  1. ONONDAGA COUNTY INDUSTRIAL DEVELOPMENT AGENCY
  2. 335 MONTGOMERY STREET FLOOR 2M, SYRACUSE, NY 13202
  3. PAYMENT OF BILLS
  4. CONFLICT OF INTEREST DISCLOSURE
  5. QP2 PROPERTIES, LLC (3101-23-03A) SECOND MEETING
  6. TRACEY ROAD EQUIPMMENT, INC. / GERALD W. TRACEY PROJECT. (3101-20-03B)
  7. COR INNER HABOR COMPANY, LLC ET AL (3101-20-03B)
  8. 335 MONTGOMERY STREET, 2ND FLOOR, SYRACUSE, NY 13202
  9. 101.1 WPCP GEIS
  10. LIABILITIES AND EQUITY
  11. GENERAL EXPENSES
  12. PROFESSIONAL SERVICES
  13. DEVELOPMENT AGENCY
  14. 401 WQC, SPDES; NYSDOT: HWP

ONONDAGA COUNTY INDUSTRIAL DEVELOPMENT AGENCY

335 MONTGOMERY STREET FLOOR 2M, SYRACUSE, NY 13202

1- PHONE: 315.435.3770 • FAX: 315.435.3669 • ONGOVED.COM Regular Meeting Agenda September 14, 2023 8:30 AM Call to Order the Regular Meeting of the Agency A. Approval of Minutes: August 10, 2023 B. Treasurer’s Report C. Payment of Bills D. Conflict of Interest Action Items 1. Camillus Mills Redevelopment Company, Inc. / Camillus Mills Phase II, LLC (3101- 21-08A) Modification Meeting Camillus Mills Redevelopment Company, Inc./ Camillus Mills Phase II, LLC is requesting an extension of the end date of their sales and use tax exemption and their Project completion date.

Agency Action Requested:

a. A resolution of the Board authorizing an extension of Sales and Use Tax Exemption and Project completion date for Camillus Mills Redevelopment Company, Inc./ Camillus Mills Phase II, LLC.

Representative: Amanda Fitzgerald, OCIDA Legal Counsel, Barclay Damon LLP 2. Syracuse Habitat for Humanity Property Disposition.

Agency Action Requested:

a. A resolution of the Board authorizing disposition of property Representative: Sarah Bruce, Executive Director, Syracuse Habitat for Humanity.

ONONDAGA COUNTY INDUSTRIAL DEVELOPMENT AGENCY

335 MONTGOMERY STREET FLOOR 2M, SYRACUSE, NY 13202

1- PHONE: 315.435.3770 • FAX: 315.435.3669 • ONGOVED.COM Regular Meeting Agenda September 14, 2023 8:30 AM Call to Order the Regular Meeting of the Agency A. Approval of Minutes: August 10, 2023 B. Treasurer’s Report C. Payment of Bills D. Conflict of Interest Action Items 1. Camillus Mills Redevelopment Company, Inc. / Camillus Mills Phase II, LLC (3101- 21-08A) Modification Meeting Camillus Mills Redevelopment Company, Inc./ Camillus Mills Phase II, LLC is requesting an extension of the end date of their sales and use tax exemption and their Project completion date.

Agency Action Requested:

a. A resolution of the Board authorizing an extension of Sales and Use Tax Exemption and Project completion date for Camillus Mills Redevelopment Company, Inc./ Camillus Mills Phase II, LLC.

Representative: Amanda Fitzgerald, OCIDA Legal Counsel, Barclay Damon LLP 2. Syracuse Habitat for Humanity Property Disposition.

Agency Action Requested:

a. A resolution of the Board authorizing disposition of property Representative: Sarah Bruce, Executive Director, Syracuse Habitat for Humanity.

3. Destiny USA Real Estate, LLC (3101-14-01B)

Destiny USA Real Estate, LLC is requesting OCIDA acknowledge an appropriation of a portion of its Project by the Department of Transportation and execute and deliver an assignment of claim and release in connection therewith.

Agency Action Requested:

a. A resolution of the Board acknowledging an appropriation of a portion of a certain Project on behalf of Destiny USA Real Estate, LLC by the Department of Transportation and authorizing the execution and delivery of an assignment of claim and release in connection therewith.

Representative: Amanda Fitzgerald, OCIDA Legal Counsel, Barclay Damon LLP Page1

4. Engineering Services-Contract Authorization

Agency Action Requested:

a. A resolution of the Board authorizing a contract with Barton and Loguidice in the amount of $ 10,000 for engineering services at Caughdenoy Industrial Business Park.

Representative: Robert Petrovich, Executive Director, OCIDA

5. Micron New York Semiconductor Manufacturing LLC (3101-23-07A)

Agency Action Requested:

a. A resolution of the Board designating OCIDA as lead agency with respect to a coordinated review and determing to issue a Positive Declaration pursuant to the state environmental quality review act.

3. Destiny USA Real Estate, LLC (3101-14-01B)

Destiny USA Real Estate, LLC is requesting OCIDA acknowledge an appropriation of a portion of its Project by the Department of Transportation and execute and deliver an assignment of claim and release in connection therewith.

Agency Action Requested:

a. A resolution of the Board acknowledging an appropriation of a portion of a certain Project on behalf of Destiny USA Real Estate, LLC by the Department of Transportation and authorizing the execution and delivery of an assignment of claim and release in connection therewith.

Representative: Amanda Fitzgerald, OCIDA Legal Counsel, Barclay Damon LLP Page1

4. Engineering Services-Contract Authorization

Agency Action Requested:

a. A resolution of the Board authorizing a contract with Barton and Loguidice in the amount of $ 10,000 for engineering services at Caughdenoy Industrial Business Park.

Representative: Robert Petrovich, Executive Director, OCIDA

5. Micron New York Semiconductor Manufacturing LLC (3101-23-07A)

Agency Action Requested:

a. A resolution of the Board designating OCIDA as lead agency with respect to a coordinated review and determing to issue a Positive Declaration pursuant to the state environmental quality review act.

b. A resolution of the Board finding that the draft Scoping Document is sufficient for public review, opening a thirty-day public comment period during which a public hearing will be held on October 11, 2023.

Representative: Jeff Davis, OCIDA Legal Counsel, Barclay Damon, LLP Adjourn 2 Page2

DRAFT

Onondaga County Industrial Development Agency Regular Meeting Minutes August 10, 2023 A regular meeting of the Onondaga County Industrial Development Agency was held on Thursday, August 10, 2023, 355 Montgomery Street, Floor 2M, Syracuse, New York.

Patrick Hogan called the meeting to order at 8:31 am with the following:

PRESENT:

Patrick Hogan Janice Herzog Susan Stanczyk Kevin Ryan Fanny Villarreal Cydney Johnson

ABSENT:

Elizabeth Dreyfuss

ALSO PRESENT:

Robert M. Petrovich, Executive Director Nancy Lowery, Secretary Nate Stevens, Treasurer Karen Doster, Recording Secretary Alexis Rodriguez, Assistant Treasurer Len Rauch, Economic Development Jeff Davis, Barclay Damon Law Firm Amanda Fitzgerald, Barclay Damon Law Firm Ozzie Crisalli, QP2 Properties, LLC Michael Arcuri, QP2 Properties, LLC Wendy Lougnet, Costello, Cooney & Fearon, PLLC John Law APPROVAL OF REGULAR MEETING MINUTES – JULY 20, 2023 b. A resolution of the Board finding that the draft Scoping Document is sufficient for public review, opening a thirty-day public comment period during which a public hearing will be held on October 11, 2023.

Representative: Jeff Davis, OCIDA Legal Counsel, Barclay Damon, LLP Adjourn 2 Page2

DRAFT

Onondaga County Industrial Development Agency Regular Meeting Minutes August 10, 2023 A regular meeting of the Onondaga County Industrial Development Agency was held on Thursday, August 10, 2023, 355 Montgomery Street, Floor 2M, Syracuse, New York.

Patrick Hogan called the meeting to order at 8:31 am with the following:

PRESENT:

Patrick Hogan Janice Herzog Susan Stanczyk Kevin Ryan Fanny Villarreal Cydney Johnson

ABSENT:

Elizabeth Dreyfuss

ALSO PRESENT:

Robert M. Petrovich, Executive Director Nancy Lowery, Secretary Nate Stevens, Treasurer Karen Doster, Recording Secretary Alexis Rodriguez, Assistant Treasurer Len Rauch, Economic Development Jeff Davis, Barclay Damon Law Firm Amanda Fitzgerald, Barclay Damon Law Firm Ozzie Crisalli, QP2 Properties, LLC Michael Arcuri, QP2 Properties, LLC Wendy Lougnet, Costello, Cooney & Fearon, PLLC John Law APPROVAL OF REGULAR MEETING MINUTES – JULY 20, 2023 Upon a motion by Janice Herzog, seconded by Kevin Ryan, the OCIDA Board approved the regular meeting minutes of July 20, 2023. Fanny Villarreal abstained. Motion was carried.

TREASURER’S REPORT Alexis Rodriguez gave a brief review of the Treasurer’s Report for the month of July 2023.

Upon a motion by Susan Stanczyk, seconded by Janice Herzog, the OCIDA Board approved the Treasurer’s Report for the month of July 2023. Motion was carried.

Page3 Upon a motion by Janice Herzog, seconded by Kevin Ryan, the OCIDA Board approved the regular meeting minutes of July 20, 2023. Fanny Villarreal abstained. Motion was carried.

TREASURER’S REPORT Alexis Rodriguez gave a brief review of the Treasurer’s Report for the month of July 2023.

Upon a motion by Susan Stanczyk, seconded by Janice Herzog, the OCIDA Board approved the Treasurer’s Report for the month of July 2023. Motion was carried.

Page3

PAYMENT OF BILLS

Alexis Rodriguez gave a brief review of the Payment of Bills Schedule #484.

Upon a motion by Susan Stanczyk, seconded by Fanny Villarreal, the OCIDA Board approved the Payment of Bills Schedule #484 for $335,136.64. Motion was carried.

PAYMENT OF BILLS

Alexis Rodriguez gave a brief review of the Payment of Bills Schedule #484.

Upon a motion by Susan Stanczyk, seconded by Fanny Villarreal, the OCIDA Board approved the Payment of Bills Schedule #484 for $335,136.64. Motion was carried.

CONFLICT OF INTEREST DISCLOSURE

The Conflict of Interest was circulated and there were no conflicts.

CONFLICT OF INTEREST DISCLOSURE

The Conflict of Interest was circulated and there were no conflicts.

QP2 PROPERTIES, LLC (3101-23-03A) SECOND MEETING

Ozzie Crisalli stated the project is 96 market rate apartments on a 15 acre parcel. He stated they will have 3 outparcel buildings totaling 33,200 square feet. He stated that space will be rented to food service tenants, personal service tenants and financial. He stated it is a combination of medical, office and restaurant space.

Patrick Hogan asked if the rents are going to be $1,400. Michael Arcuri stated yes.

Patrick Hogan stated under “other” there is $1,262,000 and asked what that is. Ozzie Crisalli stated it is the construction contingency.

Robert Petrovich stated an affirmation from the applicant should be on record stating whether or not the project can proceed without the benefits being requested. Ozzie Crisalli stated the project will not proceed without the benefits because of the road work that they need to do. He stated their approval was contingent on doing a scope of work at the intersection to mitigate existing traffic problems. He stated the cost of that work is about $980,000. He stated adding that cost to the project puts all financial benchmarks that developers, lenders and investors look at into a range that becomes questionable.

2 Page4 Patrick Hogan stated he has talked to a lot of developers and to borrow money is tough today. Ozzie Crisalli stated and that is not even speaking to the interest rates.

QP2 PROPERTIES, LLC (3101-23-03A) SECOND MEETING

Ozzie Crisalli stated the project is 96 market rate apartments on a 15 acre parcel. He stated they will have 3 outparcel buildings totaling 33,200 square feet. He stated that space will be rented to food service tenants, personal service tenants and financial. He stated it is a combination of medical, office and restaurant space.

Patrick Hogan asked if the rents are going to be $1,400. Michael Arcuri stated yes.

Patrick Hogan stated under “other” there is $1,262,000 and asked what that is. Ozzie Crisalli stated it is the construction contingency.

Robert Petrovich stated an affirmation from the applicant should be on record stating whether or not the project can proceed without the benefits being requested. Ozzie Crisalli stated the project will not proceed without the benefits because of the road work that they need to do. He stated their approval was contingent on doing a scope of work at the intersection to mitigate existing traffic problems. He stated the cost of that work is about $980,000. He stated adding that cost to the project puts all financial benchmarks that developers, lenders and investors look at into a range that becomes questionable.

2 Page4 Patrick Hogan stated he has talked to a lot of developers and to borrow money is tough today. Ozzie Crisalli stated and that is not even speaking to the interest rates.

Robert Petrovich asked if the project would not advance but for these benefits. Ozzie Crisalli stated that is correct.

Patrick Hogan stated the rents are market rate and there is a big gap as far as affordable housing in this area and in the whole Central New York area.

Susan Stanczyk asked where the actual location is and is it currently vacant land. Ozzie Crisalli stated it is on the northeast corner of Henry Clay Boulevard and Route 31 and it is vacant land. Fanny Villarreal asked why there will only be 3 jobs created. Ozzie Crisalli stated the 3 jobs are permanent jobs that his company will employ to work and run the property. He stated there will be well over 200 construction jobs. He stated that does not speak to the number of jobs that are going to be created by the businesses that occupy that 33,000 square feet of commercial space. Fanny Villarreal asked how many businesses they expect. Ozzie Crisalli stated in excess of 15 businesses.

Nancy Lowery stated a public hearing was held and there were 3 people in attendance, Kevin Meaker from Clay Town Board, Russ Mitchell from Clay Town Planning Board and Mark Teritto who is Commissioner of Town Planning. She stated Mr. Meaker and Mr. Mitchell both supported the project and the benefits being requested.

Upon a motion by Janice Herzog, seconded by Susan Stanczyk, the OCIDA Board approved a resolution authorizing the adoption of SEQRA determination for the QP2 Properties, LLC project. Kevin Ryan abstained. Motion was carried.

Robert Petrovich asked if the project would not advance but for these benefits. Ozzie Crisalli stated that is correct.

