clayny.news

AI for transparency
Clay, New York · Friday, November 6, 2026· Nov 6, 2026
Public Records › OCIDA › Meeting

May 2018 – Rescheduled — 5.21.18-OCIDA-Regular-Meeting-Agenda.pdf

Catalog date 2024-05-06 · PDF · 265 words · catalog collection 2026-08-07 Official copy↗ Archived PDF Plain text Mentions

Text index: 2 passages across 1 pages with extracted text; 2 passages have semantic vectors. Pages with any indexed text may still contain unextracted scanned content. Complete page coverage has not been verified.

No recorded acquisition check; current official availability unknown. Recorded acquisition check: not recorded. This is not a live source availability check.

Document type unverified. Event date unknown. Issue date unknown. Catalog date: 2024-05-06.
Background page processing · status is stale

0 jobs match the current original: 0 queued, processing or awaiting import; 0 awaiting page review; 0 held; 0 with machine text indexed. Machine recognition can contain errors. Indexed text and complete page extraction are different states.

Status received: 2026-11-06T07:36:14.215909+00:00. Producer observation: 2026-11-06T07:35:19.765553+00:00. These are processing observations, not document issue dates.

Search index status: success. Last checked: 2026-11-06T07:35:05.928051+00:00. Last successful check: 2026-11-06T07:35:19.762315+00:00.

Typeset from the PDF of the official document — extraction method is not certified for this historical record; headings, motions and recorded votes are detected automatically, so spacing may differ from the original. The official copy governs.

ONONDAGA COUNTY INDUSTRIAL DEVELOPMENT AGENCY

333 WEST WASHINGTON STREET, SUITE 130, SYRACUSE, NY 13202

PHONE: 315.435.3770  FAX: 315.435.3669  SYRACUSECENTRAL.COM Meeting Agenda May 21, 2018 8:00 AM Call to Order the Regular Meeting of the Agency A. Approval of Minutes – April 10, 2018 B. Treasurer’s Report C. Payment of Bills D. Conflict of Interest Disclosure Action Items

1. Tessy Plastics (3101-16-01J)

Tessy Plastics is constructing a 246,000 square foot manufacturing facility at its existing assembly and warehouse operation in the Town of Van Buren.

Agency Action Requested:

a. A Resolution of the Board to approve a 6 month extension to complete the initial project Representative: Joseph Ranalli, Tessy Plastics

2. COR Inner Harbor Development (3101-15-14A)

The Project consists of the development of the Inner Harbor Parcels A1, A2, A3, A4, B and C through a series of sub-projects, with a diversity of uses and users, in order to create a unique urban, mixed-use neighborhood in the area of the Inner Harbor in the City of Syracuse. The Project will capitalize on the Onondaga Lake waterfront as a geographic asset and proximity to existing regional transportation infrastructure. The Project will link together the City of Syracuse, Franklin Square, Destiny USA and Onondaga Lake, and it is strategically located to promote future additional development.

Agency Action Requested:

a. A Resolution of the Board granting an extension of the Agent Agreement for an additional 5 yrs. Representative: Tony Rivizzigno, OCIDA Counsel 3. 800 Hiawatha Blvd-Roth Steel Update on progress and grants awarded Representative: Isabelle Harris, Secretary, Travis Glazier & Holly Granat, Office of the Environment Adjourn

Same source May 2018 – Rescheduled · 2024-05-06