  1. MICRON NEW YORK SEMICONDUCTOR
  2. MANUFACTURING FACILITY PLANNING
  3. BOARD PRESENTATION
  4. OCTOBER 08, 2025
  5. TABLE OF CONTENTS
  6. PROJECT SITE LOCATION
  7. MICRON NEW YORK SEMICONDUCTOR MANUFACTURING SITE - CLAY, NEW YORK
  8. ROADSIDE VIEW RENDERINGS
  9. KEY PLAN WITH VIEW
  10. EXTERIOR POINT OF VIEW
  11. SOUTH APPROACH TO CUB BUILDING AND CONNECTING TRESTLES
  12. SMS YARD, FAB, CUB, AND WWT BUILDINGS FROM NORTHEAST END OF CAMP US
  13. HIGH QUALITY EXTERIOR
  14. VIZUALIZATIONS
  15. VIEW FROM WEST APPROACH TO PROBE AND ADMIN BUILDING
  16. PROJECT SITE EXTERIOR
  17. KEY PLAN WITH SITE
  18. SITE PHASING AND SCOPE OF
  19. LANDSCAPING APPROACH
  20. 1 - MAIN ENTRANCE
  21. MAIN ENTRANCE DESIGN CRITERIA
  22. 2 - SECONDARY ENTRANCE
  23. SECONDARY ENTRANCE DESIGN CRITERIA
  24. FRONT YARD PLANTING DESIGN CRITERIA
  25. PARKING LOT DESIGN CRITERIA
  26. PLANTING DETAILS
  27. PLANTING SCHEDULE
  28. EXAMPLE OF PROJECT PLANTING SCHEDULE
  29. MICRON SEMICONDUCTOR
  30. MANUFACTURING PROCESS
  31. MICRON SEMICONDUCTOR MANUFACTURING PROCESS
  32. SITE PLAN APPLICATION
  33. SITE PLAN APPLICATION CHECKLIST
  34. EXTERIOR BUILDING
  35. SCHEDULE OF BUILDINGS
  36. BUILDING NAME NUMBER OF TOTAL BUILDING
  37. STORIES AREA (SF)
  38. FAB 3 3,924,283
  39. CUB 2 795,734
  40. HPM 2 217,657
  41. WWT 3 719,311
  42. PROBE 4 669,917
  43. ADMIN 4 417,000
  44. PRIMARY ROOF. OVERALL DIMENSIONS ARE TAKEN FROM THE WIDEST POINT OF THE
  45. CAMPUS BUILDING
  46. MATERIALS PALETTE
  47. EXTERIOR ENCLOSURE SYSTEMS SUMMARY
  48. MAJOR EXTERIOR SYSTEMS
  49. METAL PANEL RAINSCREEN
  50. STOREFRONT GLAZING
  51. CURTAIN WALL
  52. INSULATED PRECAST CONCRETE
  53. METAL PANEL SCREENING
  54. METAL SCREENING AT PARKING GARAGE
  55. INSULATED METAL PANEL
  56. TYPICAL DETAIL
  57. UNITIZED AND STOREFRONT CURTAIN WALL - FOH
  58. PERFORATED METAL PANEL SCREEN ASSEMBLY - FOH
  59. ELEVATION WALL SECTION
  60. ILLUSTRATIVE ELEVATION
  61. METAL PANEL RAINSCREEN- FOH
  62. ILLUSTRATIVE ELEVATIONS
  63. SUPPORTING SITE PLANNING
  64. DUMPSTER LOCATIONS
  65. FIRE RESPONSE
  66. SITE LIGHTING
  67. SITE LIGHTING FIXTURES AND HEIGHTS
  68. STAGING/PARKING
  69. BULK GAS YARD
  70. LAYDOWN/STAGING
  71. RESTROOMS SITE DUMPSTERS
  72. SUBCONTRACTOR
  73. TRADE PARKING LEGEND
  74. TRADE PARKING
  75. MEETING AREAS
  76. TRAINING AREA
  77. SIGNAGE TYPES
  78. PROPOSED VARIANCES
  79. LOADING DOCK SUMMARY
  80. PARKING SUMMARY
  81. REQUEST NO.3
  82. PROPERTY ZONING SETBACK
  83. BACKFLOW PREVENTION BUILDING
  84. PRIMARY AND ACCESSORY STRUCTURES
  85. PERMITTING DRAWING LIST