Patrick Hogan stated the rents are market rate and there is a big gap as far as affordable housing in this area and in the whole Central New York area.

Susan Stanczyk asked where the actual location is and is it currently vacant land. Ozzie Crisalli stated it is on the northeast corner of Henry Clay Boulevard and Route 31 and it is vacant land. Fanny Villarreal asked why there will only be 3 jobs created. Ozzie Crisalli stated the 3 jobs are permanent jobs that his company will employ to work and run the property. He stated there will be well over 200 construction jobs. He stated that does not speak to the number of jobs that are going to be created by the businesses that occupy that 33,000 square feet of commercial space. Fanny Villarreal asked how many businesses they expect. Ozzie Crisalli stated in excess of 15 businesses.

Nancy Lowery stated a public hearing was held and there were 3 people in attendance, Kevin Meaker from Clay Town Board, Russ Mitchell from Clay Town Planning Board and Mark Teritto who is Commissioner of Town Planning. She stated Mr. Meaker and Mr. Mitchell both supported the project and the benefits being requested.

Upon a motion by Janice Herzog, seconded by Susan Stanczyk, the OCIDA Board approved a resolution authorizing the adoption of SEQRA determination for the QP2 Properties, LLC project. Kevin Ryan abstained. Motion was carried.

Robert Petrovich stated this is sales and use tax and mortgage recording tax. He stated there is no PILOT on this project.

Upon a motion by Susan Stanczyk, seconded by Janice Herzog, the OCIDA Board approved a resolution authorizing the financial assistance the Agency will provide to include exemptions 3 Page5 from sales and use taxes, real estate transfer taxes and mortgage recording taxes. Kevin Ryan abstained. Motion was carried.

BID AWARD

WHITE PINE COMMERCE PARK DEMOLITION Robert Petrovich stated that by working with Barton and Loguidice Engineering, the bid for demolition work that needs to be done has been completed. He stated OCIDA staff worked with Onondaga County Purchasing Department to put out a bid for this project, reviewed results with the engineers and the Onondaga County Equity and Inclusion Office of the county for MWBE requirements, we are in a position to make a recommendation to the Board to proceed with a Notice of Intent to award the contract to the low bidder that has been brought forward through that process. He stated the expectation is to immediately provide that Notice of Intent and then work to be on site either just before or just after Labor Day to commence the demolition activities.

Robert Petrovich stated this is sales and use tax and mortgage recording tax. He stated there is no PILOT on this project.

Upon a motion by Susan Stanczyk, seconded by Janice Herzog, the OCIDA Board approved a resolution authorizing the financial assistance the Agency will provide to include exemptions 3 Page5 from sales and use taxes, real estate transfer taxes and mortgage recording taxes. Kevin Ryan abstained. Motion was carried.

BID AWARD

WHITE PINE COMMERCE PARK DEMOLITION Robert Petrovich stated that by working with Barton and Loguidice Engineering, the bid for demolition work that needs to be done has been completed. He stated OCIDA staff worked with Onondaga County Purchasing Department to put out a bid for this project, reviewed results with the engineers and the Onondaga County Equity and Inclusion Office of the county for MWBE requirements, we are in a position to make a recommendation to the Board to proceed with a Notice of Intent to award the contract to the low bidder that has been brought forward through that process. He stated the expectation is to immediately provide that Notice of Intent and then work to be on site either just before or just after Labor Day to commence the demolition activities.

Jeff Davis stated from a SEQR standpoint the action of the removal of the homes was studied as part of the Supplemental Generic EIS process that was done when the Board put forth the effort to expand the park and acquire these lands. He stated from a SEQR standpoint the demo of the homes was considered and studied in that process.

Kevin Ryan asked if anyone inquired why Gorick Construction was much lower than the other bidders on the list. Robert Petrovich stated there was a detailed scope included in the bid. He stated when the bids were submitted, the engineering firm reached back out to the contractors to make sure the low bidder understood the scope and to ensure nothing was missing. He stated change orders can happen for many reasons but staff is confident based on vetting and review of the scope and discussions with the contractor that the price they put forward is fulsome in its response to the RFP.

Susan Stanczyk asked if the engineering firm has worked with them in the past. Robert Petrovich stated yes, and other folks that were solicited for references have said they are a quality firm to work with.

Susan Stanczyk asked where they are located. Robert Petrovich stated Binghamton.

4 Page6 Jeff Davis stated from a SEQR standpoint the action of the removal of the homes was studied as part of the Supplemental Generic EIS process that was done when the Board put forth the effort to expand the park and acquire these lands. He stated from a SEQR standpoint the demo of the homes was considered and studied in that process.

Kevin Ryan asked if anyone inquired why Gorick Construction was much lower than the other bidders on the list. Robert Petrovich stated there was a detailed scope included in the bid. He stated when the bids were submitted, the engineering firm reached back out to the contractors to make sure the low bidder understood the scope and to ensure nothing was missing. He stated change orders can happen for many reasons but staff is confident based on vetting and review of the scope and discussions with the contractor that the price they put forward is fulsome in its response to the RFP.

Susan Stanczyk asked if the engineering firm has worked with them in the past. Robert Petrovich stated yes, and other folks that were solicited for references have said they are a quality firm to work with.

Susan Stanczyk asked where they are located. Robert Petrovich stated Binghamton.

4 Page6 Upon a motion by Kevin Ryan, seconded by Janice Herzog, the OCIDA Board approved a resolution authorizing the Executive Director to accept a bid and enter into one or more agreement for site clearance services with Gorick Construction for site clearance services at White Pine Commerce Park. Motion was carried.

TRACEY ROAD EQUIPMMENT, INC. / GERALD W. TRACEY PROJECT. (3101-20-03B)

Amanda Fitzgerald stated the Tracey Road Equipment expansion project closed in 2020 and they are here today to request the Board authorize the Executive Director to enter into lender documents in connection with converting their construction financing to permanent financing. She stated they have given counsel the lender documents for review to make sure it has all the required provisions to indemnify the Board and the Agency. She stated everything looks good and she recommends it be passed today.

Upon a motion by Fanny Villarreal, seconded by Janice Herzog, the OCIDA Board approved a resolution authorizing execution and delivery of documents for the Tracey Road Equipment, Inc./Gerald W. Tracey project. Motion was carried.

Upon a motion by Kevin Ryan, seconded by Janice Herzog, the OCIDA Board approved a resolution authorizing the Executive Director to accept a bid and enter into one or more agreement for site clearance services with Gorick Construction for site clearance services at White Pine Commerce Park. Motion was carried.

TRACEY ROAD EQUIPMMENT, INC. / GERALD W. TRACEY PROJECT. (3101-20-03B)

Amanda Fitzgerald stated the Tracey Road Equipment expansion project closed in 2020 and they are here today to request the Board authorize the Executive Director to enter into lender documents in connection with converting their construction financing to permanent financing. She stated they have given counsel the lender documents for review to make sure it has all the required provisions to indemnify the Board and the Agency. She stated everything looks good and she recommends it be passed today.

Upon a motion by Fanny Villarreal, seconded by Janice Herzog, the OCIDA Board approved a resolution authorizing execution and delivery of documents for the Tracey Road Equipment, Inc./Gerald W. Tracey project. Motion was carried.

COR INNER HABOR COMPANY, LLC ET AL (3101-20-03B)

Robert Petrovich stated COR has property within the Inner Harbor with 10 parcels in total. He stated two of these parcels are looking to be acquired by the County for the aquarium project. He stated this is a modification and a change of our agreement with COR to release those 2 parcels from the lease/leaseback agreement that we have with them which has come up as a title issue. He stated by doing this it cures that title issue and allows the County to proceed with the acquisition of these 2 parcels for the advancement of the aquarium project. He stated there will be 8 remaining parcels that are in the lease/leaseback agreement and there will be some agreement modifications after that need to occur to codify all of that. He stated there have been discussions with COR and the projects they are anticipating on the property are looking to advance.

Jeff Davis stated it is really just title cleanup. He stated the Agency has a lease/leaseback over the property. He stated the county can’t accept the land and acquire it with a lease/leaseback 5 Page7 existing on it so the Agency lease/leaseback encompasses the whole 32 acre area so we are just shortening up the lease/leaseback agreement which will flow through the other agreements in the description as to what is covered so that these two parcels can be carved out.

COR INNER HABOR COMPANY, LLC ET AL (3101-20-03B)

Robert Petrovich stated COR has property within the Inner Harbor with 10 parcels in total. He stated two of these parcels are looking to be acquired by the County for the aquarium project. He stated this is a modification and a change of our agreement with COR to release those 2 parcels from the lease/leaseback agreement that we have with them which has come up as a title issue. He stated by doing this it cures that title issue and allows the County to proceed with the acquisition of these 2 parcels for the advancement of the aquarium project. He stated there will be 8 remaining parcels that are in the lease/leaseback agreement and there will be some agreement modifications after that need to occur to codify all of that. He stated there have been discussions with COR and the projects they are anticipating on the property are looking to advance.

Jeff Davis stated it is really just title cleanup. He stated the Agency has a lease/leaseback over the property. He stated the county can’t accept the land and acquire it with a lease/leaseback 5 Page7 existing on it so the Agency lease/leaseback encompasses the whole 32 acre area so we are just shortening up the lease/leaseback agreement which will flow through the other agreements in the description as to what is covered so that these two parcels can be carved out.

Janice Herzog asked how big the parcels are. Amanda Fitzgerald stated together they are about 4 acres out of the total of 32.

Patrick Hogan asked if this is connected to the first PILOT agreement with COR. Jeff Davis stated yes.

Upon a motion by Janice Herzog seconded by Susan Stanczyk, the OCIDA Board approved a resolution authorizing a release of a portion of the Agency leasehold interest and the sale of parcels of property and related actions for the COR Inner Harbor Company, LLC project.

Motion was carried.

Janice Herzog asked how big the parcels are. Amanda Fitzgerald stated together they are about 4 acres out of the total of 32.

Patrick Hogan asked if this is connected to the first PILOT agreement with COR. Jeff Davis stated yes.

Upon a motion by Janice Herzog seconded by Susan Stanczyk, the OCIDA Board approved a resolution authorizing a release of a portion of the Agency leasehold interest and the sale of parcels of property and related actions for the COR Inner Harbor Company, LLC project.

Motion was carried.

ADJOURN

Upon a motion by Susan Stanczyk, seconded by Janice Herzog, the OCIDA Board adjourned the meeting at 8:50 am. Motion was carried.

_________________________________ Nancy Lowery, Secretary 6 Page8

ADJOURN

Upon a motion by Susan Stanczyk, seconded by Janice Herzog, the OCIDA Board adjourned the meeting at 8:50 am. Motion was carried.

_________________________________ Nancy Lowery, Secretary 6 Page8

ONONDAGA COUNTY INDUSTRIAL DEVELOPMENT AGENCY

335 MONTGOMERY STREET, 2ND FLOOR, SYRACUSE, NY 13202

PHONE: 315.435.3770 • ECONOMICDEVELOPMENT@ONGOV.NET August 31, 2023

2023 Budget Current YTD

Revenue / Expense / Income Current Period Current YTD Amount Change to Budget Operating/Non-Op Revenue 165,074 2,167,296 1,472,880 694,416 Administrative Expense 45,276 393,357 816,000 (422,643) Operating/Program Expense 41,729 529,070 656,880 (127,810) Net Ordinary Income 78,069 1,244,869 - 1,244,869 Current Assets Current YTD Prior YTD Total Cash 6,071,900 4,109,772 Less Pass Through Received 306,566 - Available Cash 5,765,335 4,109,772 Receivables 269,650 153,141 Total 6,034,984 4,262,913

ONONDAGA COUNTY INDUSTRIAL DEVELOPMENT AGENCY

335 MONTGOMERY STREET, 2ND FLOOR, SYRACUSE, NY 13202

PHONE: 315.435.3770 • ECONOMICDEVELOPMENT@ONGOV.NET August 31, 2023

2023 Budget Current YTD

Revenue / Expense / Income Current Period Current YTD Amount Change to Budget Operating/Non-Op Revenue 165,074 2,167,296 1,472,880 694,416 Administrative Expense 45,276 393,357 816,000 (422,643) Operating/Program Expense 41,729 529,070 656,880 (127,810) Net Ordinary Income 78,069 1,244,869 - 1,244,869 Current Assets Current YTD Prior YTD Total Cash 6,071,900 4,109,772 Less Pass Through Received 306,566 - Available Cash 5,765,335 4,109,772 Receivables 269,650 153,141 Total 6,034,984 4,262,913 Receivables 0-120 days 264,860 > 120 days 4,790 Total 269,650 Page9 Onondaga County Industrial Development Agency Profit and Loss August 2023 Receivables 0-120 days 264,860 > 120 days 4,790 Total 269,650 Page9 Onondaga County Industrial Development Agency Profit and Loss August 2023

TOTAL

Income

500 Operating Revenue

2116 Fees

2116.1 Agency Fees 3,000.00 2116.2 Application Fees 1,000.00 2116.3 WPCP Agency Fee 148,748.61 Total 2116 Fees 152,748.61 2410 Lease Income 2,448.60 Total 500 Operating Revenue 155,197.21

501 Non-Operating Revenue

2401 Interest Income 7,230.68 Total 501 Non-Operating Revenue 7,230.68 527 Nat Grid Matching Grant 2,646.00

534 Pilot & Pass Thru Revenue

528.003 OHB Redev LLC Funds Pass Thru 1,224.50 529 PILOT Income 1,533,034.99 Total 534 Pilot & Pass Thru Revenue 1,534,259.49 550 WPCP Pass Thru Revenue 319,170.66 Total Income $2,018,504.04 GROSS PROFIT $2,018,504.04 Expenses

6400 Operating Expense

6401 Insurance 1,090.74 6406 Other Professional Services 405.00 6407 Administrative Expense 45,275.64 6408 Meeting Expenses 1,593.88 6409.1 Project Events 180.00 6410 Office Expense 1,054.26 6411 Memberships / Sponsorships 1,000.00 Total 6400 Operating Expense 50,599.52

