Public Records › OCIDA › Meeting

October 2023 — 10-12-23-OCIDA-Reg-Board-Mtg-materials.pdf

2024-05-06 · PDF · 43,856 words · collected 2026-08-07 Official copy↗ Archived PDF Plain text Mentions

Typeset from the PDF of the official document (read by OCR) — headings, motions and recorded votes are detected automatically, so spacing may differ from the original. The official copy governs.

Contents · 14 sections
  1. ONONDAGA COUNTY INDUSTRIAL DEVELOPMENT AGENCY
  2. 335 MONTGOMERY STREET FLOOR 2M, SYRACUSE, NY 13202
  3. PAYMENT OF BILLS
  4. CONFLICT OF INTEREST DISCLOSURE
  5. CAMILLUS MILLS REDEVELOPMENT COMPANY, INC./CAMILLUS MILLS PHASE II,
  6. LLC (3101-21-08A) MODIFICATION MEETING
  7. SYRACUSE HABITAT FOR HUMANITY PROPERTY DISPOSITION
  8. DESTINY USA REAL ESTATE, LLC (3101-14-01B)
  9. MICRON NEW YORK SEMICONDUCTOR MANUFACTURING LLC (3191023-07A)
  10. 335 MONTGOMERY STREET, 2ND FLOOR, SYRACUSE, NY 13202
  11. 101.1 WPCP GEIS
  12. LIABILITIES AND EQUITY
  13. GENERAL EXPENSES
  14. Section A. of EAF Narrative for detailed description and acreages)

ONONDAGA COUNTY INDUSTRIAL DEVELOPMENT AGENCY

335 MONTGOMERY STREET FLOOR 2M, SYRACUSE, NY 13202

1- PHONE: 315.435.3770 • FAX: 315.435.3669 • ONGOVED.COM Regular Meeting Agenda October 12, 2023 8:30 AM Call to Order Audit Committee 8:35 AM Call to Order Finance Committee 8:40 AM Call to Order the Regular Meeting of the Agency A. Approval of Minutes: September 14, 2023 B. Treasurer’s Report C. Payment of Bills D. Conflict of Interest Action Items:

1. OHB ReDev, Inc. / District East (3101-22-06A) Agency Action Requested:

a. A resolution of the Board designating OCIDA as lead agency with respect to a coordinated review and determining that the OHB ReDev, Inc. Project:

i. will not have a significant adverse effect on the environment;

ii. will not require the preparation of an Environmental Impact Statement; and iii. the Agency hereby issues a Negative Declaration pursuant to the state environmental quality review act.

Representative: Jeff Davis, OCIDA Legal Counsel, Barclay Damon LLP

ONONDAGA COUNTY INDUSTRIAL DEVELOPMENT AGENCY

335 MONTGOMERY STREET FLOOR 2M, SYRACUSE, NY 13202

1- PHONE: 315.435.3770 • FAX: 315.435.3669 • ONGOVED.COM Regular Meeting Agenda October 12, 2023 8:30 AM Call to Order Audit Committee 8:35 AM Call to Order Finance Committee 8:40 AM Call to Order the Regular Meeting of the Agency A. Approval of Minutes: September 14, 2023 B. Treasurer’s Report C. Payment of Bills D. Conflict of Interest Action Items:

1. OHB ReDev, Inc. / District East (3101-22-06A) Agency Action Requested:

a. A resolution of the Board designating OCIDA as lead agency with respect to a coordinated review and determining that the OHB ReDev, Inc. Project:

i. will not have a significant adverse effect on the environment;

ii. will not require the preparation of an Environmental Impact Statement; and iii. the Agency hereby issues a Negative Declaration pursuant to the state environmental quality review act.

Representative: Jeff Davis, OCIDA Legal Counsel, Barclay Damon LLP

2. OYA Camillus A LLC (3101-20-16C)

Agency Action Requested:

a. A resolution of the board authorizing the sale of the membership interest of the Company.

b. A resolution of the board authorizing an extension of the sales and use tax exemption. Representative: Amanda Fitzgerald, OCIDA Legal Counsel, Barclay Damon LLP

3. OYA Camillus B LLC ((3101-20-17D)

Agency Action Requested:

a. A resolution of the board authorizing the sale of the membership interest of the Company.

b. A resolution of the board authorizing an extension of the sales and use tax exemption. Representative: Amanda Fitzgerald, OCIDA Legal Counsel, Barclay Damon LLP Page11 Page

4. Review of Agency Budget for 2024

Agency Action Requested:

a. Approval of the Agency 2024 Budget Representative: Nate Stevens, Treasurer, OCIDA

5. Executive Session

Adjourn 2

DRAFT

Onondaga County Industrial Development Agency Regular Meeting Minutes September 14, 2023 A regular meeting of the Onondaga County Industrial Development Agency was held on Thursday, September 14, 2023, 355 Montgomery Street, Floor 2M, Syracuse, New York.

2. OYA Camillus A LLC (3101-20-16C)

Agency Action Requested:

a. A resolution of the board authorizing the sale of the membership interest of the Company.

b. A resolution of the board authorizing an extension of the sales and use tax exemption. Representative: Amanda Fitzgerald, OCIDA Legal Counsel, Barclay Damon LLP

3. OYA Camillus B LLC ((3101-20-17D)

Agency Action Requested:

a. A resolution of the board authorizing the sale of the membership interest of the Company.

b. A resolution of the board authorizing an extension of the sales and use tax exemption. Representative: Amanda Fitzgerald, OCIDA Legal Counsel, Barclay Damon LLP Page11 Page

4. Review of Agency Budget for 2024

Agency Action Requested:

a. Approval of the Agency 2024 Budget Representative: Nate Stevens, Treasurer, OCIDA

5. Executive Session

Adjourn 2

DRAFT

Onondaga County Industrial Development Agency Regular Meeting Minutes September 14, 2023 A regular meeting of the Onondaga County Industrial Development Agency was held on Thursday, September 14, 2023, 355 Montgomery Street, Floor 2M, Syracuse, New York.

Patrick Hogan called the meeting to order at 8:32 am with the following:

PRESENT:

Patrick Hogan Janice Herzog Fanny Villarreal Cydney Johnson Elizabeth Dreyfuss

ABSENT:

Susan Stanczyk Kevin Ryan

ALSO PRESENT:

Robert M. Petrovich, Executive Director Nancy Lowery, Secretary Nate Stevens, Treasurer Karen Doster, Recording Secretary Alexis Rodriguez, Assistant Treasurer Len Rauch, Economic Development Jeff Davis, Barclay Damon Law Firm Amanda Fitzgerald, Barclay Damon Law Firm Joe Nehme, Micron Temesgen Fissehaye, Micron John DeSantis, Onondaga County Legislature APPROVAL OF REGULAR MEETING MINUTES – AUGUST 20, 2023 Upon a motion by Janice Herzog, seconded by Fanny Villarreal, the OCIDA Board approved the regular meeting minutes of August 20, 2023. Fanny Villarreal abstained. Motion was carried. TREASURER’S REPORT Alexis Rodriguez gave a brief review of the Treasurer’s Report for the month of August 2023. Upon a motion by Janice Herzog, seconded by Fanny Villarreal, the OCIDA Board approved the Treasurer’s Report for the month of August 2023. Motion was carried.

Patrick Hogan called the meeting to order at 8:32 am with the following:

PRESENT:

Patrick Hogan Janice Herzog Fanny Villarreal Cydney Johnson Elizabeth Dreyfuss

ABSENT:

Susan Stanczyk Kevin Ryan

ALSO PRESENT:

Robert M. Petrovich, Executive Director Nancy Lowery, Secretary Nate Stevens, Treasurer Karen Doster, Recording Secretary Alexis Rodriguez, Assistant Treasurer Len Rauch, Economic Development Jeff Davis, Barclay Damon Law Firm Amanda Fitzgerald, Barclay Damon Law Firm Joe Nehme, Micron Temesgen Fissehaye, Micron John DeSantis, Onondaga County Legislature APPROVAL OF REGULAR MEETING MINUTES – AUGUST 20, 2023 Upon a motion by Janice Herzog, seconded by Fanny Villarreal, the OCIDA Board approved the regular meeting minutes of August 20, 2023. Fanny Villarreal abstained. Motion was carried. TREASURER’S REPORT Alexis Rodriguez gave a brief review of the Treasurer’s Report for the month of August 2023. Upon a motion by Janice Herzog, seconded by Fanny Villarreal, the OCIDA Board approved the Treasurer’s Report for the month of August 2023. Motion was carried.

PAYMENT OF BILLS

Alexis Rodriguez gave a brief review of the Payment of Bills Schedule #485.

