the proposed project site. The church runs a pre-school program. e. Does the project site contain an existing dam? DYesW] No If Yes:
i. Dimensions of the dam and impoundment:
¢ Dam height: feet e Dam length: feet e Surface area: acres ¢ Volume impounded: gallons OR acre-feet ii. Dam’s existing hazard classification:
iii. Provide date and summarize results of last inspection:
f. Has the project site ever been used as a municipal, commercial or industrial solid waste management facility, O1YesW]No or does the project site adjoin property which is now, or was at one time, used as a solid waste management facility? If Yes:
i. Has the facility been formally closed? OYesCX] No e = Ifyes, cite sources/documentation:
ii. Describe the location of the project site relative to the boundaries of the solid waste management facility: iii. Describe any development constraints due to the prior solid waste activities: g. Have hazardous wastes been generated, treated and/or disposed of at the site, or does the project site adjoin DYesWNo property which is now or was at one time used to commercially treat, store and/or dispose of hazardous waste? If Yes:
i. Describe waste(s) handled and waste management activities, including approximate time when activities occurred: h. Potential contamination history. Has there been a reported spill at the proposed project site, or have any WYesl] No remedial actions been conducted at or adjacent to the proposed site?
If Yes:
i. Is any portion of the site listed on the NYSDEC Spills Incidents database or Environmental Site WM YesL]No Remediation database? Check all that apply:
Yes — Spills Incidents database Provide DEC ID number(s): Spill No. 2005446 OO Yes — Environmental Site Remediation database Provide DEC ID number(s):
ii. If site has been subject of RCRA corrective activities, describe control measures: Not applicable iii. Is the project within 2000 feet of any site in the NYSDEC Environmental Site Remediation database? DYesWNo If yes, provide DEC ID number(s):
iv. If yes to (i), (ii) or (iii) above, describe current status of site(s): v. Is the project site subject to an institutional control limiting property uses? L1YesWINo e Ifyes, DEC site ID number:
e Describe the type of institutional control (e.g., deed restriction or easement): ¢ Describe any use limitations:
e Describe any engineering controls:
e Will the project affect the institutional or engineering controls in place? DYes-JNo e Explain:
E.2. Natural Resources On or Near Project Site a. What is the average depth to bedrock on the project site? 10-15 feet b. Are there bedrock outcroppings on the project site? D1 YesWJNo If Yes, what proportion of the site is comprised of bedrock outcroppings? % c. Predominant soil type(s) present on project site: Niagara silt loam, 0 to 4% slopes 41.56 % Collamer silt loam, 2 to 6% slopes 26.95 % Hilton loam, 3 to 8% slopes 5.9% d. What is the average depth to the water table on the project site? Average: 4.5 feet e. Drainage status of project site soils:W] Well Drained: 5 % of site Moderately Well Drained: 42 % of site Poorly Drained 53 % of site f. Approximate proportion of proposed action site with slopes: ¥] 0-10%: 98.46 % of site 10-15%: 0.92 % of site 15% or greater: 0.62 % of site g. Are there any unique geologic features on the project site? L1YesW/No If Yes, describe:
h. Surface water features.
i. Does any portion of the project site contain wetlands or other waterbodies (including streams, rivers, WyYesL]No ponds or lakes)?
ii. Do any wetlands or other waterbodies adjoin the project site? WyYesL]No If Yes to either 7 or ii, continue. If No, skip to E.2.1.
iii. Are any of the wetlands or waterbodies within or adjoining the project site regulated by any federal, WyesLINo state or local agency?
iv. For each identified regulated wetland and waterbody on the project site, provide the following information: e Streams: Name 899-10 Classification © ° Lakes or Ponds: Name Classification © = =Wetlands: Name Federal Waters, NYS Wetland, Federal Waters, Fe... Approximate Size 453 acres ° Wetland No. (if regulated by DEC) BRE-14, BRE-11 v. Are any of the above water bodies listed in the most recent compilation of NYS water quality-impaired LlYes WINo waterbodies?
If yes, name of impaired water body/bodies and basis for listing as impaired: i. Is the project site in a designated Floodway? L1YesINo j. Is the project site in the 100-year Floodplain? L1YesWINo k. Is the project site in the 500-year Floodplain? L1YesINo 1. Is the project site located over, or immediately adjoining, a primary, principal or sole source aquifer? L1YesWINo If Yes:
i. Name of aquifer:
m. Identify the predominant wildlife species that occupy or use the project site: eastern chipmunk white-tailed deer nuthatch eastern gray squirrel wood thrush ruffed grouse tufted titmouse racoon other common birds & small mammals.
n. Does the project site contain a designated significant natural community? L1YesWINo If Yes:
i. Describe the habitat/community (composition, function, and basis for designation): ii. Source(s) of description or evaluation:
iii. Extent of community/habitat:
¢ ~=Currently: acres e Following completion of project as proposed: acres ¢ Gain or loss (indicate + or -): acres o. Does project site contain any species of plant or animal that is listed by the federal government or NYS as W] Yes[_]No endangered or threatened, or does it contain any areas identified as habitat for an endangered or threatened species? If Yes:
i. Species and listing (endangered or threatened):
Sedge Wren, Indiana Bat Further consultation with NYNHP is needed due to age of the previous studies. p. Does the project site contain any species of plant or animal that is listed by NYS as rare, or as a species of LTYesl¥JNo special concern?