6450 Barclay Damon

6460 IDA General Legal 3,506.25 6480 Roth Legal 60.00 Total 6450 Barclay Damon 3,566.25 Total 6440 Legal Fees 3,566.25

6500 Agency Program Expenses

6510 White Pine Commerce Park

6510.4 Other Expenses 25.00 6510.7 WPCP Marketing 18,772.13 Total 6510 White Pine Commerce Park 18,797.13

TOTAL

Income

500 Operating Revenue

2116 Fees

2116.1 Agency Fees 3,000.00 2116.2 Application Fees 1,000.00 2116.3 WPCP Agency Fee 148,748.61 Total 2116 Fees 152,748.61 2410 Lease Income 2,448.60 Total 500 Operating Revenue 155,197.21

501 Non-Operating Revenue

2401 Interest Income 7,230.68 Total 501 Non-Operating Revenue 7,230.68 527 Nat Grid Matching Grant 2,646.00

534 Pilot & Pass Thru Revenue

528.003 OHB Redev LLC Funds Pass Thru 1,224.50 529 PILOT Income 1,533,034.99 Total 534 Pilot & Pass Thru Revenue 1,534,259.49 550 WPCP Pass Thru Revenue 319,170.66 Total Income $2,018,504.04 GROSS PROFIT $2,018,504.04 Expenses

6400 Operating Expense

6401 Insurance 1,090.74 6406 Other Professional Services 405.00 6407 Administrative Expense 45,275.64 6408 Meeting Expenses 1,593.88 6409.1 Project Events 180.00 6410 Office Expense 1,054.26 6411 Memberships / Sponsorships 1,000.00 Total 6400 Operating Expense 50,599.52

6450 Barclay Damon

6460 IDA General Legal 3,506.25 6480 Roth Legal 60.00 Total 6450 Barclay Damon 3,566.25 Total 6440 Legal Fees 3,566.25

6500 Agency Program Expenses

6510 White Pine Commerce Park

6510.4 Other Expenses 25.00 6510.7 WPCP Marketing 18,772.13 Total 6510 White Pine Commerce Park 18,797.13 Page10 Accrual Basis Monday, September 11, 2023 11:45 AM GMT-04:00 1/2 Onondaga County Industrial Development Agency Profit and Loss August 2023

TOTAL

6530 800 Hiawatha Blvd. West 6530.3 Engineering 14,041.85 Total 6530 800 Hiawatha Blvd. West 14,041.85 Total 6500 Agency Program Expenses 32,838.98

6600 Non-Operating Expenses

6605 Pilot & Pass Thru Expenses

6606 OHB Redev LLC Funds Pass Thru 1,224.50 Total 6605 Pilot & Pass Thru Expenses 1,224.50 Total 6600 Non-Operating Expenses 1,224.50

6610 WPCP Pass Thru Expenses

6610.1 Barclay Damon 177,777.78 6610.2 JMT 128,787.88 6610.6 Barton & Loguidice 12,605.00 Total 6610 WPCP Pass Thru Expenses 319,170.66 Total Expenses $407,399.91 NET OPERATING INCOME $1,611,104.13 NET INCOME $1,611,104.13 Page10 Accrual Basis Monday, September 11, 2023 11:45 AM GMT-04:00 1/2 Onondaga County Industrial Development Agency Profit and Loss August 2023

TOTAL

6530 800 Hiawatha Blvd. West 6530.3 Engineering 14,041.85 Total 6530 800 Hiawatha Blvd. West 14,041.85 Total 6500 Agency Program Expenses 32,838.98

6600 Non-Operating Expenses

6605 Pilot & Pass Thru Expenses

6606 OHB Redev LLC Funds Pass Thru 1,224.50 Total 6605 Pilot & Pass Thru Expenses 1,224.50 Total 6600 Non-Operating Expenses 1,224.50

6610 WPCP Pass Thru Expenses

6610.1 Barclay Damon 177,777.78 6610.2 JMT 128,787.88 6610.6 Barton & Loguidice 12,605.00 Total 6610 WPCP Pass Thru Expenses 319,170.66 Total Expenses $407,399.91 NET OPERATING INCOME $1,611,104.13 NET INCOME $1,611,104.13 Page11 Accrual Basis Monday, September 11, 2023 11:45 AM GMT-04:00 2/2 Onondaga County Industrial Development Agency Balance Sheet As of August 31, 2023

TOTAL

ASSETS

Current Assets Bank Accounts 200 Cash 0.00 200.1 Cash - M & T Checking 5,175,390.50 200.2 Cash - M & T Money Maker Savings 905,417.58 200.4 Destiny USA Restricted Cash -8,957.82 210 Petty Cash 50.00 Total 200 Cash 6,071,900.26 Total Bank Accounts $6,071,900.26 Accounts Receivable 380 Accounts Rec.

380.6 A/R Fees, Lease & PILOT 2,613,024.05 Total 380 Accounts Rec. 2,613,024.05 Total Accounts Receivable $2,613,024.05 Other Current Assets

480 Prepaid Expenses

480.4 Credit Balance on Card -2,925.00 Total 480 Prepaid Expenses -2,925.00 Total Other Current Assets $ -2,925.00 Total Current Assets $8,681,999.31 Fixed Assets

100 Land

101 White Pines Commerce Park 2,503,051.37

101.1 WPCP GEIS

101.101 CHA GEIS 1 267,452.05 101.102 CHA GEIS 2 219,439.36 101.104 GEIS Reg Plan Board Overview 19,797.74 Total 101.1 WPCP GEIS 506,689.15 101.2 WPCP Legal 69,774.25 101.3 Engineering Services 52,675.00 101.301 Temporary Access 4,055.44 101.4 Environmental/Demo Services 10,318.98 Total 101.3 Engineering Services 67,049.42

101.5 Land Acquisition Costs

101.501 Land Purchases 1,160,063.57 101.502 Closing Costs 3,168.14 Page11 Accrual Basis Monday, September 11, 2023 11:45 AM GMT-04:00 2/2 Onondaga County Industrial Development Agency Balance Sheet As of August 31, 2023

TOTAL

ASSETS

Current Assets Bank Accounts 200 Cash 0.00 200.1 Cash - M & T Checking 5,175,390.50 200.2 Cash - M & T Money Maker Savings 905,417.58 200.4 Destiny USA Restricted Cash -8,957.82 210 Petty Cash 50.00 Total 200 Cash 6,071,900.26 Total Bank Accounts $6,071,900.26 Accounts Receivable 380 Accounts Rec.

380.6 A/R Fees, Lease & PILOT 2,613,024.05 Total 380 Accounts Rec. 2,613,024.05 Total Accounts Receivable $2,613,024.05 Other Current Assets

480 Prepaid Expenses

480.4 Credit Balance on Card -2,925.00 Total 480 Prepaid Expenses -2,925.00 Total Other Current Assets $ -2,925.00 Total Current Assets $8,681,999.31 Fixed Assets

100 Land

101 White Pines Commerce Park 2,503,051.37

101.1 WPCP GEIS

101.101 CHA GEIS 1 267,452.05 101.102 CHA GEIS 2 219,439.36 101.104 GEIS Reg Plan Board Overview 19,797.74 Total 101.1 WPCP GEIS 506,689.15 101.2 WPCP Legal 69,774.25 101.3 Engineering Services 52,675.00 101.301 Temporary Access 4,055.44 101.4 Environmental/Demo Services 10,318.98 Total 101.3 Engineering Services 67,049.42

101.5 Land Acquisition Costs

101.501 Land Purchases 1,160,063.57 101.502 Closing Costs 3,168.14 Page12 Accrual Basis Monday, September 11, 2023 11:44 AM GMT-04:00 1/3 Onondaga County Industrial Development Agency Balance Sheet As of August 31, 2023

TOTAL

Total 101.5 Land Acquisition Costs 1,163,231.71 101.6 WPCP Marketing 2,984.34 Total 101 White Pines Commerce Park 4,312,780.24 106 North Salina Properties 0.00 106.1 435 North Salina 17,083.55 106.3 435 North Salina Building 634,421.53 Total 106 North Salina Properties 651,505.08 107 800 Hiawatha 604,840.42 Total 100 Land 5,569,125.74

104 Machinery & Equipment

104.1 Office Furniture 1,429.00 104.2 Equipment 4,589.00 Total 104 Machinery & Equipment 6,018.00 211 A/D Office Furniture -4,124.00 213 A/D Buildings -113,870.00 250 Investment in Real Property 29,508,083.00 Total Fixed Assets $34,965,232.74 Other Assets 240 Blue Sky Redevelopment 1,641.76 Total Other Assets $1,641.76 TOTAL ASSETS $43,648,873.81 Page12 Accrual Basis Monday, September 11, 2023 11:44 AM GMT-04:00 1/3 Onondaga County Industrial Development Agency Balance Sheet As of August 31, 2023

TOTAL

Total 101.5 Land Acquisition Costs 1,163,231.71 101.6 WPCP Marketing 2,984.34 Total 101 White Pines Commerce Park 4,312,780.24 106 North Salina Properties 0.00 106.1 435 North Salina 17,083.55 106.3 435 North Salina Building 634,421.53 Total 106 North Salina Properties 651,505.08 107 800 Hiawatha 604,840.42 Total 100 Land 5,569,125.74

104 Machinery & Equipment

104.1 Office Furniture 1,429.00 104.2 Equipment 4,589.00 Total 104 Machinery & Equipment 6,018.00 211 A/D Office Furniture -4,124.00 213 A/D Buildings -113,870.00 250 Investment in Real Property 29,508,083.00 Total Fixed Assets $34,965,232.74 Other Assets 240 Blue Sky Redevelopment 1,641.76 Total Other Assets $1,641.76 TOTAL ASSETS $43,648,873.81

LIABILITIES AND EQUITY

Liabilities Current Liabilities Accounts Payable 300 WPCP Pass Thru Payable 1,119,984.98 Total Accounts Payable $1,119,984.98 Other Current Liabilities 600 Accounts Payable 0.00 600.1 Due to Related Party - OED 393,356.74 600.102 Due to BD WPCP -0.34 600.204 OHB Redev LLC Funds 296,449.15 600.205 Exp Pay Prev Period 9,700.03 600.206 Mileage Reimbursement 0.34 600.208 BlueRock Energy Agreement Deposit 25,000.00 600.209 Syracuse Rail Overpayment 500.00 600.3 Onondaga County Loan 26,088,187.09 600.31 Accrued Interest - OC Note Payable 488,656.00 Total 600.3 Onondaga County Loan 26,576,843.09

LIABILITIES AND EQUITY

Liabilities Current Liabilities Accounts Payable 300 WPCP Pass Thru Payable 1,119,984.98 Total Accounts Payable $1,119,984.98 Other Current Liabilities 600 Accounts Payable 0.00 600.1 Due to Related Party - OED 393,356.74 600.102 Due to BD WPCP -0.34 600.204 OHB Redev LLC Funds 296,449.15 600.205 Exp Pay Prev Period 9,700.03 600.206 Mileage Reimbursement 0.34 600.208 BlueRock Energy Agreement Deposit 25,000.00 600.209 Syracuse Rail Overpayment 500.00 600.3 Onondaga County Loan 26,088,187.09 600.31 Accrued Interest - OC Note Payable 488,656.00 Total 600.3 Onondaga County Loan 26,576,843.09 Page13 Accrual Basis Monday, September 11, 2023 11:44 AM GMT-04:00 2/3 Onondaga County Industrial Development Agency Balance Sheet As of August 31, 2023

TOTAL

Total 600 Accounts Payable 27,301,849.01

601 PILOT and Pass Thru Payable

602 Pass Thru Payable 32,471.00 603 PILOT Pass Thru 1.01 Total 601 PILOT and Pass Thru Payable 32,472.01

631 Due to Other Governments

631.1 Towns

631.12 Dewitt -21.86 631.145 Onondaga -4.45 631.15 Salina -0.81 Total 631.1 Towns -27.12

631.3 Schools

631.325 Jamesville-Dewitt -143.05 631.356 Syracuse -114,994.17 Total 631.3 Schools -115,137.22 631.4 Onondaga County -80,450.12 631.5 City of Syracuse -65,309.94 Total 631 Due to Other Governments -260,924.40 Total Other Current Liabilities $27,073,396.62 Total Current Liabilities $28,193,381.60 Total Liabilities $28,193,381.60 Equity 3900 Equity Unreserved 9,753,381.97 3901 Equity-Investment Fixed Assets 2,345,838.63 463 Reserve For Contracts 368,811.84 465 Equity - Unreserved 4,017.16 Net Income 2,983,442.61 Total Equity $15,455,492.21 TOTAL LIABILITIES AND EQUITY $43,648,873.81 Page13 Accrual Basis Monday, September 11, 2023 11:44 AM GMT-04:00 2/3 Onondaga County Industrial Development Agency Balance Sheet As of August 31, 2023

TOTAL

Total 600 Accounts Payable 27,301,849.01

601 PILOT and Pass Thru Payable

602 Pass Thru Payable 32,471.00 603 PILOT Pass Thru 1.01 Total 601 PILOT and Pass Thru Payable 32,472.01

631 Due to Other Governments

631.1 Towns

631.12 Dewitt -21.86 631.145 Onondaga -4.45 631.15 Salina -0.81 Total 631.1 Towns -27.12

631.3 Schools

631.325 Jamesville-Dewitt -143.05 631.356 Syracuse -114,994.17 Total 631.3 Schools -115,137.22 631.4 Onondaga County -80,450.12 631.5 City of Syracuse -65,309.94 Total 631 Due to Other Governments -260,924.40 Total Other Current Liabilities $27,073,396.62 Total Current Liabilities $28,193,381.60 Total Liabilities $28,193,381.60 Equity 3900 Equity Unreserved 9,753,381.97 3901 Equity-Investment Fixed Assets 2,345,838.63 463 Reserve For Contracts 368,811.84 465 Equity - Unreserved 4,017.16 Net Income 2,983,442.61 Total Equity $15,455,492.21 TOTAL LIABILITIES AND EQUITY $43,648,873.81 Page14 Accrual Basis Monday, September 11, 2023 11:44 AM GMT-04:00 3/3 Page14 Accrual Basis Monday, September 11, 2023 11:44 AM GMT-04:00 3/3