Upon a motion by Janice Herzog, seconded by Fanny Villarreal, the OCIDA Board approved the Payment of Bills Schedule #485 for $351,953.46 with PILOT payments to City of Syracuse for $1,791.97, Onondaga County for $1,152.18, Town of Onondaga for $3.60, Town of DeWitt for $17.66, Jamesville-Dewitt Central School District for $115.58 and Baldwinsville Central School District for $1,529,954.00. Motion was carried.

PAYMENT OF BILLS

Alexis Rodriguez gave a brief review of the Payment of Bills Schedule #485.

Upon a motion by Janice Herzog, seconded by Fanny Villarreal, the OCIDA Board approved the Payment of Bills Schedule #485 for $351,953.46 with PILOT payments to City of Syracuse for $1,791.97, Onondaga County for $1,152.18, Town of Onondaga for $3.60, Town of DeWitt for $17.66, Jamesville-Dewitt Central School District for $115.58 and Baldwinsville Central School District for $1,529,954.00. Motion was carried.

CONFLICT OF INTEREST DISCLOSURE

The Conflict of Interest was circulated and there were no conflicts.

CAMILLUS MILLS REDEVELOPMENT COMPANY, INC./CAMILLUS MILLS PHASE II,

LLC (3101-21-08A) MODIFICATION MEETING

Amanda Fitzgerald stated this is an extension of their sales and use tax exemption. She stated the Camillus Mills project ran into a delay of about 8 months because they were correcting their FEMA mapping. She stated their sales and use tax exemption is scheduled to go through the end of the year and they have asked for an extension through the end of April 2024.

Robert Petrovich asked if it is an extension of time and not extension of benefits. Amanda Fitzgerald stated it is just an extension of time not benefits.

Upon a motion by Janice Herzog, seconded by Fanny Villarreal, the OCIDA Board approved a resolution authorizing an extension of Sales and Use Tax Exemption and project completion date for Camillus Mills Redevelopment Company, Inc./Camillus Mills Phase II, LLC. Motion was

carried.

CONFLICT OF INTEREST DISCLOSURE

The Conflict of Interest was circulated and there were no conflicts.

CAMILLUS MILLS REDEVELOPMENT COMPANY, INC./CAMILLUS MILLS PHASE II,

LLC (3101-21-08A) MODIFICATION MEETING

Amanda Fitzgerald stated this is an extension of their sales and use tax exemption. She stated the Camillus Mills project ran into a delay of about 8 months because they were correcting their FEMA mapping. She stated their sales and use tax exemption is scheduled to go through the end of the year and they have asked for an extension through the end of April 2024.

Robert Petrovich asked if it is an extension of time and not extension of benefits. Amanda Fitzgerald stated it is just an extension of time not benefits.

Upon a motion by Janice Herzog, seconded by Fanny Villarreal, the OCIDA Board approved a resolution authorizing an extension of Sales and Use Tax Exemption and project completion date for Camillus Mills Redevelopment Company, Inc./Camillus Mills Phase II, LLC. Motion was

carried.

SYRACUSE HABITAT FOR HUMANITY PROPERTY DISPOSITION

2 Sarah Bruce stated she is the Executive Director for the Syracuse Habitat for Humanity. She is extremely grateful for all the property OCIDA has already allowed them to deconstruct. She stated today they are looking for the addition of 8501 Burnett Road, which she believes was recently vacated, to add to the list of properties to deconstruct.

Upon a motion by Fanny Villarreal, seconded by Janice Herzog, the OCIDA Board approved a resolution authorizing disposition of property. Motion was carried.

SYRACUSE HABITAT FOR HUMANITY PROPERTY DISPOSITION

2 Sarah Bruce stated she is the Executive Director for the Syracuse Habitat for Humanity. She is extremely grateful for all the property OCIDA has already allowed them to deconstruct. She stated today they are looking for the addition of 8501 Burnett Road, which she believes was recently vacated, to add to the list of properties to deconstruct.

Upon a motion by Fanny Villarreal, seconded by Janice Herzog, the OCIDA Board approved a resolution authorizing disposition of property. Motion was carried.

DESTINY USA REAL ESTATE, LLC (3101-14-01B)

Amanda Fitzgerald stated Destiny USA has come to the board in connection with a project that closed in 2016 on Hiawatha Boulevard and the Agency had provided financial assistance. She stated the Agency is still in title as part of the straight lease transaction. She stated the Department of Transportation has appropriated a small piece of that property and offered compensation for that appropriation that is in connection with the I81 viaduct project. She stated the Company has asked that OCIDA release any right that they might have to that compensation. She stated any right the Agency might have is only in connection with the nominal interest we have with the straight lease transaction, so she thinks it is appropriate for the Board to authorize Mr. Petrovich to sign the documents. She stated there was a full review of the release and she feels it is a simple release just saying we are only nominally in title, and we really have no right or claim.

Patrick Hogan asked if this is the new hotel. Amanda Fitzgerald stated yes.

Patrick Hogan asked how much Destiny is getting for the property. Robert Petrovich stated $30,000.

DESTINY USA REAL ESTATE, LLC (3101-14-01B)

Amanda Fitzgerald stated Destiny USA has come to the board in connection with a project that closed in 2016 on Hiawatha Boulevard and the Agency had provided financial assistance. She stated the Agency is still in title as part of the straight lease transaction. She stated the Department of Transportation has appropriated a small piece of that property and offered compensation for that appropriation that is in connection with the I81 viaduct project. She stated the Company has asked that OCIDA release any right that they might have to that compensation. She stated any right the Agency might have is only in connection with the nominal interest we have with the straight lease transaction, so she thinks it is appropriate for the Board to authorize Mr. Petrovich to sign the documents. She stated there was a full review of the release and she feels it is a simple release just saying we are only nominally in title, and we really have no right or claim.

Patrick Hogan asked if this is the new hotel. Amanda Fitzgerald stated yes.

Patrick Hogan asked how much Destiny is getting for the property. Robert Petrovich stated $30,000.

Upon a motion by Janice Herzog, seconded by Fanny Villarreal, the OCIDA Board approved a resolution acknowledging an appropriation of a portion of a certain project on behalf of Destiny USA Real Estate, LLC by the Department of Transportation and authorizing the execution and delivery of an assignment of claim and release in connection therewith. Motion was carried. 3 ENGINEERING SERVICES – CONTRACT AUTHORIZATION Robert Petrovich stated this is an increase of $10,000 to the existing contract we have with Barton & Loguidice. He stated they have been working with us on the White Pine South or Caughdenoy Industrial Park which is a supply chain site we are developing in support of the Micron project. He stated this authorization is for additional services to work OCIDA along with WEP and OCWA to locate and appropriately size a pump station and conveyance line that needs to be installed to support sanitary sewer service to the White Pine site on behalf of Micron and for OCWA to be able to put in a couple of supply lines for water to the site. He stated this is an additional authorization to do the work on our behalf.

Upon a motion by Janice Herzog, seconded by Fanny Villarreal, the OCIDA Board approved a resolution acknowledging an appropriation of a portion of a certain project on behalf of Destiny USA Real Estate, LLC by the Department of Transportation and authorizing the execution and delivery of an assignment of claim and release in connection therewith. Motion was carried. 3 ENGINEERING SERVICES – CONTRACT AUTHORIZATION Robert Petrovich stated this is an increase of $10,000 to the existing contract we have with Barton & Loguidice. He stated they have been working with us on the White Pine South or Caughdenoy Industrial Park which is a supply chain site we are developing in support of the Micron project. He stated this authorization is for additional services to work OCIDA along with WEP and OCWA to locate and appropriately size a pump station and conveyance line that needs to be installed to support sanitary sewer service to the White Pine site on behalf of Micron and for OCWA to be able to put in a couple of supply lines for water to the site. He stated this is an additional authorization to do the work on our behalf.

Upon a motion by Janice Herzog, seconded by Fanny Villarreal, the OCIDA Board approved a resolution authorizing a contract with Barton & Loguidice in the amount of $10,000 for engineering services at Caughdenoy Industrial Business Park. Motion was carried.

Upon a motion by Janice Herzog, seconded by Fanny Villarreal, the OCIDA Board approved a resolution authorizing a contract with Barton & Loguidice in the amount of $10,000 for engineering services at Caughdenoy Industrial Business Park. Motion was carried.