MICRON NEW YORK SEMICONDUCTOR

MANUFACTURING FACILITY PLANNING

BOARD PRESENTATION

OCTOBER 08, 2025

1

TABLE OF CONTENTS

• Owner Introductions • Project Site Location • Roadside View Renderings • Exterior Point of View Renderings • High Quality Exterior Visualizations • Project Site Exterior Renderings • Site Phasing and Scope of Work Plans • Landscaping Approach • Making Memory Chips- Semiconductor Manufacturing Process Video • Site Plan Application Checklist • Appendix • Exterior Building Elevations • Campus Building Materials Palette • Supporting Site Planning Diagrams • Proposed Variances • Permitting Drawing List Project Yankee Planning Board Presentation - October 08, 2025 2 Micron New York Project Introduction Katie Birchenough 3 Founded on Headquartered in ~ 52,000 October 5, 1978 Boise, Idaho, USA team members worldwide China Xi’an Assembly/test

DRAM

Japan Hiroshima Fab

DRAM

United States Taiwan Boise, ID Manassas, VA Taichung Clay, NY Mexico Taoyuan DRAM, NAND and NOR Fab and assembly/test DRAM * Guadalajara India Singapore *Gujarat Singapore Fab and assembly/test Malaysia NAND Muar Manufacturing sites Penang R&D integrated with MFG Assembly/test DRAM, NAND and NOR * Coming soon 4 The CHIPS Act Reshoring Semiconductor Manufacturing • The CHIPS Act prioritizes leading edge technology, including Dynamic Random-Access Memory (DRAM), often used in computer coding.

• The US currently produces only 1% of global DRAM all of which is produced by Micron.

• In contrast, South Korea has a 44% global market share in memory.

• Micron's US-based investments will increase US DRAM production by 12 % over the next two decades.

• Micron has received CHIPS funding and is therefore deemed a critical project for economic and national security in the US.

• Micron must meet certain construction and operation milestones to receive the CHIPS funding.

5 Micron’s Site Selection of Clay, NY • Minimum of 1,000 acres of contiguous land and shaped to accommodate the required layout.

• Relatively flat topography and geotechnical makeup required to support Fab buildings.

Micron New York • Zoned or able to be zoned for industrial use.

• Within 20 miles of a highway and other transportation avenues for people and materials.

• Adequate natural gas and electricity supply including high reliability and carbon-free electricity.

• Adequate water supply and access to wastewater treatment.

• Availability of a specialized workforce.

6 Status of Environmental Review and Permitting • Micron's project is currently undergoing a joint federal and state environmental review.

• Micron and the lead agencies (CPO and OCIDA) are working to finalize the EIS.

• Once the EIS is finalized and OCIDA has issued its Findings and Determination (CPO has issued its Record of Decision), Micron will need to receive permits and approvals necessary to begin tree clearing:

o NYS Wetland Permit (DEC) o NYS Incidental Take Permit (DEC) o Clean Water Act 401 Certification (DEC) o MS4/ SWPPP (Town of Clay/ DEC) o Federal Incidental Take Statement (USFWS) o Federal Wetland Permit (USACE) o Site Plan Approval, Zoning Variances 7 Construction Planning Jeffrey Maidment 8 Site Master Plan 9 10 Site Master Plan – Phase 1 Town of Cicero Town of Clay Rail Spur NYS Route 31 11 12 13 Micron Fab Construction Video in Idaho Memory made in America: Micron’s Idaho fab takes shape | Micron Technology 14