ONONDAGA COUNTY INDUSTRIAL DEVELOPMENT AGENCY

PAYMENT OF BILLS - SCHEDULE #485 September 14, 2023

ONONDAGA COUNTY INDUSTRIAL DEVELOPMENT AGENCY

PAYMENT OF BILLS - SCHEDULE #485 September 14, 2023

GENERAL EXPENSES

1. ADVANCE MEDIA NEW YORK* $ 80.00 QP2 Properties Public Hearing, Inv#0003021388 2. NEW YORK STATE ECONOMIC DEVELOPMENT COUNCIL** $ 1,000.00 IAMC, Inv#14614 3. SYRACUSE DESIGN GROUP, LLC** $ 405.00 Website Design Services, Inv#6135 4. THE MANUFACTURERS ASSOCIATION** $ 180.00 Fall Kickoff Event, Inv#48445 5. BROWN & BROWN OF NEW YORK*** $ 37,612.50 Policy#5063-0131-00, Inv#13362165 6. THE MANUFACTURERS ASSOCIATION $ 1,102.00 Membership Investment 2023 7. BARCLAY DAMON LLP $ 177,777.78 July 2023 Legal Costs 8. JMT OF NEW YORK, INC. $ 128,787.88 July 2023 Engineering Services 9. FEDEX $ 8.30 Inv#8-215-01995 10. PARK STRATEGIES $ 5,000.00 August-September 2023 Consulting Services TOTAL $ 351,953.46 *Ratification of Check dated August 17, 2023 **Ratification of Check dated August 24, 2023 ***Ratification of Check dated September 7, 2023 Page15

GENERAL EXPENSES

1. ADVANCE MEDIA NEW YORK* $ 80.00 QP2 Properties Public Hearing, Inv#0003021388 2. NEW YORK STATE ECONOMIC DEVELOPMENT COUNCIL** $ 1,000.00 IAMC, Inv#14614 3. SYRACUSE DESIGN GROUP, LLC** $ 405.00 Website Design Services, Inv#6135 4. THE MANUFACTURERS ASSOCIATION** $ 180.00 Fall Kickoff Event, Inv#48445 5. BROWN & BROWN OF NEW YORK*** $ 37,612.50 Policy#5063-0131-00, Inv#13362165 6. THE MANUFACTURERS ASSOCIATION $ 1,102.00 Membership Investment 2023 7. BARCLAY DAMON LLP $ 177,777.78 July 2023 Legal Costs 8. JMT OF NEW YORK, INC. $ 128,787.88 July 2023 Engineering Services 9. FEDEX $ 8.30 Inv#8-215-01995 10. PARK STRATEGIES $ 5,000.00 August-September 2023 Consulting Services TOTAL $ 351,953.46 *Ratification of Check dated August 17, 2023 **Ratification of Check dated August 24, 2023 ***Ratification of Check dated September 7, 2023 Page15

ONONDAGA COUNTY INDUSTRIAL DEVELOPMENT AGENCY

PAYMENT OF BILLS - SCHEDULE #485 September 14, 2023 PILOT Payments 1. CITY OF SYRACUSE* $ 1,791.97 Syracuse Rail 2nd Quarter PILOT Payment 2. ONONDAGA COUNTY* $ 1,152.18 Syracuse Rail 2nd Quarter PILOT Payment 3. TOWN OF ONONDAGA* $ 3.60 Syracuse Rail 2nd Quarter PILOT Payment 4. TOWN OF DEWITT* $ 17.66 Syracuse Rail 2nd Quarter PILOT Payment 5. JAMESVILLE-DEWITT CENTRAL SCHOOL DISTRICT* $ 115.58 Syracuse Rail 2nd Quarter PILOT Payment 6. BALDWINSVILLE CSD $ 1,529,954.00 Anheuser-Busch PILOT Payment TOTAL $ 1,533,034.99 *Ratification of Checks dated August 24, 2023 1 Page16 Page17 Page18 Page19 Page20 Page21 Page22 Page23 Page24

825.004.001

9/7/23

KFE/KMK

ONONDAGA COUNTY INDUSTRIAL DEVELOPMENT AGENCY

PAYMENT OF BILLS - SCHEDULE #485 September 14, 2023 PILOT Payments 1. CITY OF SYRACUSE* $ 1,791.97 Syracuse Rail 2nd Quarter PILOT Payment 2. ONONDAGA COUNTY* $ 1,152.18 Syracuse Rail 2nd Quarter PILOT Payment 3. TOWN OF ONONDAGA* $ 3.60 Syracuse Rail 2nd Quarter PILOT Payment 4. TOWN OF DEWITT* $ 17.66 Syracuse Rail 2nd Quarter PILOT Payment 5. JAMESVILLE-DEWITT CENTRAL SCHOOL DISTRICT* $ 115.58 Syracuse Rail 2nd Quarter PILOT Payment 6. BALDWINSVILLE CSD $ 1,529,954.00 Anheuser-Busch PILOT Payment TOTAL $ 1,533,034.99 *Ratification of Checks dated August 24, 2023 1 Page16 Page17 Page18 Page19 Page20 Page21 Page22 Page23 Page24

825.004.001

9/7/23

KFE/KMK

PROFESSIONAL SERVICES

STATEMENT OF WORK NO. 2023‐02 CAUGHDENOY ROAD BUSINESS PARK ‐ SITE DEVELOPMENT ASSISTANCE Reference is made to the Master Services Agreement for Professional Services ("Agreement"), dated March 17, 2023, between the Onondaga County Industrial Development Agency (the "Agency") and Barton & Loguidice, D.P.C. (Contractor”). This document is the "Statement of Work" or "SOW" referred to in the Agreement and will be governed by the Agreement. All capitalized terms herein will have the same meaning as specified in the Agreement unless otherwise specified below.

In accordance with the Agreement, the parties hereby agree as follows:

 BACKGROUND:

Agency, under SOW 2023‐01, authorized Contractor to prepare two (2) alternative general Site Concept Plans for the “Caughdenoy Road Business Park” to accommodate anticipated supply chain companies in support of Micron. Agency has requested further advancement of site toward “shovel readiness” to be used in support of approvals to be sought from the Town of Clay, Onondaga County Water Authority (OCWA), Onondaga County Department of Water Environment Protection (OCDWEP), and various other regulatory and permitting agencies.

PROFESSIONAL SERVICES

STATEMENT OF WORK NO. 2023‐02 CAUGHDENOY ROAD BUSINESS PARK ‐ SITE DEVELOPMENT ASSISTANCE Reference is made to the Master Services Agreement for Professional Services ("Agreement"), dated March 17, 2023, between the Onondaga County Industrial Development Agency (the "Agency") and Barton & Loguidice, D.P.C. (Contractor”). This document is the "Statement of Work" or "SOW" referred to in the Agreement and will be governed by the Agreement. All capitalized terms herein will have the same meaning as specified in the Agreement unless otherwise specified below.

In accordance with the Agreement, the parties hereby agree as follows:

 BACKGROUND:

Agency, under SOW 2023‐01, authorized Contractor to prepare two (2) alternative general Site Concept Plans for the “Caughdenoy Road Business Park” to accommodate anticipated supply chain companies in support of Micron. Agency has requested further advancement of site toward “shovel readiness” to be used in support of approvals to be sought from the Town of Clay, Onondaga County Water Authority (OCWA), Onondaga County Department of Water Environment Protection (OCDWEP), and various other regulatory and permitting agencies.  PROJECT OBJECTIVES & SCOPE OF SERVICE:

Assist Agency with preliminary engineering services necessary for moving the proposed “Caughdenoy Road Business Park” toward “shovel readiness”, including planning for the extension of public water and sewer service to the site.

1. Refinement of Water & Sewer Utility Layouts

a. OCWA Water i. Attend up to two (2) meetings with OCIDA and OCWA representatives to review proposed water infrastructure for extending public water to the Micron facility, including easement and construction access needs. ii. Integrate planned OCWA‐Micron infrastructure into the Concept Site Plan, generally confined to the northwest corner of the site.

B&L Statement of Work 2023-02 090723 (ID 2960968) Page25  PROJECT OBJECTIVES & SCOPE OF SERVICE:

Assist Agency with preliminary engineering services necessary for moving the proposed “Caughdenoy Road Business Park” toward “shovel readiness”, including planning for the extension of public water and sewer service to the site.

1. Refinement of Water & Sewer Utility Layouts

a. OCWA Water i. Attend up to two (2) meetings with OCIDA and OCWA representatives to review proposed water infrastructure for extending public water to the Micron facility, including easement and construction access needs. ii. Integrate planned OCWA‐Micron infrastructure into the Concept Site Plan, generally confined to the northwest corner of the site.

B&L Statement of Work 2023-02 090723 (ID 2960968) Page25 b. OCDWEP Sewer i. Attend up to two (2) meetings with OCIDA and OCDWEP representatives to review proposed sanitary pump station/force main infrastructure for extending public sewer service to the Site, including easement, construction access, operation and maintenance needs.

ii. Obtain CAD base mapping and 50% design drawings from WEP (or EDR, WEP’s Consultant) and integrate planned OCWEP infrastructure into the Concept Site Plan, generally confined to the northwest corner of the site. Coordinate site layout with OCWA infrastructure.

c. Modify the two (2) conceptual site layouts as required to accommodate water/sewer infrastructure.

b. OCDWEP Sewer i. Attend up to two (2) meetings with OCIDA and OCDWEP representatives to review proposed sanitary pump station/force main infrastructure for extending public sewer service to the Site, including easement, construction access, operation and maintenance needs.

ii. Obtain CAD base mapping and 50% design drawings from WEP (or EDR, WEP’s Consultant) and integrate planned OCWEP infrastructure into the Concept Site Plan, generally confined to the northwest corner of the site. Coordinate site layout with OCWA infrastructure.

c. Modify the two (2) conceptual site layouts as required to accommodate water/sewer infrastructure.

2. Project Meetings and General Technical Support Services

a. Representatives and subject matter experts from B&L’s various Practice Areas (i.e., Water Resources, Environmental, Sustainable Planning & Design, Transportation) will assist Agency with preparation and attendance at project and stakeholder meetings, as requested. b. Attendance at the following meetings is anticipated; we will endeavor to limit staff to only those that will add value and insight to the meeting:

i. Utility agency/consultant coordination meetings;

ii. Town of Clay coordination meetings;

iii. Virtual/in‐person progress and strategy meetings;

iv. Deliverables review meetings  PROJECT DELIVERABLES:

Task No. Deliverables Description 1.a., b., c. Draft and Final Concept Site Utility Plans  PROJECT STAFFING (OPTIONAL): TBD NAME TITLE ROLE RESPONSIBILITIES B&L Statement of Work 2023-02 090723 (ID 2960968) Page26  PROJECT MILESTONE DATES (IF APPLICABLE):

2. Project Meetings and General Technical Support Services

a. Representatives and subject matter experts from B&L’s various Practice Areas (i.e., Water Resources, Environmental, Sustainable Planning & Design, Transportation) will assist Agency with preparation and attendance at project and stakeholder meetings, as requested. b. Attendance at the following meetings is anticipated; we will endeavor to limit staff to only those that will add value and insight to the meeting:

i. Utility agency/consultant coordination meetings;

ii. Town of Clay coordination meetings;

iii. Virtual/in‐person progress and strategy meetings;

iv. Deliverables review meetings  PROJECT DELIVERABLES:

Task No. Deliverables Description 1.a., b., c. Draft and Final Concept Site Utility Plans  PROJECT STAFFING (OPTIONAL): TBD NAME TITLE ROLE RESPONSIBILITIES B&L Statement of Work 2023-02 090723 (ID 2960968) Page26  PROJECT MILESTONE DATES (IF APPLICABLE):

The detailed milestone dates for completion of the applicable Services is set forth below:

Task Milestone Description Completion Date 1.a. and b. Draft and Final Concept Site Utility Plans 10/13/23  ACCEPTANCE:

The Deliverables and the Services shall conform to the following standard(s): N/A  SERVICE FEE o Service Fee Time & Expense in accordance with Contractor’s 2023 Standard Billing Rate Schedule; “not to exceed” fee without supplemental authorization from Agency. Estimated fee for each Task is summarized below.

Task Task Description Estimated Fee

1. Refinement of Water & Sewer Utility Layouts $8,500

2. Project Meetings and General Technical Support Services $1,500

Total Fee: $10,000 o Expenses The Service Fees and costs specified herein represent all of the fees and costs associated with the Services under this SOW.

 ADDITIONAL TERMS AND CONDITIONS: None THE PARTIES have duly executed this Statement of Work this _________day of September, 2023. The detailed milestone dates for completion of the applicable Services is set forth below:

Task Milestone Description Completion Date 1.a. and b. Draft and Final Concept Site Utility Plans 10/13/23  ACCEPTANCE:

The Deliverables and the Services shall conform to the following standard(s): N/A  SERVICE FEE o Service Fee Time & Expense in accordance with Contractor’s 2023 Standard Billing Rate Schedule; “not to exceed” fee without supplemental authorization from Agency. Estimated fee for each Task is summarized below.

Task Task Description Estimated Fee

1. Refinement of Water & Sewer Utility Layouts $8,500

2. Project Meetings and General Technical Support Services $1,500

Total Fee: $10,000 o Expenses The Service Fees and costs specified herein represent all of the fees and costs associated with the Services under this SOW.

 ADDITIONAL TERMS AND CONDITIONS: None THE PARTIES have duly executed this Statement of Work this _________day of September, 2023. CONTRACTOR: AGENCY:

BARTON & LOGUIDICE, D.P.C. ONONDAGA COUNTY INDUSTRIAL

DEVELOPMENT AGENCY

Signature: _________________________________ Signature: _____________________________ Print Name: Kenneth M. Knutsen _______________ Print Name: ___________________________ Title: Senior Vice President____________________ Title: _________________________________ Date: September 7, 2023______________________ Date: _________________________________ B&L Statement of Work 2023-02 090723 (ID 2960968) Page27 Full Environmental Assessment Form Part 1 - Project and Setting Instructions for Completing Part 1 Part 1 is to be completed by the applicant or project sponsor. Responses become part of the application for approval or funding, are subject to public review, and may be subject to further verification.