MICRON NEW YORK SEMICONDUCTOR MANUFACTURING LLC (3191023-07A)

Jeff Davis stated he is going to walk the Board through the two resolutions that are on the agenda for consideration. He stated Micron has submitted an application to OCIDA for financial benefits, incentives for the project, a PILOT, sales and use tax exemption, etc. He stated the application roughly covers about 806 acres plus or minus and 2 fabs. He stated with that application an environmental assessment form under SEQRA was included to analyze the full build because that is what is required to look at when we are looking at a project like this under the state statute. He stated we are looking at the full build from an environmental standpoint which is roughly 1,400 acres and 4 fabs. He stated Micron has submitted an environmental assessment form that addresses the full build out of the Micron campus along with some ancillary facilities that are off the Micron campus which all is explained in the project description in the application, the EAF narrative, etc. He stated Barclay Damon in conjunction with the Agency's consultant, JMT, reviewed the EAF and also looked at and prepared a draft EAF part two, which allows the agency to look at the potential impacts as a result of the proposed project. He stated earlier this year we submitted a resolution and was passed for our intent to be lead agency. He stated those letters of intent went out to all involved and interested parties. He stated five involved agencies returned and consented or had no objection to OCIDA being lead agency for SEQRA. He stated the other involved agencies did not respond, they have

MICRON NEW YORK SEMICONDUCTOR MANUFACTURING LLC (3191023-07A)

Jeff Davis stated he is going to walk the Board through the two resolutions that are on the agenda for consideration. He stated Micron has submitted an application to OCIDA for financial benefits, incentives for the project, a PILOT, sales and use tax exemption, etc. He stated the application roughly covers about 806 acres plus or minus and 2 fabs. He stated with that application an environmental assessment form under SEQRA was included to analyze the full build because that is what is required to look at when we are looking at a project like this under the state statute. He stated we are looking at the full build from an environmental standpoint which is roughly 1,400 acres and 4 fabs. He stated Micron has submitted an environmental assessment form that addresses the full build out of the Micron campus along with some ancillary facilities that are off the Micron campus which all is explained in the project description in the application, the EAF narrative, etc. He stated Barclay Damon in conjunction with the Agency's consultant, JMT, reviewed the EAF and also looked at and prepared a draft EAF part two, which allows the agency to look at the potential impacts as a result of the proposed project. He stated earlier this year we submitted a resolution and was passed for our intent to be lead agency. He stated those letters of intent went out to all involved and interested parties. He stated five involved agencies returned and consented or had no objection to OCIDA being lead agency for SEQRA. He stated the other involved agencies did not respond, they have 4 a statutory period of 30 days, so they are past the statutory period. He stated the first resolution in front of the Board goes through two different steps. He stated one is officially establishing the Agency as lead agency. He stated the prior resolution was our intent. He stated no one objected and no one else said they wanted to be, so we are officially saying we are lead agency. He stated the second part of the first resolution is adopting the contents of the EAF part two. He stated the EAF part two looked at the various potential impacts for the project and when impacts fall into a potentially moderate or large category that triggers a determination as to whether and how you will proceed environmentally. He stated in this case, if you will get to part two in your packet, moderate to large impacts were in the areas of impacts to land, impacts to surface water, impacts on groundwater, impacts on flooding, impacts on air, impacts on plant and animals, impacts on agricultural resources, impacts on aesthetic resources, impacts on historic and archaeological resources, impacts on open space, impacts on traffic, impacts on energy, impacts on noise, odor and light, impacts on human health, consistency with community plans and consistency with community character. He stated part two means there could be potential moderate to large impacts and so as a result of that, the second part of the first resolution before the Board is the agency adopting that part two, and determining that the proposed Micron project, the full build, may result in one or more significant adverse impacts on the environment and that an environmental impact statement must be prepared to further assess the impacts and possible mitigation and to explore alternatives to avoid or reduce those impacts, accordingly, and therefore, the Agency is authorizing the completion of a SEQRA EAF part three of the full environmental assessment form in accordance with this resolution. He stated we are authorizing and arranging for the publication and distribution of this positive declaration and a notice of intent to prepare a draft environmental impact statement, and to take all other such actions as are necessary and appropriate to assist the Agency in fulfilling the requirements of SEQRA for the proposed Micron project and to work with the company and its agents in connection therewith. He stated the first resolution is declaring OCIDA lead agency, adopting the recommendations of part two, issuing a positive declaration based upon that part two, and moving forward with the SEQRA process under part three for the positive declaration.

4 a statutory period of 30 days, so they are past the statutory period. He stated the first resolution in front of the Board goes through two different steps. He stated one is officially establishing the Agency as lead agency. He stated the prior resolution was our intent. He stated no one objected and no one else said they wanted to be, so we are officially saying we are lead agency. He stated the second part of the first resolution is adopting the contents of the EAF part two. He stated the EAF part two looked at the various potential impacts for the project and when impacts fall into a potentially moderate or large category that triggers a determination as to whether and how you will proceed environmentally. He stated in this case, if you will get to part two in your packet, moderate to large impacts were in the areas of impacts to land, impacts to surface water, impacts on groundwater, impacts on flooding, impacts on air, impacts on plant and animals, impacts on agricultural resources, impacts on aesthetic resources, impacts on historic and archaeological resources, impacts on open space, impacts on traffic, impacts on energy, impacts on noise, odor and light, impacts on human health, consistency with community plans and consistency with community character. He stated part two means there could be potential moderate to large impacts and so as a result of that, the second part of the first resolution before the Board is the agency adopting that part two, and determining that the proposed Micron project, the full build, may result in one or more significant adverse impacts on the environment and that an environmental impact statement must be prepared to further assess the impacts and possible mitigation and to explore alternatives to avoid or reduce those impacts, accordingly, and therefore, the Agency is authorizing the completion of a SEQRA EAF part three of the full environmental assessment form in accordance with this resolution. He stated we are authorizing and arranging for the publication and distribution of this positive declaration and a notice of intent to prepare a draft environmental impact statement, and to take all other such actions as are necessary and appropriate to assist the Agency in fulfilling the requirements of SEQRA for the proposed Micron project and to work with the company and its agents in connection therewith. He stated the first resolution is declaring OCIDA lead agency, adopting the recommendations of part two, issuing a positive declaration based upon that part two, and moving forward with the SEQRA process under part three for the positive declaration.

Upon a motion by Fanny Villarreal, seconded by Janice Herzog, the OCIDA Board approved a resolution designating OCIDA as lead agency with respect to a coordinated review and determining to issue a positive declaration pursuant to the state environmental quality review act. Motion was carried.

5 Upon a motion by Fanny Villarreal, seconded by Janice Herzog, the OCIDA Board approved a resolution designating OCIDA as lead agency with respect to a coordinated review and determining to issue a positive declaration pursuant to the state environmental quality review act. Motion was carried.

5 Jeff Davis stated the second resolution before the Board is a natural offshoot of the resolution just passed. He stated it was determined to be a positive declaration so now the SEQRA process is starting, and that process commences with a scoping process. He stated a draft scoping document has been prepared in conjunction with the applicant. He stated the Board packet has the draft scoping document. He stated it has been reviewed and determined it is ready for review and comment by all involved and interested agencies and also by the public in accordance with SEQRA. He stated the resolution in front of the Board is declaring scoping shall be conducted in accordance with SEQRA and that the draft scoping document is sufficiently complete to allow the opportunity for comment. He stated Agency Counsel is authorizing to arrange for publication and distribution of the draft scoping documents, provide all necessary notifications of a public scoping meeting and comment period to all involved and interested agencies and to any individual that has expressed an interest in writing and to take all other such actions as are necessary and appropriate to assist the Agency in fulfilling the requirements under SEQRA for the proposed Micron project, and to work with the company and its agents in connection. He stated the Agency is duly authorizing and noticing a public scoping meeting to be held on October 11, 2023, to consider comments on the draft scoping document. He stated we are also opening a written comment period on the draft scoping document and written comments will be received by the Agency until October 20, 2023. He stated that is the second resolution before the board and will commence the environmental review process and the public involvement in the environmental review process.

Jeff Davis stated the second resolution before the Board is a natural offshoot of the resolution just passed. He stated it was determined to be a positive declaration so now the SEQRA process is starting, and that process commences with a scoping process. He stated a draft scoping document has been prepared in conjunction with the applicant. He stated the Board packet has the draft scoping document. He stated it has been reviewed and determined it is ready for review and comment by all involved and interested agencies and also by the public in accordance with SEQRA. He stated the resolution in front of the Board is declaring scoping shall be conducted in accordance with SEQRA and that the draft scoping document is sufficiently complete to allow the opportunity for comment. He stated Agency Counsel is authorizing to arrange for publication and distribution of the draft scoping documents, provide all necessary notifications of a public scoping meeting and comment period to all involved and interested agencies and to any individual that has expressed an interest in writing and to take all other such actions as are necessary and appropriate to assist the Agency in fulfilling the requirements under SEQRA for the proposed Micron project, and to work with the company and its agents in connection. He stated the Agency is duly authorizing and noticing a public scoping meeting to be held on October 11, 2023, to consider comments on the draft scoping document. He stated we are also opening a written comment period on the draft scoping document and written comments will be received by the Agency until October 20, 2023. He stated that is the second resolution before the board and will commence the environmental review process and the public involvement in the environmental review process.