PROJECT SITE LOCATION

15

MICRON NEW YORK SEMICONDUCTOR MANUFACTURING SITE - CLAY, NEW YORK

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 16

ROADSIDE VIEW RENDERINGS

17

KEY PLAN WITH VIEW

LOCATION

Viewpoint of campus shows new landscaping with 15-year projected growth. Image represents full site build out of all phases. Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 18

KEY PLAN WITH VIEW

LOCATION

Viewpoint of campus shows new landscaping with 15-year projected growth. Image represents full site build out of all phases. Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 19

KEY PLAN WITH VIEW

LOCATION

Viewpoint of campus shows new landscaping with 15-year projected growth. Image represents full site build out of all phases. Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 20

KEY PLAN WITH VIEW

LOCATION

Viewpoint of campus shows new landscaping with 15-year projected growth. Image represents full site build out of all phases. Fence line shown in foreground with WWT and CUB building beyond. Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 21

KEY PLAN WITH VIEW

LOCATION

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 22

EXTERIOR POINT OF VIEW

RENDERINGS

23 SOUTH FAÇADE OF PROBE AND ADMIN BUILDINGS

KEY PLAN WITH VIEW

LOCATION

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 24

SOUTH APPROACH TO CUB BUILDING AND CONNECTING TRESTLES

KEY PLAN WITH VIEW

LOCATION

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 25

SMS YARD, FAB, CUB, AND WWT BUILDINGS FROM NORTHEAST END OF CAMP US

KEY PLAN WITH VIEW

LOCATION

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 26

HIGH QUALITY EXTERIOR

VIZUALIZATIONS

27

KEY PLAN WITH VIEW

LOCATION

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 28

KEY PLAN WITH VIEW

LOCATION

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 29

VIEW FROM WEST APPROACH TO PROBE AND ADMIN BUILDING

KEY PLAN WITH VIEW

LOCATION

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 30

KEY PLAN WITH VIEW

LOCATION

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 31

PROJECT SITE EXTERIOR

RENDERINGS

32

KEY PLAN WITH SITE

SECTORS

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 33

KEY PLAN WITH VIEW

LOCATION

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 34

KEY PLAN WITH VIEW

LOCATION

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 35

KEY PLAN WITH VIEW

LOCATION

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 36

SITE PHASING AND SCOPE OF

WORK

37

LEGEND

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 38 CAMPUS – ALL PHASES

PHASE 1

LEGEND

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 39 CAMPUS – PHASE 1

PHASE 1

LEGEND

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 40

LANDSCAPING APPROACH

• OVERALL LANDSCAPING APPROACH • 1 – MAIN ENTRANCE • 2 – SECONDARY ENTRANCE • 3 – FRONT YARD • 4 – PARKING LOT • 5 – ADMIN BUILDING DROP-OFF AND ENTRY PLAZA • PLANTING DETAILS • PLANTING SCHEDULE 41

LANDSCAPING APPROACH

Note: Plan renderings, details and plant schedules are for conceptual representation and site plan approval only. Final landscape architecture design and details will be provided with engineering permit drawings and issued for construction plans, in accordance with Town of Clay, Town of Cicero, Onondaga County and State of New York.

LEGEND

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 42

1 - MAIN ENTRANCE

MAIN ENTRANCE DESIGN CRITERIA

• Entry design will incorporate a large concrete retaining wall on left side of main entrance to make a statement. The wall will be nestled into grade/berms. This will echo the walls at the drop-off.

• A cohesive signage strategy based on Micron’s signage standards will be seamlessly incorporated into the landscape design.