CONTRACTOR: AGENCY:

BARTON & LOGUIDICE, D.P.C. ONONDAGA COUNTY INDUSTRIAL

DEVELOPMENT AGENCY

Signature: _________________________________ Signature: _____________________________ Print Name: Kenneth M. Knutsen _______________ Print Name: ___________________________ Title: Senior Vice President____________________ Title: _________________________________ Date: September 7, 2023______________________ Date: _________________________________ B&L Statement of Work 2023-02 090723 (ID 2960968) Page27 Full Environmental Assessment Form Part 1 - Project and Setting Instructions for Completing Part 1 Part 1 is to be completed by the applicant or project sponsor. Responses become part of the application for approval or funding, are subject to public review, and may be subject to further verification.

Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as thoroughly as possible based on current information; indicate whether missing information does not exist, or is not reasonably available to the sponsor; and, when possible, generally describe work or studies which would be necessary to update or fully develop that information.

Applicants/sponsors must complete all items in Sections A & B. In Sections C, D & E, most items contain an initial question that must be answered either “Yes” or “No”. If the answer to the initial question is “Yes”, complete the sub-questions that follow. If the answer to the initial question is “No”, proceed to the next question. Section F allows the project sponsor to identify and attach any additional information. Section G requires the name and signature of the applicant or project sponsor to verify that the information contained in Part 1is accurate and complete.

A. Project and Applicant/Sponsor Information.

Name of Action or Project:

Micron New York Semiconductor Manufacturing Project Location (describe, and attach a general location map):

White Pine Commerce Park, 5171 Route 31, Town of Clay, NY 13041 Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as thoroughly as possible based on current information; indicate whether missing information does not exist, or is not reasonably available to the sponsor; and, when possible, generally describe work or studies which would be necessary to update or fully develop that information.

Applicants/sponsors must complete all items in Sections A & B. In Sections C, D & E, most items contain an initial question that must be answered either “Yes” or “No”. If the answer to the initial question is “Yes”, complete the sub-questions that follow. If the answer to the initial question is “No”, proceed to the next question. Section F allows the project sponsor to identify and attach any additional information. Section G requires the name and signature of the applicant or project sponsor to verify that the information contained in Part 1is accurate and complete.

A. Project and Applicant/Sponsor Information.

Name of Action or Project:

Micron New York Semiconductor Manufacturing Project Location (describe, and attach a general location map):

White Pine Commerce Park, 5171 Route 31, Town of Clay, NY 13041 Brief Description of Proposed Action (include purpose or need):

Micron intends to invest approximately $100 billion over the next 20 years to build a leading-edge semiconductor manufacturing campus in the Town of Clay on the approximately 1,400-acre White Pine Commerce Park. Micron intends to acquire the White Pine Commerce Park from the Onondaga County Industrial Development Agency (OCIDA) and construct a campus for four (4) memory fabrication plants (also known as Fabs) on the site. Each Fab, and their related facilities, would take approximately three to five years to construct. Interior fit-out of each Fab would continue after the building is complete, resulting in continuous site activity over approximately 20 years. It is anticipated that the first two (2) Fabs would be complete within approximately 10 years, and the second two (2) Fabs would be complete approximately 10 years thereafter. Skilled trade labor will be employed throughout the 20-year period. Each Fab would occupy approximately 1.2 million square feet (sf) of land and contain approx. 600,000 sf of cleanroom space, 290,000 sf of cleanroom support space, and 250,000 sf of administrative space. Each set of two fabs would be supported by approx. 470,000 sf of central utility buildings, 200,000 sf of warehouse space, and 200,000 sf of product testing space housed in separate buildings. A childcare center would be provided. The Micron Campus will also consist of ancillary on-site electrical substations, water and wastewater treatment and storage, and industrial gas storage. Brief Description of Proposed Action (include purpose or need):

Micron intends to invest approximately $100 billion over the next 20 years to build a leading-edge semiconductor manufacturing campus in the Town of Clay on the approximately 1,400-acre White Pine Commerce Park. Micron intends to acquire the White Pine Commerce Park from the Onondaga County Industrial Development Agency (OCIDA) and construct a campus for four (4) memory fabrication plants (also known as Fabs) on the site. Each Fab, and their related facilities, would take approximately three to five years to construct. Interior fit-out of each Fab would continue after the building is complete, resulting in continuous site activity over approximately 20 years. It is anticipated that the first two (2) Fabs would be complete within approximately 10 years, and the second two (2) Fabs would be complete approximately 10 years thereafter. Skilled trade labor will be employed throughout the 20-year period. Each Fab would occupy approximately 1.2 million square feet (sf) of land and contain approx. 600,000 sf of cleanroom space, 290,000 sf of cleanroom support space, and 250,000 sf of administrative space. Each set of two fabs would be supported by approx. 470,000 sf of central utility buildings, 200,000 sf of warehouse space, and 200,000 sf of product testing space housed in separate buildings. A childcare center would be provided. The Micron Campus will also consist of ancillary on-site electrical substations, water and wastewater treatment and storage, and industrial gas storage. Name of Applicant/Sponsor: Telephone: Micron New York Semiconductor Manufacturing LLC E-Mail: Address: 8000 S. Federal Way City/PO: Boise State: Zip Code: Idaho 83716 Project Contact (if not same as sponsor; give name and title/role): Telephone: 208-363-2424 Anna Eberlin, Senior Assistant General Counsel E-Mail: aeberlin@micron.com Address:

Same as above.

City/PO: State: Zip Code: Name of Applicant/Sponsor: Telephone: Micron New York Semiconductor Manufacturing LLC E-Mail: Address: 8000 S. Federal Way City/PO: Boise State: Zip Code: Idaho 83716 Project Contact (if not same as sponsor; give name and title/role): Telephone: 208-363-2424 Anna Eberlin, Senior Assistant General Counsel E-Mail: aeberlin@micron.com Address:

Same as above.

City/PO: State: Zip Code: Property Owner (if not same as sponsor): Telephone: (315) 435-3770 Onondaga County Industrial Development Agency (OCIDA) E-Mail: RobertPetrovich@ongov.net Address:

335 Montgomery Street, 2nd Floor

City/PO: State: Zip Code: Syracuse New York 13202 Page28 Property Owner (if not same as sponsor): Telephone: (315) 435-3770 Onondaga County Industrial Development Agency (OCIDA) E-Mail: RobertPetrovich@ongov.net Address:

335 Montgomery Street, 2nd Floor

City/PO: State: Zip Code: Syracuse New York 13202 Page28 B. Government Approvals B. Government Approvals, Funding, or Sponsorship. (“Funding” includes grants, loans, tax relief, and any other forms of financial assistance.) See EAF Addendum for a preliminary list of Federal, State, and local agencies. Government Entity If Yes: Identify Agency and Approval(s) Application Date Required (Actual or projected) a. City Counsel, Town Board, ✔ 9 Yes 9 No Abandonment of Town road (Burnet Road) TBD or Village Board of Trustees b. City, Town or Village 9 Yes 9 No ✔ Town of Clay Planning Board, Site Plan TBD Planning Board or Commission Town of Cicero Planning Board, Subdivision c. City, Town or ✔

9 Yes 9 No Town of Clay ZBA, Zoning Variances (potential) TBD

Village Zoning Board of Appeals d. Other local agencies 9 Yes 9 No ✔ Coordination with County water, sewer; & 239-nn referral to Town of Cicero e. County agencies 9 Yes 9 No ✔ Onondaga County IDA funding; 239-m review; & Sale of County property to Micron f. Regional agencies 9 Yes ✔ 9 No B. Government Approvals B. Government Approvals, Funding, or Sponsorship. (“Funding” includes grants, loans, tax relief, and any other forms of financial assistance.) See EAF Addendum for a preliminary list of Federal, State, and local agencies. Government Entity If Yes: Identify Agency and Approval(s) Application Date Required (Actual or projected) a. City Counsel, Town Board, ✔ 9 Yes 9 No Abandonment of Town road (Burnet Road) TBD or Village Board of Trustees b. City, Town or Village 9 Yes 9 No ✔ Town of Clay Planning Board, Site Plan TBD Planning Board or Commission Town of Cicero Planning Board, Subdivision c. City, Town or ✔

9 Yes 9 No Town of Clay ZBA, Zoning Variances (potential) TBD

Village Zoning Board of Appeals d. Other local agencies 9 Yes 9 No ✔ Coordination with County water, sewer; & 239-nn referral to Town of Cicero e. County agencies 9 Yes 9 No ✔ Onondaga County IDA funding; 239-m review; & Sale of County property to Micron f. Regional agencies 9 Yes ✔ 9 No g. State agencies ✔

9 Yes 9 No NYSDEC: Air Permit, T&E, Freshwater Wetland, TBD

401 WQC, SPDES; NYSDOT: HWP

h. Federal agencies 9 Yes 9 No ✔ USACE: Section 404 TBD i. Coastal Resources.

i. Is the project site within a Coastal Area, or the waterfront area of a Designated Inland Waterway? 9 Yes ✔ 9 No ii. Is the project site located in a community with an approved Local Waterfront Revitalization Program? ✔

9 Yes 9 No

iii. Is the project site within a Coastal Erosion Hazard Area? 9 Yes ✔ 9 No C. Planning and Zoning g. State agencies ✔

9 Yes 9 No NYSDEC: Air Permit, T&E, Freshwater Wetland, TBD

401 WQC, SPDES; NYSDOT: HWP

h. Federal agencies 9 Yes 9 No ✔ USACE: Section 404 TBD i. Coastal Resources.

i. Is the project site within a Coastal Area, or the waterfront area of a Designated Inland Waterway? 9 Yes ✔ 9 No ii. Is the project site located in a community with an approved Local Waterfront Revitalization Program? ✔

9 Yes 9 No

iii. Is the project site within a Coastal Erosion Hazard Area? 9 Yes ✔ 9 No C. Planning and Zoning C.1. Planning and zoning actions.

Will administrative or legislative adoption, or amendment of a plan, local law, ordinance, rule or regulation be the 9 Yes ✔ 9 No only approval(s) which must be granted to enable the proposed action to proceed?

• If Yes, complete sections C, F and G.

• If No, proceed to question C.2 and complete all remaining sections and questions in Part 1 C.2. Adopted land use plans.

a. Do any municipally- adopted (city, town, village or county) comprehensive land use plan(s) include the site ✔

9 Yes 9 No

where the proposed action would be located?

If Yes, does the comprehensive plan include specific recommendations for the site where the proposed action 9 Yes 9 No ✔ would be located?

b. Is the site of the proposed action within any local or regional special planning district (for example: Greenway; 9 Yes 9 No ✔ Brownfield Opportunity Area (BOA); designated State or Federal heritage area; watershed management plan; or other?) If Yes, identify the plan(s):

_______________________________________________________________________________________________________ Erie Canalway National Heritage Corridor Preservation and Management Plan ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ C.1. Planning and zoning actions.

Will administrative or legislative adoption, or amendment of a plan, local law, ordinance, rule or regulation be the 9 Yes ✔ 9 No only approval(s) which must be granted to enable the proposed action to proceed?

• If Yes, complete sections C, F and G.

• If No, proceed to question C.2 and complete all remaining sections and questions in Part 1 C.2. Adopted land use plans.

a. Do any municipally- adopted (city, town, village or county) comprehensive land use plan(s) include the site ✔

9 Yes 9 No

where the proposed action would be located?

If Yes, does the comprehensive plan include specific recommendations for the site where the proposed action 9 Yes 9 No ✔ would be located?

b. Is the site of the proposed action within any local or regional special planning district (for example: Greenway; 9 Yes 9 No ✔ Brownfield Opportunity Area (BOA); designated State or Federal heritage area; watershed management plan; or other?) If Yes, identify the plan(s):

_______________________________________________________________________________________________________ Erie Canalway National Heritage Corridor Preservation and Management Plan ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ c. Is the proposed action located wholly or partially within an area listed in an adopted municipal open space plan, 9 Yes ✔ 9 No or an adopted municipal farmland protection plan?

If Yes, identify the plan(s):

________________________________________________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ Page29 C.3. Zoning a. Is the site of the proposed action located in a municipality with an adopted zoning law or ordinance. ✔9 Yes 9 No If Yes, what is the zoning classification(s) including any applicable overlay district?

_________________________________________________________________________________________________________ The project site is a mix of I-2, RA, and RA-15 zoning districts. The land owner, OCIDA, has submitted a zone change petition to the Town of Clay Town Board to rezone its properties to I-2.

_________________________________________________________________________________________________________ c. Is the proposed action located wholly or partially within an area listed in an adopted municipal open space plan, 9 Yes ✔ 9 No or an adopted municipal farmland protection plan?

If Yes, identify the plan(s):

________________________________________________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ Page29 C.3. Zoning a. Is the site of the proposed action located in a municipality with an adopted zoning law or ordinance. ✔9 Yes 9 No If Yes, what is the zoning classification(s) including any applicable overlay district?

_________________________________________________________________________________________________________ The project site is a mix of I-2, RA, and RA-15 zoning districts. The land owner, OCIDA, has submitted a zone change petition to the Town of Clay Town Board to rezone its properties to I-2.

_________________________________________________________________________________________________________ b. Is the use permitted or allowed by a special or conditional use permit? ✔

9 Yes 9 No

c. Is a zoning change requested as part of the proposed action? 9 Yes ✔ 9 No If Yes, i. What is the proposed new zoning for the site? ___________________________________________________________________ C.4. Existing community services.

a. In what school district is the project site located? ________________________________________________________________ North Syracuse Central School District b. What police or other public protection forces serve the project site?

_________________________________________________________________________________________________________ Onondaga County Sheriff's Department, Town of Cicero Police Department b. Is the use permitted or allowed by a special or conditional use permit? ✔

9 Yes 9 No

c. Is a zoning change requested as part of the proposed action? 9 Yes ✔ 9 No If Yes, i. What is the proposed new zoning for the site? ___________________________________________________________________ C.4. Existing community services.

a. In what school district is the project site located? ________________________________________________________________ North Syracuse Central School District b. What police or other public protection forces serve the project site?

_________________________________________________________________________________________________________ Onondaga County Sheriff's Department, Town of Cicero Police Department c. Which fire protection and emergency medical services serve the project site? Town of Cicero Fire Department, __________________________________________________________________________________________________________ Clay Volunteer Fire Dept (VFD), Meyers Corner FD, Brewerton Fire District, North Syracuse FD, Caughdenoy VFD, Emergency Medical-NAVAC & NOVA d. What parks serve the project site?