Cydney Johnson asked if there are any thoughts or indications on the attendance at the October 11 meeting. Jeff Davis stated not as of yet. He stated meeting will be held at the North Syracuse Junior High School auditorium. He stated the scoping document does encourage speakers to register in advance and depending upon that registration and the number of people in attendance we can limit the time period of people to speak because everyone needs an opportunity to speak. He stated the scoping document is lengthy and lays out all the criteria, the project background, the process that is going to be done, the purpose in need of the projects, the alternatives and description of the proposed action, the analysis framework, etc. He stated that document is kind of the initial roadmap that will be done and commented on by the public. He stated the end of that process, after we closed the public comment period, received all comments, public hearing is closed, will be the development of a final scoping document. He stated that final scoping document is the roadmap for the development of the draft environmental impact statement.

6 Cydney Johnson asked if there are any thoughts or indications on the attendance at the October 11 meeting. Jeff Davis stated not as of yet. He stated meeting will be held at the North Syracuse Junior High School auditorium. He stated the scoping document does encourage speakers to register in advance and depending upon that registration and the number of people in attendance we can limit the time period of people to speak because everyone needs an opportunity to speak. He stated the scoping document is lengthy and lays out all the criteria, the project background, the process that is going to be done, the purpose in need of the projects, the alternatives and description of the proposed action, the analysis framework, etc. He stated that document is kind of the initial roadmap that will be done and commented on by the public. He stated the end of that process, after we closed the public comment period, received all comments, public hearing is closed, will be the development of a final scoping document. He stated that final scoping document is the roadmap for the development of the draft environmental impact statement.

6 Patrick Hogan stated it is an open transparent process that has been followed by many of our projects. Robert Petrovich stated it is a statutory requirement. He stated the hearing will commence at 6:30 PM at the North Syracuse Junior High School Auditorium.

Janice Herzog asked if there are items that need to be addressed or a resolution and how does that happen. Jeff Davis stated in terms of commenting on the project, they can review the scoping document. He stated the scoping document also directs to the project website that has been established by Micron, the applicant, and also the OCIDA website. He stated all the materials will be there. He stated anyone from the public or an involved agency can raise questions or comments with regard to an environmental issue on the project. He stated as we get to the final scoping document, all comments will develop what needs to be reviewed and studied. He stated as we get into the draft environmental impact statement, the applicant and their consulting team will study the potential impacts, determining the extent of those impacts and determining what mitigation is necessary to address those impacts. He stated that process also works hand in hand with the involved agencies that likely have the biggest interest and the determination of the mitigation. He stated for instance on traffic, New York State DOT, County DOT, the Town of Clay, the Town of Cicero, etc.; those agencies would be involved in the discussion and the development of a mitigation plan with regard to the potential impact. He stated that would go into the draft environmental impact study that would lay out concern, mitigation and how it's being addressed, and that document goes out again for comment. He stated ultimately all the comments must be put into a final environmental impact statement and be addressed. He stated every comment after the draft is logged, has to be addressed as an exhibit of the Final EIS and how you have addressed the common core concern to the maximum extent practicable. He stated this is the start of a process that is many months long to get to ultimately the goal of getting to a final environmental impact statement that is addressing those potential impacts.

Patrick Hogan stated it is an open transparent process that has been followed by many of our projects. Robert Petrovich stated it is a statutory requirement. He stated the hearing will commence at 6:30 PM at the North Syracuse Junior High School Auditorium.

Janice Herzog asked if there are items that need to be addressed or a resolution and how does that happen. Jeff Davis stated in terms of commenting on the project, they can review the scoping document. He stated the scoping document also directs to the project website that has been established by Micron, the applicant, and also the OCIDA website. He stated all the materials will be there. He stated anyone from the public or an involved agency can raise questions or comments with regard to an environmental issue on the project. He stated as we get to the final scoping document, all comments will develop what needs to be reviewed and studied. He stated as we get into the draft environmental impact statement, the applicant and their consulting team will study the potential impacts, determining the extent of those impacts and determining what mitigation is necessary to address those impacts. He stated that process also works hand in hand with the involved agencies that likely have the biggest interest and the determination of the mitigation. He stated for instance on traffic, New York State DOT, County DOT, the Town of Clay, the Town of Cicero, etc.; those agencies would be involved in the discussion and the development of a mitigation plan with regard to the potential impact. He stated that would go into the draft environmental impact study that would lay out concern, mitigation and how it's being addressed, and that document goes out again for comment. He stated ultimately all the comments must be put into a final environmental impact statement and be addressed. He stated every comment after the draft is logged, has to be addressed as an exhibit of the Final EIS and how you have addressed the common core concern to the maximum extent practicable. He stated this is the start of a process that is many months long to get to ultimately the goal of getting to a final environmental impact statement that is addressing those potential impacts.

Fanny Villarreal asked if the documents would come back before the Board. Jeff Davis stated yes. He stated this Board is lead agency for SEQRA so this Board will need to accept the final scoping document, accept the draft environmental impact statement, and say it is ready to go out for public comment, as well as accept the final environmental impact statement. He stated the Board will have to adopt its own finding statement at the end of that process.

7 Patrick Hogan asked if the Board would get all the minutes from the hearing. Jeff Davis stated yes.

Robert Petrovich stated he thinks the short answer is that there's more than one opportunity for the public to participate and comment.

Elizabeth Dreyfuss asked if this is the only meeting, and they can write in their comments. Jeff Davis stated this is the only meeting on the draft scoping document. He stated there will be future meetings as we get into the draft EIS process, etc. He stated a public hearing will be held but the comment period will be open until the 20th so all written comments can come in before or after that meeting.

Fanny Villarreal asked if the documents would come back before the Board. Jeff Davis stated yes. He stated this Board is lead agency for SEQRA so this Board will need to accept the final scoping document, accept the draft environmental impact statement, and say it is ready to go out for public comment, as well as accept the final environmental impact statement. He stated the Board will have to adopt its own finding statement at the end of that process.

7 Patrick Hogan asked if the Board would get all the minutes from the hearing. Jeff Davis stated yes.

Robert Petrovich stated he thinks the short answer is that there's more than one opportunity for the public to participate and comment.

Elizabeth Dreyfuss asked if this is the only meeting, and they can write in their comments. Jeff Davis stated this is the only meeting on the draft scoping document. He stated there will be future meetings as we get into the draft EIS process, etc. He stated a public hearing will be held but the comment period will be open until the 20th so all written comments can come in before or after that meeting.

Elizabeth Dreyfuss asked how notice of the meeting is given. Jeff Davis stated it is required that a notice be put in the Environmental Notice Bulletin by DEC and the notice has been prepared. He stated it is also required to be put in the Syracuse Post Standard so there is a quarter page ad that goes in for the public hearing. He stated it will be on the OCIDA website. He stated it will be part of this meeting and resolution. He stated the paper will likely advise people of it. Fanny Villarreal asked if Micron will be at the meeting. Jeff Davis stated yes but it is important to note this is an OCIDA led scoping meeting as lead agency to address comments. He stated it is not necessarily a question-and-answer period. He stated it is a time to let people speak and address their comments. He stated all their comments are noted and those comments are addressed through the development of the Final EIS.

Cydney Johnson asked if the OCIDA team will handle this. Robert Petrovich stated yes.

Jeff Davis stated the whole meeting will be recorded, there will be a stenographer with full minutes of that. He stated if the Board members can attend the meeting or the full extent of the meeting the minutes will all be available for the Board's review and will be summarized by OCIDA’s team that is working on this.

Upon a motion by Janice Herzog, seconded by Fanny Villarreal, the OCIDA Board approved a resolution finding the draft scoping document is sufficient for public review, opening a thirty-day Elizabeth Dreyfuss asked how notice of the meeting is given. Jeff Davis stated it is required that a notice be put in the Environmental Notice Bulletin by DEC and the notice has been prepared. He stated it is also required to be put in the Syracuse Post Standard so there is a quarter page ad that goes in for the public hearing. He stated it will be on the OCIDA website. He stated it will be part of this meeting and resolution. He stated the paper will likely advise people of it. Fanny Villarreal asked if Micron will be at the meeting. Jeff Davis stated yes but it is important to note this is an OCIDA led scoping meeting as lead agency to address comments. He stated it is not necessarily a question-and-answer period. He stated it is a time to let people speak and address their comments. He stated all their comments are noted and those comments are addressed through the development of the Final EIS.