• Micron light bars (L2) will be installed on the backside of each wall. The “M” landmark will be installed in the middle of the entry median, and the monument logo identity (S2) will be in the open lawn to the right of the entrance. • Provide a sequential arrival experience with native plantings that open to views of the FOH buildings, and clear sight lines for vehicles. • Native grasses and perennial focused landscapes will dominate edges with a manicured lawn in the foreground. • Bioswales/dry swales will be located along the entry drive to act as snow collection and stormwater collection areas. The edges will be planted with pollinator plants. • Incorporate multi-model entrance with mixed-use trail (walkers, bikers). Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 43

2 - SECONDARY ENTRANCE

SECONDARY ENTRANCE DESIGN CRITERIA

• Secondary entry will be a scaled down version of main entry.

Landscape will have identical approach with the exception of no hardscape. A cohesive signage strategy based on Micron’s signage standards will be seamlessly incorporated into the landscape design. • Micron light bars (L2) will be installed on the backside of each wall. The “M” landmark will be installed in the middle of the entry median, and the monument logo identity (S2) will be in the open lawn to the right of the entrance. • Provide a sequential arrival experience with native plantings that open to views of the FOH buildings, and clear sight lines for vehicles. • Bioswales/dry swales will be located along the entry drive to act as snow collection and stormwater collection areas. The edges will be planted with pollinator plants. Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 44 3 – FRONT YARD

FRONT YARD PLANTING DESIGN CRITERIA

• Conserve existing trees where feasible. • Provide native plantings consistent to local recommendations and availability. • Consider conserving existing landscapes and providing enhancements such as revegetation or reforestation. • Select species for wet/dry site tolerance, salt tolerance, etc., drought tolerance. • Screen and beautify views from the Admin building. Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 45 4 – PARKING LOT

PARKING LOT DESIGN CRITERIA

• Provide (1) native tree planting and (3) native shrub plantings per 10 parking spaces. • Integrate E.V. charging stations into landscape. • Seasonal snow storage is accommodated within native planting beds. • Screen and beautify views from the Admin building. Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 46 5 – ADMIN BUILDING DROP-OFF AND ENTRY PLAZA Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 47

PLANTING DETAILS

Note: Plan renderings, details and plant schedules are for conceptual representation and site plan approval only. Final landscape architecture design and details will be provided with engineering permit drawings and issued for construction plans, in accordance with Town of Clay, Town of Cicero, Onondaga County and State of New York. Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 48

PLANTING SCHEDULE

EXAMPLE OF PROJECT PLANTING SCHEDULE

• Project planting schedule includes the following areas: • Stormwater Management Area • Dense Screening • Floodplain Forest • Bioretention • Front Perimeter Landscape • Young Forest and Shrublands Transition • Project planting schedule includes the following seed mixes: • Wet Meadow • Emergent Wetland • Floodplain Forest • Upland • Young, Shrublands Old Field • Full planting schedule has been submitted with the Site Plan Application. See sheet PMT_B00_L0_0205. Note: Plan renderings, details and plant schedules are for conceptual representation and site plan approval only. Final landscape architecture design and details will be provided with engineering permit drawings and issued for construction plans, in accordance with Town of Clay, Town of Cicero, Onondaga County and State of New York. Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 49

MICRON SEMICONDUCTOR

MANUFACTURING PROCESS

VIDEO

50

MICRON SEMICONDUCTOR MANUFACTURING PROCESS

Making Memory Chips - Semiconductor Manufacturing Process Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 51

SITE PLAN APPLICATION

CHECKLIST

52

SITE PLAN APPLICATION CHECKLIST

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 53

APPENDIX

• EXTERIOR BUILDING ELEVATIONS • CAMPUS BUILDING MATERIAL PALETTE • SUPPORTING SITE PLANNING DIAGRAMS • PROPOSED VARIANCES • PERMITTING DRAWING LIST 54

EXTERIOR BUILDING

ELEVATIONS

• OVERALL BUILDING DIMENSIONS

AND HEIGHTS

• ADMIN • PROBE • FAB • CUB • HPM • WWT 55

SCHEDULE OF BUILDINGS

BUILDING NAME NUMBER OF TOTAL BUILDING

STORIES AREA (SF)

FAB 3 3,924,283

CUB 2 795,734

HPM 2 217,657

WWT 3 719,311

PROBE 4 669,917

ADMIN 4 417,000

NOTE: BUILDING HEIGHTS ARE MEASURED FROM GRADE TO THE LEVEL OF THE HIGHEST

PRIMARY ROOF. OVERALL DIMENSIONS ARE TAKEN FROM THE WIDEST POINT OF THE

BUILDING.