__________________________________________________________________________________________________________ Two Town of Clay parks are located within one mile of the project site: Meltzer Park and the Clay Historical Park. __________________________________________________________________________________________________________ D. Project Details See EAF Addendum for additional description of the Proposed Project. D.1. Proposed and Potential Development c. Which fire protection and emergency medical services serve the project site? Town of Cicero Fire Department, __________________________________________________________________________________________________________ Clay Volunteer Fire Dept (VFD), Meyers Corner FD, Brewerton Fire District, North Syracuse FD, Caughdenoy VFD, Emergency Medical-NAVAC & NOVA d. What parks serve the project site?

__________________________________________________________________________________________________________ Two Town of Clay parks are located within one mile of the project site: Meltzer Park and the Clay Historical Park. __________________________________________________________________________________________________________ D. Project Details See EAF Addendum for additional description of the Proposed Project. D.1. Proposed and Potential Development a. What is the general nature of the proposed action (e.g., residential, industrial, commercial, recreational; if mixed, include all components)? Industrial semiconductor manufacturing facilities.

______________________________________________________________________________________________________ b. a. Total acreage of the site of the proposed action? _____________ ±1,253 acres b. Total acreage to be physically disturbed? _____________ ±595 acres c. Total acreage (project site and any contiguous properties) owned or controlled by the applicant or project sponsor? _____________ ±1,253 acres a. What is the general nature of the proposed action (e.g., residential, industrial, commercial, recreational; if mixed, include all components)? Industrial semiconductor manufacturing facilities.

______________________________________________________________________________________________________ b. a. Total acreage of the site of the proposed action? _____________ ±1,253 acres b. Total acreage to be physically disturbed? _____________ ±595 acres c. Total acreage (project site and any contiguous properties) owned or controlled by the applicant or project sponsor? _____________ ±1,253 acres c. Is the proposed action an expansion of an existing project or use? Yes 9✔No i. If Yes, what is the approximate percentage of the proposed expansion and identify the units (e.g., acres, miles, housing units, square feet)? % ____________________ Units: ____________________ d. Is the proposed action a subdivision, or does it include a subdivision? 9 Yes 9 No ✔ If Yes, i. Purpose or type of subdivision? (e.g., residential, industrial, commercial; if mixed, specify types) ________________________________________________________________________________________________________ Multiple residential and vacant parcels to be combined into one industrial parcel. ii. Is a cluster/conservation layout proposed? 9 Yes ✔ 9 No iii. Number of lots proposed? ________ N/A iv. Minimum and maximum proposed lot sizes? Minimum __________ N/A Maximum __________ N/A e. Will the proposed action be constructed in multiple phases? ✔9 Yes 9 No i. If No, anticipated period of construction: _____ months ii. If Yes:

• Total number of phases anticipated _____ 2 • Anticipated commencement date of phase 1 (including demolition) _____ month _____ Nov 2024 year • Anticipated completion date of final phase _____ Dec month _____year

2043

• Generally describe connections or relationships among phases, including any contingencies where progress of one phase may determine timing or duration of future phases: _______________________________________________________________ ____________________________________________________________________________________________________ Phase 1 is construction of FAB 1 and FAB 2 and associated buildings and on-site and off-site infrastructure. Phase 2 is construction of FAB 3 and FAB 4 and associated buildings and site infrastructure.

____________________________________________________________________________________________________ c. Is the proposed action an expansion of an existing project or use? Yes 9✔No i. If Yes, what is the approximate percentage of the proposed expansion and identify the units (e.g., acres, miles, housing units, square feet)? % ____________________ Units: ____________________ d. Is the proposed action a subdivision, or does it include a subdivision? 9 Yes 9 No ✔ If Yes, i. Purpose or type of subdivision? (e.g., residential, industrial, commercial; if mixed, specify types) ________________________________________________________________________________________________________ Multiple residential and vacant parcels to be combined into one industrial parcel. ii. Is a cluster/conservation layout proposed? 9 Yes ✔ 9 No iii. Number of lots proposed? ________ N/A iv. Minimum and maximum proposed lot sizes? Minimum __________ N/A Maximum __________ N/A e. Will the proposed action be constructed in multiple phases? ✔9 Yes 9 No i. If No, anticipated period of construction: _____ months ii. If Yes:

• Total number of phases anticipated _____ 2 • Anticipated commencement date of phase 1 (including demolition) _____ month _____ Nov 2024 year • Anticipated completion date of final phase _____ Dec month _____year

2043

• Generally describe connections or relationships among phases, including any contingencies where progress of one phase may determine timing or duration of future phases: _______________________________________________________________ ____________________________________________________________________________________________________ Phase 1 is construction of FAB 1 and FAB 2 and associated buildings and on-site and off-site infrastructure. Phase 2 is construction of FAB 3 and FAB 4 and associated buildings and site infrastructure.

____________________________________________________________________________________________________ Page30 f. Does the project include new residential uses? 9 Yes ✔ 9 No If Yes, show numbers of units proposed.

One Family Two Family Three Family Multiple Family (four or more) Initial Phase ___________ ___________ ____________ ________________________ At completion of all phases ___________ ___________ ____________ ________________________ Page30 f. Does the project include new residential uses? 9 Yes ✔ 9 No If Yes, show numbers of units proposed.

One Family Two Family Three Family Multiple Family (four or more) Initial Phase ___________ ___________ ____________ ________________________ At completion of all phases ___________ ___________ ____________ ________________________ g. Does the proposed action include new non-residential construction (including expansions)? 9 Yes 9 No ✔ If Yes, i. Total number of structures ___________ ±35 ii. Dimensions (in feet) of largest proposed structure: ________height;

±165' ________width;

±600' and _______ ±2,000' length iii. Approximate extent of building space to be heated or cooled: ______________________ ±8-10 million square feet h. Does the proposed action include construction or other activities that will result in the impoundment of any 9 Yes 9 No ✔ liquids, such as creation of a water supply, reservoir, pond, lake, waste lagoon or other storage? If Yes, i. Purpose of the impoundment: Industrial ________________________________________________________________________________ water supply storage proposed within tanks. No new surface water features other than stormwater. ii. If a water impoundment, the principal source of the water: 9 Ground water 9 Surface water streams ✔ 9 Other specify: _________________________________________________________________________________________________________ Stormwater iii. If other than water, identify the type of impounded/contained liquids and their source. _________________________________________________________________________________________________________ Industrial process chemicals to be contained within on-site storage tanks.

iv. Approximate size of the proposed impoundment. Volume: ____________ 4 tanks ea. 5-6 million gallons; surface area: ____________ TBD acres v. Dimensions of the proposed dam or impounding structure: ________ ±100-110' height; _______ ±100' length diameter vi. Construction method/materials for the proposed dam or impounding structure (e.g., earth fill, rock, wood, concrete): ________________________________________________________________________________________________________ TBD g. Does the proposed action include new non-residential construction (including expansions)? 9 Yes 9 No ✔ If Yes, i. Total number of structures ___________ ±35 ii. Dimensions (in feet) of largest proposed structure: ________height;

±165' ________width;

±600' and _______ ±2,000' length iii. Approximate extent of building space to be heated or cooled: ______________________ ±8-10 million square feet h. Does the proposed action include construction or other activities that will result in the impoundment of any 9 Yes 9 No ✔ liquids, such as creation of a water supply, reservoir, pond, lake, waste lagoon or other storage? If Yes, i. Purpose of the impoundment: Industrial ________________________________________________________________________________ water supply storage proposed within tanks. No new surface water features other than stormwater. ii. If a water impoundment, the principal source of the water: 9 Ground water 9 Surface water streams ✔ 9 Other specify: _________________________________________________________________________________________________________ Stormwater iii. If other than water, identify the type of impounded/contained liquids and their source. _________________________________________________________________________________________________________ Industrial process chemicals to be contained within on-site storage tanks.

iv. Approximate size of the proposed impoundment. Volume: ____________ 4 tanks ea. 5-6 million gallons; surface area: ____________ TBD acres v. Dimensions of the proposed dam or impounding structure: ________ ±100-110' height; _______ ±100' length diameter vi. Construction method/materials for the proposed dam or impounding structure (e.g., earth fill, rock, wood, concrete): ________________________________________________________________________________________________________ TBD D.2. Project Operations a. Does the proposed action include any excavation, mining, or dredging, during construction, operations, or both? 9 Yes ✔ 9 No (Not including general site preparation, grading or installation of utilities or foundations where all excavated materials will remain onsite) If Yes:

i .What is the purpose of the excavation or dredging? _______________________________________________________________ ii. How much material (including rock, earth, sediments, etc.) is proposed to be removed from the site? • Volume (specify tons or cubic yards): ____________________________________________ • Over what duration of time? ____________________________________________________ iii. Describe nature and characteristics of materials to be excavated or dredged, and plans to use, manage or dispose of them. ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ iv. Will there be onsite dewatering or processing of excavated materials? 9 Yes 9 No If yes, describe. ___________________________________________________________________________________________ ________________________________________________________________________________________________________ v. What is the total area to be dredged or excavated? _____________________________________acres vi. What is the maximum area to be worked at any one time? _______________________________ acres vii. What would be the maximum depth of excavation or dredging? __________________________ feet viii. Will the excavation require blasting? 9 Yes 9 No ix. Summarize site reclamation goals and plan: _____________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ D.2. Project Operations a. Does the proposed action include any excavation, mining, or dredging, during construction, operations, or both? 9 Yes ✔ 9 No (Not including general site preparation, grading or installation of utilities or foundations where all excavated materials will remain onsite) If Yes:

i .What is the purpose of the excavation or dredging? _______________________________________________________________ ii. How much material (including rock, earth, sediments, etc.) is proposed to be removed from the site? • Volume (specify tons or cubic yards): ____________________________________________ • Over what duration of time? ____________________________________________________ iii. Describe nature and characteristics of materials to be excavated or dredged, and plans to use, manage or dispose of them. ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ iv. Will there be onsite dewatering or processing of excavated materials? 9 Yes 9 No If yes, describe. ___________________________________________________________________________________________ ________________________________________________________________________________________________________ v. What is the total area to be dredged or excavated? _____________________________________acres vi. What is the maximum area to be worked at any one time? _______________________________ acres vii. What would be the maximum depth of excavation or dredging? __________________________ feet viii. Will the excavation require blasting? 9 Yes 9 No ix. Summarize site reclamation goals and plan: _____________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ b. Would the proposed action cause or result in alteration of, increase or decrease in size of, or encroachment 9 Yes 9 No ✔ into any existing wetland, waterbody, shoreline, beach or adjacent area?

If Yes:

i. Identify the wetland or waterbody which would be affected (by name, water index number, wetland map number or geographic description): Potentially ______________________________________________________________________________________________ NYSDEC Class C Stream No. 899-10 (Tributaries of Oneida River); NYSDEC Wetlands BRE-11 & BRE-14; and on-site Waters of the United States _________________________________________________________________________________________________________ Page31 b. Would the proposed action cause or result in alteration of, increase or decrease in size of, or encroachment 9 Yes 9 No ✔ into any existing wetland, waterbody, shoreline, beach or adjacent area?

If Yes:

i. Identify the wetland or waterbody which would be affected (by name, water index number, wetland map number or geographic description): Potentially ______________________________________________________________________________________________ NYSDEC Class C Stream No. 899-10 (Tributaries of Oneida River); NYSDEC Wetlands BRE-11 & BRE-14; and on-site Waters of the United States _________________________________________________________________________________________________________ Page31 ii. Describe how the proposed action would affect that waterbody or wetland, e.g. excavation, fill, placement of structures, or alteration of channels, banks and shorelines. Indicate extent of activities, alterations and additions in square feet or acres: _________________________________________________________________________________________________________ Specific impacts will be determined by site plan development; potential impacts could include placement of fill or structures for outfall _________________________________________________________________________________________________________

locations. _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ iii. Will the proposed action cause or result in disturbance to bottom sediments? ✔ Yes 9 No If Yes, describe: __________________________________________________________________________________________ Extent of impacts to waterbodies and wetlands to be determined by additional studies. iv. Will the proposed action cause or result in the destruction or removal of aquatic vegetation? 9 Yes ✔ 9 No If Yes:

• acres of aquatic vegetation proposed to be removed: ___________________________________________________________ • expected acreage of aquatic vegetation remaining after project completion:________________________________________ • purpose of proposed removal (e.g. beach clearing, invasive species control, boat access): ____________________________ ____________________________________________________________________________________________________ • proposed method of plant removal: ________________________________________________________________________ • if chemical/herbicide treatment will be used, specify product(s): _________________________________________________ v. Describe any proposed reclamation/mitigation following disturbance: _________________________________________________ _________________________________________________________________________________________________________ To be determined based on final design plans.

ii. Describe how the proposed action would affect that waterbody or wetland, e.g. excavation, fill, placement of structures, or alteration of channels, banks and shorelines. Indicate extent of activities, alterations and additions in square feet or acres: _________________________________________________________________________________________________________ Specific impacts will be determined by site plan development; potential impacts could include placement of fill or structures for outfall _________________________________________________________________________________________________________

locations. _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ iii. Will the proposed action cause or result in disturbance to bottom sediments? ✔ Yes 9 No If Yes, describe: __________________________________________________________________________________________ Extent of impacts to waterbodies and wetlands to be determined by additional studies. iv. Will the proposed action cause or result in the destruction or removal of aquatic vegetation? 9 Yes ✔ 9 No If Yes:

• acres of aquatic vegetation proposed to be removed: ___________________________________________________________ • expected acreage of aquatic vegetation remaining after project completion:________________________________________ • purpose of proposed removal (e.g. beach clearing, invasive species control, boat access): ____________________________ ____________________________________________________________________________________________________ • proposed method of plant removal: ________________________________________________________________________ • if chemical/herbicide treatment will be used, specify product(s): _________________________________________________ v. Describe any proposed reclamation/mitigation following disturbance: _________________________________________________ _________________________________________________________________________________________________________ To be determined based on final design plans.