Cydney Johnson asked if the OCIDA team will handle this. Robert Petrovich stated yes.

Jeff Davis stated the whole meeting will be recorded, there will be a stenographer with full minutes of that. He stated if the Board members can attend the meeting or the full extent of the meeting the minutes will all be available for the Board's review and will be summarized by OCIDA’s team that is working on this.

Upon a motion by Janice Herzog, seconded by Fanny Villarreal, the OCIDA Board approved a resolution finding the draft scoping document is sufficient for public review, opening a thirty-day 8 public comment period during which a public hearing will be held on October 11, 2023. Motion was carried.

Temesgen Fissehaye stated Jeff Davis did a great job explaining the process. He stated he would be more than happy to answer any questions.

8 public comment period during which a public hearing will be held on October 11, 2023. Motion was carried.

Temesgen Fissehaye stated Jeff Davis did a great job explaining the process. He stated he would be more than happy to answer any questions.

ADJOURN

Upon a motion by Janice Herzog, seconded by Fanny Villarreal, the OCIDA Board adjourned the meeting at 8:50 am. Motion was carried.

_________________________________ Nancy Lowery, Secretary 9

ADJOURN

Upon a motion by Janice Herzog, seconded by Fanny Villarreal, the OCIDA Board adjourned the meeting at 8:50 am. Motion was carried.

_________________________________ Nancy Lowery, Secretary 9

ONONDAGA COUNTY INDUSTRIAL DEVELOPMENT AGENCY

335 MONTGOMERY STREET, 2ND FLOOR, SYRACUSE, NY 13202

PHONE: 315.435.3770 • ECONOMICDEVELOPMENT@ONGOV.NET September 30, 2023

2023 Budget Current YTD

Revenue / Expense / Income Current Period Current YTD Amount Change to Budget Operating/Non-Op Revenue 397,476 2,564,772 1,472,880 1,091,892 Administrative Expense 61,919 455,276 816,000 (360,724) Operating/Program Expense 48,285 577,355 656,880 (79,525) Net Ordinary Income 287,272 1,532,141 - 1,532,141 Current Assets Current YTD Prior YTD Total Cash 9,248,910 6,565,940 Less Pass Through Received 4,948,937 2,494,286 Available Cash 4,299,973 4,071,654 Receivables 536,222 256,848 Total 4,836,194 4,328,502

ONONDAGA COUNTY INDUSTRIAL DEVELOPMENT AGENCY

335 MONTGOMERY STREET, 2ND FLOOR, SYRACUSE, NY 13202

PHONE: 315.435.3770 • ECONOMICDEVELOPMENT@ONGOV.NET September 30, 2023

2023 Budget Current YTD

Revenue / Expense / Income Current Period Current YTD Amount Change to Budget Operating/Non-Op Revenue 397,476 2,564,772 1,472,880 1,091,892 Administrative Expense 61,919 455,276 816,000 (360,724) Operating/Program Expense 48,285 577,355 656,880 (79,525) Net Ordinary Income 287,272 1,532,141 - 1,532,141 Current Assets Current YTD Prior YTD Total Cash 9,248,910 6,565,940 Less Pass Through Received 4,948,937 2,494,286 Available Cash 4,299,973 4,071,654 Receivables 536,222 256,848 Total 4,836,194 4,328,502 Receivables 0-120 days 536,222 > 120 days Total 536,222 Onondaga County Industrial Development Agency Profit and Loss September 2023 Receivables 0-120 days 536,222 > 120 days Total 536,222 Onondaga County Industrial Development Agency Profit and Loss September 2023

TOTAL

Income

500 Operating Revenue

2116 Fees

2116.1 Agency Fees 277,362.00 2116.3 WPCP Agency Fee 111,111.11 Total 2116 Fees 388,473.11 2410 Lease Income 1,224.30 Total 500 Operating Revenue 389,697.41

501 Non-Operating Revenue

2401 Interest Income 7,778.49 Total 501 Non-Operating Revenue 7,778.49

534 Pilot & Pass Thru Revenue

529 PILOT Income 1,469,019.46 Total 534 Pilot & Pass Thru Revenue 1,469,019.46 550 WPCP Pass Thru Revenue 463,103.16 Total Income $2,329,598.52 GROSS PROFIT $2,329,598.52 Expenses

6400 Operating Expense

6406 Other Professional Services

6406.50 Consulting Services 5,000.00 Total 6406 Other Professional Services 5,000.00 6407 Administrative Expense 61,918.59 6408 Meeting Expenses 198.84 6409 Conference Attendence 542.68 6410 Office Expense 542.60 6411 Memberships / Sponsorships 1,102.00 6415 FTZ 825.00 Total 6400 Operating Expense 70,129.71

6500 Agency Program Expenses

6510 White Pine Commerce Park

6510.5 Insurance 37,612.50 6510.7 WPCP Marketing 2,461.50 Total 6510 White Pine Commerce Park 40,074.00 Total 6500 Agency Program Expenses 40,074.00

6600 Non-Operating Expenses

6605 Pilot & Pass Thru Expenses

6605.2 PILOT Expense 1,438,763.00 Total 6605 Pilot & Pass Thru Expenses 1,438,763.00 Total 6600 Non-Operating Expenses 1,438,763.00

TOTAL

Income

500 Operating Revenue

2116 Fees

2116.1 Agency Fees 277,362.00 2116.3 WPCP Agency Fee 111,111.11 Total 2116 Fees 388,473.11 2410 Lease Income 1,224.30 Total 500 Operating Revenue 389,697.41

501 Non-Operating Revenue

2401 Interest Income 7,778.49 Total 501 Non-Operating Revenue 7,778.49

534 Pilot & Pass Thru Revenue

529 PILOT Income 1,469,019.46 Total 534 Pilot & Pass Thru Revenue 1,469,019.46 550 WPCP Pass Thru Revenue 463,103.16 Total Income $2,329,598.52 GROSS PROFIT $2,329,598.52 Expenses

6400 Operating Expense

6406 Other Professional Services

6406.50 Consulting Services 5,000.00 Total 6406 Other Professional Services 5,000.00 6407 Administrative Expense 61,918.59 6408 Meeting Expenses 198.84 6409 Conference Attendence 542.68 6410 Office Expense 542.60 6411 Memberships / Sponsorships 1,102.00 6415 FTZ 825.00 Total 6400 Operating Expense 70,129.71

6500 Agency Program Expenses

6510 White Pine Commerce Park

6510.5 Insurance 37,612.50 6510.7 WPCP Marketing 2,461.50 Total 6510 White Pine Commerce Park 40,074.00 Total 6500 Agency Program Expenses 40,074.00

6600 Non-Operating Expenses

6605 Pilot & Pass Thru Expenses

6605.2 PILOT Expense 1,438,763.00 Total 6605 Pilot & Pass Thru Expenses 1,438,763.00 Total 6600 Non-Operating Expenses 1,438,763.00 Accrual Basis Thursday, October Page 5, 132023 11:32 AM GMT-04:00 1/2 Onondaga County Industrial Development Agency Profit and Loss September 2023

TOTAL

6610 WPCP Pass Thru Expenses

6610.1 Barclay Damon 177,777.78 6610.2 JMT 128,787.88 6610.6 Barton & Loguidice 8,100.00 6610.7 Gorick Construction 148,437.50 Total 6610 WPCP Pass Thru Expenses 463,103.16 Total Expenses $2,012,069.87 NET OPERATING INCOME $317,528.65 NET INCOME $317,528.65 Accrual Basis Thursday, October Page 5, 132023 11:32 AM GMT-04:00 1/2 Onondaga County Industrial Development Agency Profit and Loss September 2023

TOTAL

6610 WPCP Pass Thru Expenses

6610.1 Barclay Damon 177,777.78 6610.2 JMT 128,787.88 6610.6 Barton & Loguidice 8,100.00 6610.7 Gorick Construction 148,437.50 Total 6610 WPCP Pass Thru Expenses 463,103.16 Total Expenses $2,012,069.87 NET OPERATING INCOME $317,528.65 NET INCOME $317,528.65 Accrual Basis Thursday, October Page 5, 142023 11:32 AM GMT-04:00 2/2 Onondaga County Industrial Development Agency Balance Sheet As of September 30, 2023 Accrual Basis Thursday, October Page 5, 142023 11:32 AM GMT-04:00 2/2 Onondaga County Industrial Development Agency Balance Sheet As of September 30, 2023

TOTAL

ASSETS

Current Assets Bank Accounts 200 Cash 0.00 200.1 Cash - M & T Checking 8,349,418.51 200.2 Cash - M & T Money Maker Savings 908,399.03 200.4 Destiny USA Restricted Cash -8,957.82 210 Petty Cash 50.00 Total 200 Cash 9,248,909.72 Total Bank Accounts $9,248,909.72 Accounts Receivable 380 Accounts Rec.