If Yes:
i. Species and listing: Further consultation with NYNHP is needed due to age of the previous studies. q. Is the project site or adjoining area currently used for hunting, trapping, fishing or shell fishing? L1YesWJNo If yes, give a brief description of how the proposed action may affect that use: E.3. Designated Public Resources On or Near Project Site a. Is the project site, or any portion of it, located in a designated agricultural district certified pursuant to L1YesW|No Agriculture and Markets Law, Article 25-AA, Section 303 and 304?
If Yes, provide county plus district name/number:
b. Are agricultural lands consisting of highly productive soils present? WlYesL_JNo i. If Yes: acreage(s) on project site? Approx. 1/2 of Project site (626 +/-ac) soils are rated as prime farmland or farmland of statewide significance. ii. Source(s) of soil rating(s): USDA Web Soil Survey c. Does the project site contain all or part of, or is it substantially contiguous to, a registered National LlYesWJNo Natural Landmark?
If Yes:
i. Nature of the natural landmark: C1 Biological Community OO Geological Feature ii. Provide brief description of landmark, including values behind designation and approximate size/extent: d. Is the project site located in or does it adjoin a state listed Critical Environmental Area? L1YesW]No If Yes:
i. CEA name:
ii. Basis for designation:
iii. Designating agency and date:
e. Does the project site contain, or is it substantially contiguous to, a building, archaeological site, or district 1 Yesh4 No which is listed on the National or State Register of Historic Places, or that has been determined by the Commissioner of the NYS Office of Parks, Recreation and Historic Preservation to be eligible for listing on the State Register of Historic Places? If Yes:
i. Nature of historic/archaeological resource: [J Archaeological Site DHistoric Building or District ii, Name:
iii. Brief description of attributes on which listing is based:
f. Is the project site, or any portion of it, located in or adjacent to an area designated as sensitive for L1YesMNo archaeological sites on the NY State Historic Preservation Office (SHPO) archaeological site inventory? g. Have additional archaeological or historic site(s) or resources been identified on the project site? DYesiNo If Yes:
i. Describe possible resource(s):
ii. Basis for identification:
h. Is the project site within fives miles of any officially designated and publicly accessible federal, state, or local L1YesNo scenic or aesthetic resource?
If Yes:
i. Identify resource:
ii. Nature of, or basis for, designation (e.g., established highway overlook, state or local park, state historic trail or scenic byway, ete.):
iii. Distance between project and resource: miles.
i. Is the project site located within a designated river corridor under the Wild, Scenic and Recreational Rivers LD Yesk4No Program 6 NYCRR 666?
If Yes:
i. Identify the name of the river and its designation:
ii. Is the activity consistent with development restrictions contained in 6NYCRR Part 666? D1Yes[JNo F. Additional Information Attach any additional information which may be needed to clarify your project. If you have identified any adverse impacts which could be associated with your proposal, please describe those impacts plus any measures which you propose to avoid or minimize them.
G. Verification I certify that the information provided is true to the best of my knowledge.
Applicant/Sponsor Name 6 q On Date | xfto wet +—_+ Signature Drp Ae Title CROW DN2eerR PRINT FORM Page 13 of 13
SEQRA EAF Part 1.B - Government Approvals, Funding, Sponsorship Below is a list of agencies and permits/approvals that are or may be required for the future development of White Pine Commerce Park.
e Onondaga County Department of Transportation (OCDOT) - highway improvement, resignaling, right-of-way work permit, curb cuts e¢ Onondaga County Department of Health (OCDOH) - sewer design approval e¢ Onondaga County Department of Water Environment Protection (OCDWEP) - sewer infrastructure e Onondaga County Metropolitan Water Board- water supply approval e¢ Onondaga County Industrial Development Agency — eminent domain e Syracuse Metropolitan Transportation Council (SMTC) - traffic review e New York State Department of Transportation (NYSDOT) - highway improvement, resignaling e New York State Department of Environmental Conservation (NYSDEC)- stormwater, SPDES, SPDES General Permit, air, freshwater wetland, endangered species, 401 water quality certification e New York State Office of Parks, Recreation and Historic Preservation (NYS OPRHP) — historical/archaeological resource review e United States Army Corps of Engineers (USACE) - wetland permit, Nationwide permit e United States Fish and Wildlife Service (USFWS) - endangered species e¢ Town of Clay Town Board — zone change e Town of Clay — subdivision, site plan e¢ Town of Clay Zoning Board of Appeals- zoning variance, special permit e Town of Clay Planning Department- Building permit, inspection and certificate of occupancy, SWPPP approval, MS4 approval e Syracuse Onondaga County Planning Agency —- GML 239-m review