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 56 ADMIN BUILDING – NORTH AND SOUTH ELEVATIONS

KEY PLAN

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 57 ADMIN BUILDING – EAST AND WEST ELEVATIONS

KEY PLAN

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 58 PROBE BUILDING – NORTH AND SOUTH ELEVATIONS

KEY PLAN

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 59 PROBE BUILDING – EAST AND WEST ELEVATIONS, GARAGE LINK ELEVATION

KEY PLAN

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 60 FAB BUILDING – EAST ELEVATIONS

MOD 1

KEY PLAN

MOD 2

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 61 FAB BUILDING – WEST ELEVATIONS

MOD 1

KEY PLAN

MOD 2

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 62 FAB BUILDING – NORTH AND SOUTH ELEVATIONS

MOD 1

KEY PLAN

MOD 2

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 63 CUB BUILDING – EAST AND WEST ELEVATIONS – MOD 1

KEY PLAN

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 64 CUB BUILDING – NORTH AND SOUTH ELEVATIONS – MOD 1

KEY PLAN

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 65 CUB BUILDING – NORTH, EAST, AND WEST ELEVATIONS – MOD 2

KEY PLAN

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 66 HPM BUILDING – EAST AND WEST ELEVATIONS

KEY PLAN

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 67 HPM BUILDING – NORTH AND SOUTH ELEVATIONS

KEY PLAN

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 68 WWT BUILDING – NORTH AND SOUTH ELEVATIONS

KEY PLAN

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 69 WWT BUILDING – EAST AND WEST ELEVATIONS

KEY PLAN

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 70

CAMPUS BUILDING

MATERIALS PALETTE

71

EXTERIOR ENCLOSURE SYSTEMS SUMMARY

METAL PANEL CURTAIN WALL INSULATED PRECAST IMP (Insulated Metal Panel) RAINSCREEN SYSTEM (Unitized & Storefront) CONCRETE • Adequate for the northern • High-performing for the • High-performing for the • High durability NY climate northern NY climate northern NY climate • Off-site fabrication and • Metal-clad insulation with • Pre-fabricated backup wall • Aluminum framing system reduces on-site construction factory applied coating and with metal panel outer layer with insulated glazing or time integral joints with factory applied coating metal panel infill • Field-applied coating on the • A variety of grades, profiles, • Large-scale prefabrication • Highest level of finish precast surface to reduce and coatings are available reduces waste and on-site • Durable and requires little to staining construction time • Durable and requires little to no maintenance • Heavy weight – not no maintenance • Durable and requires little to recommended for upper no maintenance levels Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 72

MAJOR EXTERIOR SYSTEMS

METAL PANEL RAINSCREEN

STOREFRONT GLAZING

CURTAIN WALL

INSULATED PRECAST CONCRETE

METAL PANEL SCREENING

METAL SCREENING AT PARKING GARAGE

INSULATED METAL PANEL

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 73

OVERVIEW

• Insulated Metal Panel systems consist of interlocking panels of metal clad rigid insulation fastened to a backup structure.

• The panel joints are performance tested and can rely on factory or field installed seals. Insulation values vary with panel thickness.

• Panels come in a variety of profiles and finishes.

• Backup assembly flexibility.