380.6 A/R Fees, Lease & PILOT 1,348,753.01 Total 380 Accounts Rec. 1,348,753.01 Total Accounts Receivable $1,348,753.01 Other Current Assets

480 Prepaid Expenses

480.4 Credit Balance on Card -3,400.00 Total 480 Prepaid Expenses -3,400.00 Total Other Current Assets $ -3,400.00 Total Current Assets $10,594,262.73 Fixed Assets

100 Land

101 White Pines Commerce Park 2,503,051.37

101.1 WPCP GEIS

101.101 CHA GEIS 1 267,452.05 101.102 CHA GEIS 2 219,439.36 101.104 GEIS Reg Plan Board Overview 19,797.74 Total 101.1 WPCP GEIS 506,689.15 101.2 WPCP Legal 69,774.25 101.3 Engineering Services 52,675.00 101.301 Temporary Access 4,055.44 101.4 Environmental/Demo Services 10,318.98 Total 101.3 Engineering Services 67,049.42

101.5 Land Acquisition Costs

101.501 Land Purchases 1,160,063.57 101.502 Closing Costs 3,168.14

TOTAL

ASSETS

Current Assets Bank Accounts 200 Cash 0.00 200.1 Cash - M & T Checking 8,349,418.51 200.2 Cash - M & T Money Maker Savings 908,399.03 200.4 Destiny USA Restricted Cash -8,957.82 210 Petty Cash 50.00 Total 200 Cash 9,248,909.72 Total Bank Accounts $9,248,909.72 Accounts Receivable 380 Accounts Rec.

380.6 A/R Fees, Lease & PILOT 1,348,753.01 Total 380 Accounts Rec. 1,348,753.01 Total Accounts Receivable $1,348,753.01 Other Current Assets

480 Prepaid Expenses

480.4 Credit Balance on Card -3,400.00 Total 480 Prepaid Expenses -3,400.00 Total Other Current Assets $ -3,400.00 Total Current Assets $10,594,262.73 Fixed Assets

100 Land

101 White Pines Commerce Park 2,503,051.37

101.1 WPCP GEIS

101.101 CHA GEIS 1 267,452.05 101.102 CHA GEIS 2 219,439.36 101.104 GEIS Reg Plan Board Overview 19,797.74 Total 101.1 WPCP GEIS 506,689.15 101.2 WPCP Legal 69,774.25 101.3 Engineering Services 52,675.00 101.301 Temporary Access 4,055.44 101.4 Environmental/Demo Services 10,318.98 Total 101.3 Engineering Services 67,049.42

101.5 Land Acquisition Costs

101.501 Land Purchases 1,160,063.57 101.502 Closing Costs 3,168.14 Accrual Basis Thursday, October Page 5, 152023 11:34 AM GMT-04:00 1/3 Onondaga County Industrial Development Agency Balance Sheet As of September 30, 2023 Accrual Basis Thursday, October Page 5, 152023 11:34 AM GMT-04:00 1/3 Onondaga County Industrial Development Agency Balance Sheet As of September 30, 2023

TOTAL

Total 101.5 Land Acquisition Costs 1,163,231.71 101.6 WPCP Marketing 2,984.34 Total 101 White Pines Commerce Park 4,312,780.24 106 North Salina Properties 0.00 106.1 435 North Salina 17,083.55 106.3 435 North Salina Building 634,421.53 Total 106 North Salina Properties 651,505.08 107 800 Hiawatha 604,840.42 Total 100 Land 5,569,125.74

104 Machinery & Equipment

104.1 Office Furniture 1,429.00 104.2 Equipment 4,589.00 Total 104 Machinery & Equipment 6,018.00 211 A/D Office Furniture -4,124.00 213 A/D Buildings -113,870.00 250 Investment in Real Property 29,508,083.00 Total Fixed Assets $34,965,232.74 Other Assets 240 Blue Sky Redevelopment 1,641.76 Total Other Assets $1,641.76 TOTAL ASSETS $45,561,137.23

TOTAL

Total 101.5 Land Acquisition Costs 1,163,231.71 101.6 WPCP Marketing 2,984.34 Total 101 White Pines Commerce Park 4,312,780.24 106 North Salina Properties 0.00 106.1 435 North Salina 17,083.55 106.3 435 North Salina Building 634,421.53 Total 106 North Salina Properties 651,505.08 107 800 Hiawatha 604,840.42 Total 100 Land 5,569,125.74

104 Machinery & Equipment

104.1 Office Furniture 1,429.00 104.2 Equipment 4,589.00 Total 104 Machinery & Equipment 6,018.00 211 A/D Office Furniture -4,124.00 213 A/D Buildings -113,870.00 250 Investment in Real Property 29,508,083.00 Total Fixed Assets $34,965,232.74 Other Assets 240 Blue Sky Redevelopment 1,641.76 Total Other Assets $1,641.76 TOTAL ASSETS $45,561,137.23

LIABILITIES AND EQUITY

Liabilities Current Liabilities Accounts Payable 300 WPCP Pass Thru Payable 1,276,522.48 Total Accounts Payable $1,276,522.48 Other Current Liabilities 600 Accounts Payable 0.00 600.1 Due to Related Party - OED 455,275.33 600.102 Due to BD WPCP -0.34 600.204 OHB Redev LLC Funds 296,449.15 600.205 Exp Pay Prev Period 9,700.03 600.206 Mileage Reimbursement 0.34 600.208 BlueRock Energy Agreement Deposit 25,000.00 600.209 Syracuse Rail Overpayment 500.00 600.3 Onondaga County Loan 28,080,656.77 600.31 Accrued Interest - OC Note Payable 488,656.00 Total 600.3 Onondaga County Loan 28,569,312.77

LIABILITIES AND EQUITY

Liabilities Current Liabilities Accounts Payable 300 WPCP Pass Thru Payable 1,276,522.48 Total Accounts Payable $1,276,522.48 Other Current Liabilities 600 Accounts Payable 0.00 600.1 Due to Related Party - OED 455,275.33 600.102 Due to BD WPCP -0.34 600.204 OHB Redev LLC Funds 296,449.15 600.205 Exp Pay Prev Period 9,700.03 600.206 Mileage Reimbursement 0.34 600.208 BlueRock Energy Agreement Deposit 25,000.00 600.209 Syracuse Rail Overpayment 500.00 600.3 Onondaga County Loan 28,080,656.77 600.31 Accrued Interest - OC Note Payable 488,656.00 Total 600.3 Onondaga County Loan 28,569,312.77 Accrual Basis Thursday, October Page 5, 162023 11:34 AM GMT-04:00 2/3 Onondaga County Industrial Development Agency Balance Sheet As of September 30, 2023 Accrual Basis Thursday, October Page 5, 162023 11:34 AM GMT-04:00 2/3 Onondaga County Industrial Development Agency Balance Sheet As of September 30, 2023

TOTAL

Total 600 Accounts Payable 29,356,237.28

601 PILOT and Pass Thru Payable

602 Pass Thru Payable 32,471.00 603 PILOT Pass Thru 1.01 Total 601 PILOT and Pass Thru Payable 32,472.01

631 Due to Other Governments

631.1 Towns

631.105 Camillus 173,614.97 631.12 Dewitt -21.86 631.145 Onondaga -4.45 631.15 Salina -0.81 Total 631.1 Towns 173,587.85

631.3 Schools

631.305 Baldwinsville -1,529,954.00 631.325 Jamesville-Dewitt -143.05 631.356 Syracuse -114,994.17 631.36 West Genesee 612,221.21 Total 631.3 Schools -1,032,870.01 631.4 Onondaga County 47,476.70 631.5 City of Syracuse -65,309.94 Total 631 Due to Other Governments -877,115.40 Total Other Current Liabilities $28,511,593.89 Total Current Liabilities $29,788,116.37 Total Liabilities $29,788,116.37 Equity 3900 Equity Unreserved 9,753,381.97 3901 Equity-Investment Fixed Assets 2,345,838.63 463 Reserve For Contracts 368,811.84 465 Equity - Unreserved 4,017.16 Net Income 3,300,971.26 Total Equity $15,773,020.86 TOTAL LIABILITIES AND EQUITY $45,561,137.23