c. Will the proposed action use, or create a new demand for water? 9 Yes 9 No ✔ If Yes:

i. Total anticipated water usage/demand per day: __________________________ approx. 48 million gallons/day ii. Will the proposed action obtain water from an existing public water supply? 9 Yes 9 No ✔ If Yes:

• Name of district or service area: Town _________________________________________________________________________ of Clay UWD / Onondaga County Water Authority (line owned by Metropolitan Water Board) • Does the existing public water supply have capacity to serve the proposal? 9 Yes ✔9 No • Is the project site in the existing district? 9 Yes ✔9 No • Is expansion of the district needed? 9 Yes 9 No ✔ • Do existing lines serve the project site? 9 Yes 9 No ✔ iii. Will line extension within an existing district be necessary to supply the project? ✔

9 Yes 9 No

If Yes:

• Describe extensions or capacity expansions proposed to serve this project: ________________________________________ ____________________________________________________________________________________________________ Coordination with Onondaga County Water Authority has been initiated to determine extent to extensions/capacity expansions necessary. • Source(s) of supply for the district: ________________________________________________________________________ Lake Ontario iv. Is a new water supply district or service area proposed to be formed to serve the project site? 9 Yes ✔9 No If, Yes:

• Applicant/sponsor for new district: ________________________________________________________________________ • Date application submitted or anticipated: __________________________________________________________________ • Proposed source(s) of supply for new district: _______________________________________________________________ v. If a public water supply will not be used, describe plans to provide water supply for the project: ___________________________ _________________________________________________________________________________________________________ vi. If water supply will be from wells (public or private), what is the maximum pumping capacity: _______ gallons/minute. d. Will the proposed action generate liquid wastes? ✔9 Yes 9 No If Yes:

i. Total anticipated liquid waste generation per day: _______________ 8-20 million gallons/day ii. Nature of liquid wastes to be generated (e.g., sanitary wastewater, industrial; if combination, describe all components and approximate volumes or proportions of each): __________________________________________________________________ _________________________________________________________________________________________________________ Sanitary wastewater and industrial process wastewater. Nature and volume of liquid waste to be generated are to be determined. _________________________________________________________________________________________________________ iii. Will the proposed action use any existing public wastewater treatment facilities? ✔9 Yes 9 No If Yes:

• Oak Orchard Wastewater Treatment Plant Name of wastewater treatment plant to be used: _____________________________________________________________ • Name of district: Onondaga ______________________________________________________________________________________ County Consolidated Sewer District • Does the existing wastewater treatment plant have capacity to serve the project? 9 Yes ✔ 9 No • Is the project site in the existing district? 9 Yes ✔ 9 No • Is expansion of the district needed? ✔9 Yes 9 No c. Will the proposed action use, or create a new demand for water? 9 Yes 9 No ✔ If Yes:

i. Total anticipated water usage/demand per day: __________________________ approx. 48 million gallons/day ii. Will the proposed action obtain water from an existing public water supply? 9 Yes 9 No ✔ If Yes:

• Name of district or service area: Town _________________________________________________________________________ of Clay UWD / Onondaga County Water Authority (line owned by Metropolitan Water Board) • Does the existing public water supply have capacity to serve the proposal? 9 Yes ✔9 No • Is the project site in the existing district? 9 Yes ✔9 No • Is expansion of the district needed? 9 Yes 9 No ✔ • Do existing lines serve the project site? 9 Yes 9 No ✔ iii. Will line extension within an existing district be necessary to supply the project? ✔

9 Yes 9 No

If Yes:

• Describe extensions or capacity expansions proposed to serve this project: ________________________________________ ____________________________________________________________________________________________________ Coordination with Onondaga County Water Authority has been initiated to determine extent to extensions/capacity expansions necessary. • Source(s) of supply for the district: ________________________________________________________________________ Lake Ontario iv. Is a new water supply district or service area proposed to be formed to serve the project site? 9 Yes ✔9 No If, Yes:

• Applicant/sponsor for new district: ________________________________________________________________________ • Date application submitted or anticipated: __________________________________________________________________ • Proposed source(s) of supply for new district: _______________________________________________________________ v. If a public water supply will not be used, describe plans to provide water supply for the project: ___________________________ _________________________________________________________________________________________________________ vi. If water supply will be from wells (public or private), what is the maximum pumping capacity: _______ gallons/minute. d. Will the proposed action generate liquid wastes? ✔9 Yes 9 No If Yes:

i. Total anticipated liquid waste generation per day: _______________ 8-20 million gallons/day ii. Nature of liquid wastes to be generated (e.g., sanitary wastewater, industrial; if combination, describe all components and approximate volumes or proportions of each): __________________________________________________________________ _________________________________________________________________________________________________________ Sanitary wastewater and industrial process wastewater. Nature and volume of liquid waste to be generated are to be determined. _________________________________________________________________________________________________________ iii. Will the proposed action use any existing public wastewater treatment facilities? ✔9 Yes 9 No If Yes:

• Oak Orchard Wastewater Treatment Plant Name of wastewater treatment plant to be used: _____________________________________________________________ • Name of district: Onondaga ______________________________________________________________________________________ County Consolidated Sewer District • Does the existing wastewater treatment plant have capacity to serve the project? 9 Yes ✔ 9 No • Is the project site in the existing district? 9 Yes ✔ 9 No • Is expansion of the district needed? ✔9 Yes 9 No Page32 • Do existing sewer lines serve the project site? 9 Yes ✔ 9 No • Will a line extension within an existing district be necessary to serve the project? 9 Yes 9 No ✔ If Yes:

• Describe extensions or capacity expansions proposed to serve this project: ____________________________________ Installation ____________________________________________________________________________________________________ of new wastewater forcemains and pumping stations. Necessary improvements to the existing Oak Orchard Wastewater Treatment Plant to accommodate the project are being evaluated.

____________________________________________________________________________________________________ iv. Will a new wastewater (sewage) treatment district be formed to serve the project site? 9 Yes 9 No ✔ If Yes:

• Applicant/sponsor for new district: OCIDA ____________________________________________________________________ • Date application submitted or anticipated: TBD _______________________________________________________________ • What is the receiving water for the wastewater discharge? Oneida __________________________________________________ River v. If public facilities will not be used, describe plans to provide wastewater treatment for the project, including specifying proposed receiving water (name and classification if surface discharge or describe subsurface disposal plans): ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ vi. Describe any plans or designs to capture, recycle or reuse liquid waste: _______________________________________________ ________________________________________________________________________________________________________ Micron will include on-site infrastructure to allow for reuse of industrial process water. Micron plans to explore capture of rainwater for gray ________________________________________________________________________________________________________ water use.

Page32 • Do existing sewer lines serve the project site? 9 Yes ✔ 9 No • Will a line extension within an existing district be necessary to serve the project? 9 Yes 9 No ✔ If Yes:

• Describe extensions or capacity expansions proposed to serve this project: ____________________________________ Installation ____________________________________________________________________________________________________ of new wastewater forcemains and pumping stations. Necessary improvements to the existing Oak Orchard Wastewater Treatment Plant to accommodate the project are being evaluated.

____________________________________________________________________________________________________ iv. Will a new wastewater (sewage) treatment district be formed to serve the project site? 9 Yes 9 No ✔ If Yes:

• Applicant/sponsor for new district: OCIDA ____________________________________________________________________ • Date application submitted or anticipated: TBD _______________________________________________________________ • What is the receiving water for the wastewater discharge? Oneida __________________________________________________ River v. If public facilities will not be used, describe plans to provide wastewater treatment for the project, including specifying proposed receiving water (name and classification if surface discharge or describe subsurface disposal plans): ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ vi. Describe any plans or designs to capture, recycle or reuse liquid waste: _______________________________________________ ________________________________________________________________________________________________________ Micron will include on-site infrastructure to allow for reuse of industrial process water. Micron plans to explore capture of rainwater for gray ________________________________________________________________________________________________________ water use.

e. Will the proposed action disturb more than one acre and create stormwater runoff, either from new point 9 Yes 9 No ✔ sources (i.e. ditches, pipes, swales, curbs, gutters or other concentrated flows of stormwater) or non-point source (i.e. sheet flow) during construction or post construction?

If Yes:

i. How much impervious surface will the project create in relation to total size of project parcel? _____ Square feet or _____ ±195 acres (impervious surface) _____ Square feet or _____ 1,253 acres (parcel size) ii. Describe types of new point sources. __________________________________________________________________________ Ditches, pipes, curbs, gutters, detention pond outfalls, etc. _________________________________________________________________________________________________________ iii. Where will the stormwater runoff be directed (i.e. on-site stormwater management facility/structures, adjacent properties, groundwater, on-site surface water or off-site surface waters)?

________________________________________________________________________________________________________ On-site stormwater management facility and/or offsite discharge to tributaries of Oneida River. ________________________________________________________________________________________________________ • If to surface waters, identify receiving water bodies or wetlands: ________________________________________________ ____________________________________________________________________________________________________ Oneida River ____________________________________________________________________________________________________ • Will stormwater runoff flow to adjacent properties? 9 Yes ✔9 No iv. Does the proposed plan minimize impervious surfaces, use pervious materials or collect and re-use stormwater? 9 Yes ✔ 9 No f. Does the proposed action include, or will it use on-site, one or more sources of air emissions, including fuel 9 Yes 9 No ✔ combustion, waste incineration, or other processes or operations?

If Yes, identify:

i. Mobile sources during project operations (e.g., heavy equipment, fleet or delivery vehicles) _________________________________________________________________________________________________________ Delivery and employee vehicles.

ii. Stationary sources during construction (e.g., power generation, structural heating, batch plant, crushers) ________________________________________________________________________________________________________ Potentially power generation.

iii. Stationary sources during operations (e.g., process emissions, large boilers, electric generation) ________________________________________________________________________________________________________ Process emissions.

g. Will any air emission sources named in D.2.f (above), require a NY State Air Registration, Air Facility Permit, 9 Yes 9 No ✔ or Federal Clean Air Act Title IV or Title V Permit?

If Yes: Micron is coordinating with NYSDEC to quantify air emissions in support of a Title V permit. i. Is the project site located in an Air quality non-attainment area? (Area routinely or periodically fails to meet 9 Yes ✔ 9 No ambient air quality standards for all or some parts of the year) ii. In addition to emissions as calculated in the application, the project will generate:

• ___________Tons/year TBD (short tons) of Carbon Dioxide (CO2) • ___________Tons/year TBD (short tons) of Nitrous Oxide (N2O) • ___________Tons/year TBD (short tons) of Perfluorocarbons (PFCs) • ___________Tons/year TBD (short tons) of Sulfur Hexafluoride (SF6) • ___________Tons/year TBD (short tons) of Carbon Dioxide equivalent of Hydroflourocarbons (HFCs) • ___________Tons/year TBD (short tons) of Hazardous Air Pollutants (HAPs) e. Will the proposed action disturb more than one acre and create stormwater runoff, either from new point 9 Yes 9 No ✔ sources (i.e. ditches, pipes, swales, curbs, gutters or other concentrated flows of stormwater) or non-point source (i.e. sheet flow) during construction or post construction?

If Yes:

i. How much impervious surface will the project create in relation to total size of project parcel? _____ Square feet or _____ ±195 acres (impervious surface) _____ Square feet or _____ 1,253 acres (parcel size) ii. Describe types of new point sources. __________________________________________________________________________ Ditches, pipes, curbs, gutters, detention pond outfalls, etc. _________________________________________________________________________________________________________ iii. Where will the stormwater runoff be directed (i.e. on-site stormwater management facility/structures, adjacent properties, groundwater, on-site surface water or off-site surface waters)?

________________________________________________________________________________________________________ On-site stormwater management facility and/or offsite discharge to tributaries of Oneida River. ________________________________________________________________________________________________________ • If to surface waters, identify receiving water bodies or wetlands: ________________________________________________ ____________________________________________________________________________________________________ Oneida River ____________________________________________________________________________________________________ • Will stormwater runoff flow to adjacent properties? 9 Yes ✔9 No iv. Does the proposed plan minimize impervious surfaces, use pervious materials or collect and re-use stormwater? 9 Yes ✔ 9 No f. Does the proposed action include, or will it use on-site, one or more sources of air emissions, including fuel 9 Yes 9 No ✔ combustion, waste incineration, or other processes or operations?

If Yes, identify:

i. Mobile sources during project operations (e.g., heavy equipment, fleet or delivery vehicles) _________________________________________________________________________________________________________ Delivery and employee vehicles.

ii. Stationary sources during construction (e.g., power generation, structural heating, batch plant, crushers) ________________________________________________________________________________________________________ Potentially power generation.

iii. Stationary sources during operations (e.g., process emissions, large boilers, electric generation) ________________________________________________________________________________________________________ Process emissions.

g. Will any air emission sources named in D.2.f (above), require a NY State Air Registration, Air Facility Permit, 9 Yes 9 No ✔ or Federal Clean Air Act Title IV or Title V Permit?

If Yes: Micron is coordinating with NYSDEC to quantify air emissions in support of a Title V permit. i. Is the project site located in an Air quality non-attainment area? (Area routinely or periodically fails to meet 9 Yes ✔ 9 No ambient air quality standards for all or some parts of the year) ii. In addition to emissions as calculated in the application, the project will generate:

• ___________Tons/year TBD (short tons) of Carbon Dioxide (CO2) • ___________Tons/year TBD (short tons) of Nitrous Oxide (N2O) • ___________Tons/year TBD (short tons) of Perfluorocarbons (PFCs) • ___________Tons/year TBD (short tons) of Sulfur Hexafluoride (SF6) • ___________Tons/year TBD (short tons) of Carbon Dioxide equivalent of Hydroflourocarbons (HFCs) • ___________Tons/year TBD (short tons) of Hazardous Air Pollutants (HAPs) Page33 h. Will the proposed action generate or emit methane (including, but not limited to, sewage treatment plants, ✔

9 Yes 9 No

landfills, composting facilities)?

If Yes:

i. Estimate methane generation in tons/year (metric): TBD ________________________________________________________________ ii. Describe any methane capture, control or elimination measures included in project design (e.g., combustion to generate heat or electricity, flaring):Limited ________________________________________________________________________________________ methane use on site to power air pollution control equipment to meet air quality standards. Amounts of methane will depend on final design of air pollution control equipment and influent stream composition. _________________________________________________________________________________________________________ i. Will the proposed action result in the release of air pollutants from open-air operations or processes, such as 9 Yes ✔ 9 No quarry or landfill operations?