TYPICAL DETAIL

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 74

UNITIZED AND STOREFRONT CURTAIN WALL - FOH

ILLUSTRATIVE ELEVATIONS ELEVATION WALL SECTION Unitized Curtain Wall Storefront Curtain Wall Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 75

PERFORATED METAL PANEL SCREEN ASSEMBLY - FOH

ELEVATION WALL SECTION

ILLUSTRATIVE ELEVATION

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 76

METAL PANEL RAINSCREEN- FOH

ELEVATION WALL SECTION

ILLUSTRATIVE ELEVATIONS

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 77

TYPICAL DETAIL

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 78

SUPPORTING SITE PLANNING

DIAGRAMS

• STORM DRAINAGE – EDINGER WETLANDS • STORM DRAINAGE – COWARDIN WETLANDS • UTILITY CORRIDORS • CIRCULATION • DUMPSTERS • FIRE RESPONSE • WATER MANAGEMENT • LIGHTING • CONSTRUCTION LOGISTICS • SITE AND EXTERIOR SIGNAGE 79 STORM DRAINAGE – EDINGER WETLANDS

LEGEND

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 80 STORM DRAINAGE – COWARDIN WETLANDS

LEGEND

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 81

LEGEND

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 82

LEGEND

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 83

DUMPSTER LOCATIONS

Roadside range of view from LEGEND Secondary Entrance Roadside range of view from Primary Entrance Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 84

FIRE RESPONSE

LEGEND

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 85

LEGEND

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 86

SITE LIGHTING

SITE LIGHTING FIXTURES AND HEIGHTS

LEGEND

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 87

STAGING/PARKING

BATCHPLANT

BATCHPLANT

BULK GAS YARD

LAYDOWN/STAGING

BATCHPLANT

AGGREGATE

BATCHPLANT

STORAGE

RESTROOMS SITE DUMPSTERS

LAYDOWN

SUBCONTRACTOR

TRAILERS

TRADE PARKING LEGEND

LUNCH AREA/

RESTROOMS

TRADE PARKING

MEETING AREAS

OFFICES AND

CHEMS

ORIENTATION

MICRON SITE

COMPLEX/

OFFICE

TRAINING AREA

FRONT OF

HOUSE TRADE

PARKING

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 88

LEGEND

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 89

SIGNAGE TYPES

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 90

PROPOSED VARIANCES

• REQUIRED LOADING DOCKS • PARKING • FENCING HEIGHT • SITE SETBACK • PRIMARY AND SECONDAY STRUCTURES 91 VARIANCE- REQUIRED LOADING DOCKS (ZBA CASE #1988)

LOADING DOCK SUMMARY

LEGEND

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 92 VARIANCE- PARKING (ZBA CASE #1988)

PARKING SUMMARY

LEGEND

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 93 VARIANCE- FENCING HEIGHT (ZBA CASE #1988) TOWN OF CLAY ZONING CODE § 230-17(D)(5) EXCERPT FROM ZONING BOARD OF APPEALS NARRATIVE - SECTION II-C,

REQUEST NO.3

The proposed fence design is a 7’ tall chain link perimeter fence, with 18” of barbed wire on top. The total fence height is 8.5’.

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 94 VARIANCE- SITE SETBACK (ZBA CASE #1988)

PROPERTY ZONING SETBACK

LINE

NATURAL GAS

METERING

STATION

LEGEND

200’ FRONT YARD SETBACK

BACKFLOW PREVENTION BUILDING

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 95 VARIANCE- PRIMARY AND SECONDARY STRUCTURES (ZBA CASE #1988) Accessory Structure: A structure or mechanical equipment or decorative device attached or detached from the principal structure.

PRIMARY AND ACCESSORY STRUCTURES

LEGEND

Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 96

PERMITTING DRAWING LIST

97

PERMITTING DRAWING LIST

• Full size Project Permitting Drawings are on file with the Town of Clay, New York.

• Issued for Permit – August 28th, 2025 Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 98

Same source Micron Project Schedule 09-09-2025 · 2025-09-09