TOTAL

Total 600 Accounts Payable 29,356,237.28

601 PILOT and Pass Thru Payable

602 Pass Thru Payable 32,471.00 603 PILOT Pass Thru 1.01 Total 601 PILOT and Pass Thru Payable 32,472.01

631 Due to Other Governments

631.1 Towns

631.105 Camillus 173,614.97 631.12 Dewitt -21.86 631.145 Onondaga -4.45 631.15 Salina -0.81 Total 631.1 Towns 173,587.85

631.3 Schools

631.305 Baldwinsville -1,529,954.00 631.325 Jamesville-Dewitt -143.05 631.356 Syracuse -114,994.17 631.36 West Genesee 612,221.21 Total 631.3 Schools -1,032,870.01 631.4 Onondaga County 47,476.70 631.5 City of Syracuse -65,309.94 Total 631 Due to Other Governments -877,115.40 Total Other Current Liabilities $28,511,593.89 Total Current Liabilities $29,788,116.37 Total Liabilities $29,788,116.37 Equity 3900 Equity Unreserved 9,753,381.97 3901 Equity-Investment Fixed Assets 2,345,838.63 463 Reserve For Contracts 368,811.84 465 Equity - Unreserved 4,017.16 Net Income 3,300,971.26 Total Equity $15,773,020.86 TOTAL LIABILITIES AND EQUITY $45,561,137.23 Accrual Basis Thursday, October Page 5, 172023 11:34 AM GMT-04:00 3/3 Accrual Basis Thursday, October Page 5, 172023 11:34 AM GMT-04:00 3/3

ONONDAGA COUNTY INDUSTRIAL DEVELOPMENT AGENCY

PAYMENT OF BILLS - SCHEDULE #486 October 12, 2023

ONONDAGA COUNTY INDUSTRIAL DEVELOPMENT AGENCY

PAYMENT OF BILLS - SCHEDULE #486 October 12, 2023

GENERAL EXPENSES

1. BARCLAY DAMON LLP* $ 300,000.00 Lot 62, Final Advance 2. BARCLAY DAMON LLP* $ 1,691,469.68 Purchase of Lots 76-78 3. ABC CREATIVE GROUP, LLC $ 26,100.00 Inv#'s 7810, 7824 4. LEN RAUCH $ 1,057.51 NAFTZ Annual Conference 5. BARCLAY DAMON LLP $ 177,777.78 August 2023 Legal Costs 6. BARCLAY DAMON LLP $ 2,500.00 Legal Fee for Project #3101-23-07A 7. JMT OF NEW YORK, INC. $ 128,787.88 August 2023 Engineering Costs 8. BARTON & LOGUIDICE $ 185,183.00 April-June Pre-Demolition Costs 9. BARCLAY DAMON LLP $ 26,414.75 OHB Redev LLC, Inv#'s 5254968, 5249094 10. BARCLAY DAMON LLP $ 5,662.50 OCIDA Legal, Inv#'s 5254967, 5248915 11. BARCLAY DAMON LLP $ 210.00 Roth Steel, Inv#5254939 12. BARCLAY DAMON LLP $ 5,583.39 Parks v. OCIDA, Inv#'s 5250129, 5254688

GENERAL EXPENSES

1. BARCLAY DAMON LLP* $ 300,000.00 Lot 62, Final Advance 2. BARCLAY DAMON LLP* $ 1,691,469.68 Purchase of Lots 76-78 3. ABC CREATIVE GROUP, LLC $ 26,100.00 Inv#'s 7810, 7824 4. LEN RAUCH $ 1,057.51 NAFTZ Annual Conference 5. BARCLAY DAMON LLP $ 177,777.78 August 2023 Legal Costs 6. BARCLAY DAMON LLP $ 2,500.00 Legal Fee for Project #3101-23-07A 7. JMT OF NEW YORK, INC. $ 128,787.88 August 2023 Engineering Costs 8. BARTON & LOGUIDICE $ 185,183.00 April-June Pre-Demolition Costs 9. BARCLAY DAMON LLP $ 26,414.75 OHB Redev LLC, Inv#'s 5254968, 5249094 10. BARCLAY DAMON LLP $ 5,662.50 OCIDA Legal, Inv#'s 5254967, 5248915 11. BARCLAY DAMON LLP $ 210.00 Roth Steel, Inv#5254939 12. BARCLAY DAMON LLP $ 5,583.39 Parks v. OCIDA, Inv#'s 5250129, 5254688 13. THE MANUFACTURERS ASSOCIATION $ 198.00 MACNY Legislative Breakfast, Inv#48814 TOTAL $ 2,550,944.49 13. THE MANUFACTURERS ASSOCIATION $ 198.00 MACNY Legislative Breakfast, Inv#48814 TOTAL $ 2,550,944.49

ONONDAGA COUNTY INDUSTRIAL DEVELOPMENT AGENCY

PAYMENT OF BILLS - SCHEDULE #486 October 12, 2023 PILOT Payments 1. HINSDALE ROAD GROUP, LLC* $ 525,000.00

2023 Infrastructure Payment

2. WEST GENESEE CSD $ 612,221.21 Hinsdale Road 2023 PILOT 3. TOWN OF CAMILLUS $ 173,614.97 Hinsdale Road 2023 PILOT 4. ONONDAGA COUNTY $ 127,926.82 Hinsdale Road 2023 PILOT TOTAL $ 1,438,763.00 *Ratification of Check dated September 28, 2023 1 Full Environmental Assessment Form Part 1 - Project and Setting Instructions for Completing Part 1 Part 1 is to be completed by the applicant or project sponsor. Responses become part of the application for approval or funding, are subject to public review, and may be subject to further verification.

ONONDAGA COUNTY INDUSTRIAL DEVELOPMENT AGENCY

PAYMENT OF BILLS - SCHEDULE #486 October 12, 2023 PILOT Payments 1. HINSDALE ROAD GROUP, LLC* $ 525,000.00

2023 Infrastructure Payment

2. WEST GENESEE CSD $ 612,221.21 Hinsdale Road 2023 PILOT 3. TOWN OF CAMILLUS $ 173,614.97 Hinsdale Road 2023 PILOT 4. ONONDAGA COUNTY $ 127,926.82 Hinsdale Road 2023 PILOT TOTAL $ 1,438,763.00 *Ratification of Check dated September 28, 2023 1 Full Environmental Assessment Form Part 1 - Project and Setting Instructions for Completing Part 1 Part 1 is to be completed by the applicant or project sponsor. Responses become part of the application for approval or funding, are subject to public review, and may be subject to further verification.

Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as thoroughly as possible based on current information; indicate whether missing information does not exist, or is not reasonably available to the sponsor; and, when possible, generally describe work or studies which would be necessary to update or fully develop that information.

Applicants/sponsors must complete all items in Sections A & B. In Sections C, D & E, most items contain an initial question that must be answered either “Yes” or “No”. If the answer to the initial question is “Yes”, complete the sub-questions that follow. If the answer to the initial question is “No”, proceed to the next question. Section F allows the project sponsor to identify and attach any additional information. Section G requires the name and signature of the applicant or project sponsor to verify that the information contained in Part 1is accurate and complete.

A. Project and Applicant/Sponsor Information.

Name of Action or Project:

Redevelopment of the former Shoppingtown Mall Site (District East) Project Location (describe, and attach a general location map):

Former Shoppingtown Mall Site and ancillary parcels, tax id numbers: 064.-01-02.1, 063.-01-02.2, 063.-01-02.3, 063.-01-02.4, 063.-01-02.5 Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as thoroughly as possible based on current information; indicate whether missing information does not exist, or is not reasonably available to the sponsor; and, when possible, generally describe work or studies which would be necessary to update or fully develop that information.

Applicants/sponsors must complete all items in Sections A & B. In Sections C, D & E, most items contain an initial question that must be answered either “Yes” or “No”. If the answer to the initial question is “Yes”, complete the sub-questions that follow. If the answer to the initial question is “No”, proceed to the next question. Section F allows the project sponsor to identify and attach any additional information. Section G requires the name and signature of the applicant or project sponsor to verify that the information contained in Part 1is accurate and complete.