If Yes: Describe operations and nature of emissions (e.g., diesel exhaust, rock particulates/dust): _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ Page33 h. Will the proposed action generate or emit methane (including, but not limited to, sewage treatment plants, ✔

9 Yes 9 No

landfills, composting facilities)?

If Yes:

i. Estimate methane generation in tons/year (metric): TBD ________________________________________________________________ ii. Describe any methane capture, control or elimination measures included in project design (e.g., combustion to generate heat or electricity, flaring):Limited ________________________________________________________________________________________ methane use on site to power air pollution control equipment to meet air quality standards. Amounts of methane will depend on final design of air pollution control equipment and influent stream composition. _________________________________________________________________________________________________________ i. Will the proposed action result in the release of air pollutants from open-air operations or processes, such as 9 Yes ✔ 9 No quarry or landfill operations?

If Yes: Describe operations and nature of emissions (e.g., diesel exhaust, rock particulates/dust): _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ j. Will the proposed action result in a substantial increase in traffic above present levels or generate substantial 9 Yes 9 No ✔ new demand for transportation facilities or services?

If Yes: Micron is coordinating with NYSDOT on a comprehensive traffic impact study.

i. When is the peak traffic expected (Check all that apply): † ✔ Morning † Evening ✔ †Weekend ✔ † Randomly between hours of __________ to ________.

ii. For commercial activities only, projected number of truck trips/day and type (e.g., semi trailers and dump trucks): _____________ ________________________________________________________________________________________________________ 10 to 30 trucks/peak hour (approx. 2-5% of vehicle trips/hr for 870,000 SF logistics, warehousing, and/or shipping & receiving space) j. Will the proposed action result in a substantial increase in traffic above present levels or generate substantial 9 Yes 9 No ✔ new demand for transportation facilities or services?

If Yes: Micron is coordinating with NYSDOT on a comprehensive traffic impact study.

i. When is the peak traffic expected (Check all that apply): † ✔ Morning † Evening ✔ †Weekend ✔ † Randomly between hours of __________ to ________.

ii. For commercial activities only, projected number of truck trips/day and type (e.g., semi trailers and dump trucks): _____________ ________________________________________________________________________________________________________ 10 to 30 trucks/peak hour (approx. 2-5% of vehicle trips/hr for 870,000 SF logistics, warehousing, and/or shipping & receiving space) iii. Parking spaces: Existing ___________________

0 Proposed ___________

+/-12,000 Net increase/decrease _____________________ +/-12,000 iv. Does the proposed action include any shared use parking? Yes ✔ No v. If the proposed action includes any modification of existing roads, creation of new roads or change in existing access, describe: ________________________________________________________________________________________________________ Caughdenoy Road/NYS Route 31 improvements; site driveways on NYS Route 31; signal timing adjustments vi. Are public/private transportation service(s) or facilities available within ½ mile of the proposed site? 9 Yes ✔9 No vii Will the proposed action include access to public transportation or accommodations for use of hybrid, electric 9 Yes 9 No ✔ or other alternative fueled vehicles?

viii. Will the proposed action include plans for pedestrian or bicycle accommodations for connections to existing 9 Yes ✔9 No pedestrian or bicycle routes?

iii. Parking spaces: Existing ___________________

0 Proposed ___________

+/-12,000 Net increase/decrease _____________________ +/-12,000 iv. Does the proposed action include any shared use parking? Yes ✔ No v. If the proposed action includes any modification of existing roads, creation of new roads or change in existing access, describe: ________________________________________________________________________________________________________ Caughdenoy Road/NYS Route 31 improvements; site driveways on NYS Route 31; signal timing adjustments vi. Are public/private transportation service(s) or facilities available within ½ mile of the proposed site? 9 Yes ✔9 No vii Will the proposed action include access to public transportation or accommodations for use of hybrid, electric 9 Yes 9 No ✔ or other alternative fueled vehicles?

viii. Will the proposed action include plans for pedestrian or bicycle accommodations for connections to existing 9 Yes ✔9 No pedestrian or bicycle routes?

k. Will the proposed action (for commercial or industrial projects only) generate new or additional demand 9 Yes 9 No ✔ for energy?

If Yes:

i. Estimate annual electricity demand during operation of the proposed action: ____________________________________________ _________________________________________________________________________________________________________ 7.15 billion kWh/year for Phase 1; 16.17 billion kWh/year for Phase 2 ii. Anticipated sources/suppliers of electricity for the project (e.g., on-site combustion, on-site renewable, via grid/local utility, or other):

________________________________________________________________________________________________________ National Grid iii. Will the proposed action require a new, or an upgrade, to an existing substation? 9 Yes 9 No ✔ k. Will the proposed action (for commercial or industrial projects only) generate new or additional demand 9 Yes 9 No ✔ for energy?

If Yes:

i. Estimate annual electricity demand during operation of the proposed action: ____________________________________________ _________________________________________________________________________________________________________ 7.15 billion kWh/year for Phase 1; 16.17 billion kWh/year for Phase 2 ii. Anticipated sources/suppliers of electricity for the project (e.g., on-site combustion, on-site renewable, via grid/local utility, or other):

________________________________________________________________________________________________________ National Grid iii. Will the proposed action require a new, or an upgrade, to an existing substation? 9 Yes 9 No ✔ l. Hours of operation. Answer all items which apply.

i. During Construction: ii. During Operations: • Monday - Friday: _________________________ 7 AM - 7 PM • Monday - Friday: ____________________________ 24 hours/day • Saturday: ________________________________ 7 AM - 7 PM • Saturday: ___________________________________ 24 hours/day • Sunday: _________________________________ N/A • 24 hours/day Sunday: ____________________________________ • Holidays: ________________________________ N/A • 24 hours/day Holidays: ___________________________________ Page34 l. Hours of operation. Answer all items which apply.

i. During Construction: ii. During Operations: • Monday - Friday: _________________________ 7 AM - 7 PM • Monday - Friday: ____________________________ 24 hours/day • Saturday: ________________________________ 7 AM - 7 PM • Saturday: ___________________________________ 24 hours/day • Sunday: _________________________________ N/A • 24 hours/day Sunday: ____________________________________ • Holidays: ________________________________ N/A • 24 hours/day Holidays: ___________________________________ Page34 m. Will the proposed action produce noise that will exceed existing ambient noise levels during construction, ✔

9 Yes 9 No

operation, or both?

If yes:

i. Provide details including sources, time of day and duration:

_______________________________________________________________________________________________________ Noise generated from construction (M-F 7am-7pm) and site operations (24/7) are expected to contribute to sound levels. _______________________________________________________________________________________________________ ii. Will the proposed action remove existing natural barriers that could act as a noise barrier or screen? ✔

9 Yes 9 No

Describe: Tree _________________________________________________________________________________________________ removal within the site is proposed. Landscaping at the perimeter of the site is proposed. _________________________________________________________________________________________________________ n. Will the proposed action have outdoor lighting? ✔9 Yes 9 No If yes:

i. Describe source(s), location(s), height of fixture(s), direction/aim, and proximity to nearest occupied structures: Light _________________________________________________________________________________________________________ sources could include pole-mounted and/or building mounted. Luminaries which are dark-sky friendly, high-efficiency LED lights with cut off shields to provide uniform and energy conscious illumination to walkways and parking lots will be implemented to the greatest extent possible. _________________________________________________________________________________________________________ ii. Will proposed action remove existing natural barriers that could act as a light barrier or screen? ✔9 Yes 9 No Describe: _________________________________________________________________________________________________ Tree removal within the site is proposed. Landscaping at the perimeter of the site is proposed. _________________________________________________________________________________________________________ o. Does the proposed action have the potential to produce odors for more than one hour per day? 9 Yes ✔ 9 No If Yes, describe possible sources, potential frequency and duration of odor emissions, and proximity to nearest occupied structures: ______________________________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ m. Will the proposed action produce noise that will exceed existing ambient noise levels during construction, ✔

9 Yes 9 No

operation, or both?

If yes:

i. Provide details including sources, time of day and duration:

_______________________________________________________________________________________________________ Noise generated from construction (M-F 7am-7pm) and site operations (24/7) are expected to contribute to sound levels. _______________________________________________________________________________________________________ ii. Will the proposed action remove existing natural barriers that could act as a noise barrier or screen? ✔

9 Yes 9 No

Describe: Tree _________________________________________________________________________________________________ removal within the site is proposed. Landscaping at the perimeter of the site is proposed. _________________________________________________________________________________________________________ n. Will the proposed action have outdoor lighting? ✔9 Yes 9 No If yes:

i. Describe source(s), location(s), height of fixture(s), direction/aim, and proximity to nearest occupied structures: Light _________________________________________________________________________________________________________ sources could include pole-mounted and/or building mounted. Luminaries which are dark-sky friendly, high-efficiency LED lights with cut off shields to provide uniform and energy conscious illumination to walkways and parking lots will be implemented to the greatest extent possible. _________________________________________________________________________________________________________ ii. Will proposed action remove existing natural barriers that could act as a light barrier or screen? ✔9 Yes 9 No Describe: _________________________________________________________________________________________________ Tree removal within the site is proposed. Landscaping at the perimeter of the site is proposed. _________________________________________________________________________________________________________ o. Does the proposed action have the potential to produce odors for more than one hour per day? 9 Yes ✔ 9 No If Yes, describe possible sources, potential frequency and duration of odor emissions, and proximity to nearest occupied structures: ______________________________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ p. Will the proposed action include any bulk storage of petroleum (combined capacity of over 1,100 gallons) 9 Yes 9 No ✔ or chemical products 185 gallons in above ground storage or any amount in underground storage? If Yes:

i. Product(s) to be stored ______________________________________________________________________________________ Petroleum, miscellaneous chemicals needed to support manufacturing and research & development. ii. Volume(s) ______Varies per unit time ___________ (e.g., month, year) iii. Generally, describe the proposed storage facilities:________________________________________________________________ ________________________________________________________________________________________________________ Tanks and containers that are compliant with regulations. Secondary containment structures, as warranted. p. Will the proposed action include any bulk storage of petroleum (combined capacity of over 1,100 gallons) 9 Yes 9 No ✔ or chemical products 185 gallons in above ground storage or any amount in underground storage? If Yes:

i. Product(s) to be stored ______________________________________________________________________________________ Petroleum, miscellaneous chemicals needed to support manufacturing and research & development. ii. Volume(s) ______Varies per unit time ___________ (e.g., month, year) iii. Generally, describe the proposed storage facilities:________________________________________________________________ ________________________________________________________________________________________________________ Tanks and containers that are compliant with regulations. Secondary containment structures, as warranted. q. Will the proposed action (commercial, industrial and recreational projects only) use pesticides (i.e., herbicides, ✔ Yes 9 No 9 insecticides) during construction or operation?

If Yes:

i. Describe proposed treatment(s):

________________________________________________________________________________________________________ Limited use of herbicides and pesticides in landscaped areas following an Integrated Pest Management (IPM) plan. IPM may address methods for management of noxious, non-native, and/or invasive species during construction and over the life of the project. ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ ii. Will the proposed action use Integrated Pest Management Practices? 9 Yes 9 No ✔ r. Will the proposed action (commercial or industrial projects only) involve or require the management or disposal ✔ 9 Yes 9 No of solid waste (excluding hazardous materials)?

If Yes: Micron is coordinating with NYSDEC to identify potential waste streams. i. Describe any solid waste(s) to be generated during construction or operation of the facility: • Construction: ____________________ TBD tons per ________________ (unit of time) • Operation : ____________________ Prelim. est. of 45,000 tons per ________________ year (unit of time) ii. Describe any proposals for on-site minimization, recycling or reuse of materials to avoid disposal as solid waste: • Construction: On-site ________________________________________________________________________________________ waste minimization and off-site reuse/recycling will be conducted. Materials privately hauled to recycling facility. ____________________________________________________________________________________________________ • Operation: __________________________________________________________________________________________ On-site waste minimization through raw material usage and process optimization. Both on-site and off-site reuse and recycling will be conducted; materials privately hauled to recycling or reuse facility. ____________________________________________________________________________________________________ iii. Proposed disposal methods/facilities for solid waste generated on-site:

• Construction: TBD ________________________________________________________________________________________ ____________________________________________________________________________________________________ • Operation: __________________________________________________________________________________________ TBD ____________________________________________________________________________________________________ q. Will the proposed action (commercial, industrial and recreational projects only) use pesticides (i.e., herbicides, ✔ Yes 9 No 9 insecticides) during construction or operation?

If Yes:

i. Describe proposed treatment(s):

________________________________________________________________________________________________________ Limited use of herbicides and pesticides in landscaped areas following an Integrated Pest Management (IPM) plan. IPM may address methods for management of noxious, non-native, and/or invasive species during construction and over the life of the project. ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ ii. Will the proposed action use Integrated Pest Management Practices? 9 Yes 9 No ✔ r. Will the proposed action (commercial or industrial projects only) involve or require the management or disposal ✔ 9 Yes 9 No of solid waste (excluding hazardous materials)?

If Yes: Micron is coordinating with NYSDEC to identify potential waste streams. i. Describe any solid waste(s) to be generated during construction or operation of the facility: • Construction: ____________________ TBD tons per ________________ (unit of time) • Operation : ____________________ Prelim. est. of 45,000 tons per ________________ year (unit of time) ii. Describe any proposals for on-site minimization, recycling or reuse of materials to avoid disposal as solid waste: • Construction: On-site ________________________________________________________________________________________ waste minimization and off-site reuse/recycling will be conducted. Materials privately hauled to recycling facility. ____________________________________________________________________________________________________ • Operation: __________________________________________________________________________________________ On-site waste minimization through raw material usage and process optimization. Both on-site and off-site reuse and recycling will be conducted; materials privately hauled to recycling or reuse facility. ____________________________________________________________________________________________________ iii. Proposed disposal methods/facilities for solid waste generated on-site:

• Construction: TBD ________________________________________________________________________________________ ____________________________________________________________________________________________________ • Operation: __________________________________________________________________________________________ TBD ____________________________________________________________________________________________________