A. Project and Applicant/Sponsor Information.

Name of Action or Project:

Redevelopment of the former Shoppingtown Mall Site (District East) Project Location (describe, and attach a general location map):

Former Shoppingtown Mall Site and ancillary parcels, tax id numbers: 064.-01-02.1, 063.-01-02.2, 063.-01-02.3, 063.-01-02.4, 063.-01-02.5 Brief Description of Proposed Action (include purpose or need):

The District East Project will involve demolition of the bulk of the existing former Shoppingtown Mall in order to facilitate its redevelopment into a walkable, mixed-use town center development, inclusive of retail, entertainment, office, residential, and open space. The Project is anticipated to include 1.96 million square feet of leasable space inclusive of 912 dwelling units in 33 structures of up to six stories in height. The Applicant intends to construct a new street grid that will incorporate sidewalks, bicycle infrastructure, pedestrian scale lighting, street trees, and on-street parking. The Project will also include surface parking areas and will utilize the existing parking garage in order to provide up to 4,105 parking spaces. As part of its application to OCIDA, in addition to a Payment in Lieu of Tax Agreement, sales tax exemption, and mortgage tax exemptions, the Applicant is requesting that OCIDA exercise its authority to acquire certain lands and real property rights through the exercise of its power of eminent domain for the former Sears sites (tax map lots 063.-01-2.4 and 063.-01-2.5) totaling 2.54 acres and Macy’s site (tax lots 063.-01-02.3) totaling 1.67 acres pursuant to and consistent with the New York Eminent Domain Procedure Law for the purposes of acquiring all needed rights for a unified and comprehensive redevelopment of the overall 69± acre site (“Site”). Brief Description of Proposed Action (include purpose or need):

The District East Project will involve demolition of the bulk of the existing former Shoppingtown Mall in order to facilitate its redevelopment into a walkable, mixed-use town center development, inclusive of retail, entertainment, office, residential, and open space. The Project is anticipated to include 1.96 million square feet of leasable space inclusive of 912 dwelling units in 33 structures of up to six stories in height. The Applicant intends to construct a new street grid that will incorporate sidewalks, bicycle infrastructure, pedestrian scale lighting, street trees, and on-street parking. The Project will also include surface parking areas and will utilize the existing parking garage in order to provide up to 4,105 parking spaces. As part of its application to OCIDA, in addition to a Payment in Lieu of Tax Agreement, sales tax exemption, and mortgage tax exemptions, the Applicant is requesting that OCIDA exercise its authority to acquire certain lands and real property rights through the exercise of its power of eminent domain for the former Sears sites (tax map lots 063.-01-2.4 and 063.-01-2.5) totaling 2.54 acres and Macy’s site (tax lots 063.-01-02.3) totaling 1.67 acres pursuant to and consistent with the New York Eminent Domain Procedure Law for the purposes of acquiring all needed rights for a unified and comprehensive redevelopment of the overall 69± acre site (“Site”). Name of Applicant/Sponsor: Telephone: 315-282-0808 OHB Redev, LLC E-Mail: ryan@districteastsyr.com Address: 321 South Salina Street, 1st Floor City/PO: Syracuse State: Zip Code:

NY 13202

Project Contact (if not same as sponsor; give name and title/role): Telephone: 315-282-0808 Ryan Benz, Member E-Mail: ryan@districteastsyr.com Address:

same as above City/PO: State: Zip Code: Name of Applicant/Sponsor: Telephone: 315-282-0808 OHB Redev, LLC E-Mail: ryan@districteastsyr.com Address: 321 South Salina Street, 1st Floor City/PO: Syracuse State: Zip Code:

NY 13202

Project Contact (if not same as sponsor; give name and title/role): Telephone: 315-282-0808 Ryan Benz, Member E-Mail: ryan@districteastsyr.com Address:

same as above City/PO: State: Zip Code: Property Owner (if not same as sponsor): Telephone: 315-435-2244 Onondaga County - Daniel Hammer, Purchasing Director E-Mail: DanielHammer@ongov.net Address:

421 Montgomery Street

City/PO: State: Zip Code: Syracuse NY 13202

FEAF 2019

Property Owner (if not same as sponsor): Telephone: 315-435-2244 Onondaga County - Daniel Hammer, Purchasing Director E-Mail: DanielHammer@ongov.net Address:

421 Montgomery Street

City/PO: State: Zip Code: Syracuse NY 13202

FEAF 2019

B. Government Approvals B. Government Approvals, Funding, or Sponsorship. (“Funding” includes grants, loans, tax relief, and any other forms of financial assistance.) Government Entity If Yes: Identify Agency and Approval(s) Application Date Required (Actual or projected) a. City Council, Town Board, 9 ✔ Yes 9 No Town of DeWitt Town Board (Adoption of projected 06/2023 or Village Board of Trustees Mixed-Use Village Overlay District on Project Site) b. City, Town or Village 9 Yes 9 No ✔ Town of DeWitt Planning Board (Adoption of MUV projected 06/2023 Planning Board or Commission District Plan, Site Plan, and Subdivision Approval) c. City, Town or 9 Yes ✔

9 No (see EAF Narrative)

Village Zoning Board of Appeals d. Other local agencies 9 Yes 9 No ✔ Town of DeWitt Department of Planning and projected 08/2023 Zoning (Development Permit) e. County agencies 9 Yes 9 No ✔ Onondaga County Industrial Development Agency 9/2022 (OCIDA) (Eminent Domain,PILOT, Mortgage and f. Regional agencies 9 Yes ✔

9 No Sales Tax Relief)

B. Government Approvals B. Government Approvals, Funding, or Sponsorship. (“Funding” includes grants, loans, tax relief, and any other forms of financial assistance.) Government Entity If Yes: Identify Agency and Approval(s) Application Date Required (Actual or projected) a. City Council, Town Board, 9 ✔ Yes 9 No Town of DeWitt Town Board (Adoption of projected 06/2023 or Village Board of Trustees Mixed-Use Village Overlay District on Project Site) b. City, Town or Village 9 Yes 9 No ✔ Town of DeWitt Planning Board (Adoption of MUV projected 06/2023 Planning Board or Commission District Plan, Site Plan, and Subdivision Approval) c. City, Town or 9 Yes ✔

9 No (see EAF Narrative)

Village Zoning Board of Appeals d. Other local agencies 9 Yes 9 No ✔ Town of DeWitt Department of Planning and projected 08/2023 Zoning (Development Permit) e. County agencies 9 Yes 9 No ✔ Onondaga County Industrial Development Agency 9/2022 (OCIDA) (Eminent Domain,PILOT, Mortgage and f. Regional agencies 9 Yes ✔

9 No Sales Tax Relief)

g. State agencies ✔ 9 Yes 9 No New York State Department of Transportation projected 08/2023 Region 3 (Highway Work Permit) h. Federal agencies 9 Yes ✔ 9 No i. Coastal Resources.

i. Is the project site within a Coastal Area, or the waterfront area of a Designated Inland Waterway? 9 Yes ✔ 9 No ii. Is the project site located in a community with an approved Local Waterfront Revitalization Program? 9 Yes ✔ 9 No iii. Is the project site within a Coastal Erosion Hazard Area? 9 Yes ✔ 9 No C. Planning and Zoning g. State agencies ✔ 9 Yes 9 No New York State Department of Transportation projected 08/2023 Region 3 (Highway Work Permit) h. Federal agencies 9 Yes ✔ 9 No i. Coastal Resources.

i. Is the project site within a Coastal Area, or the waterfront area of a Designated Inland Waterway? 9 Yes ✔ 9 No ii. Is the project site located in a community with an approved Local Waterfront Revitalization Program? 9 Yes ✔ 9 No iii. Is the project site within a Coastal Erosion Hazard Area? 9 Yes ✔ 9 No C. Planning and Zoning C.1. Planning and zoning actions.

Will administrative or legislative adoption, or amendment of a plan, local law, ordinance, rule or regulation be the 9 Yes ✔ 9 No only approval(s) which must be granted to enable the proposed action to proceed?

• If Yes, complete sections C, F and G.

• If No, proceed to question C.2 and complete all remaining sections and questions in Part 1 C.2. Adopted land use plans.

a. Do any municipally- adopted (city, town, village or county) comprehensive land use plan(s) include the site ✔

9 Yes 9 No

where the proposed action would be located? Town of DeWitt Comprehensive Plan Update (2017) If Yes, does the comprehensive plan include specific recommendations for the site where the proposed action 9 Yes 9 No ✔ would be located? (see EAF narrative) b. Is the site of the proposed action within any local or regional special planning district (for example: Greenway; 9 Yes ✔ 9 No Brownfield Opportunity Area (BOA); designated State or Federal heritage area; watershed management plan; or other?) If Yes, identify the plan(s):

_______________________________________________________________________________________________________ There are no current special planning districts, although the applicant understands that the Town of DeWitt is in the process of reviewing a Local Waterfront Revitalization Program.

________________________________________________________________________________________________________ ________________________________________________________________________________________________________ C.1. Planning and zoning actions.

Will administrative or legislative adoption, or amendment of a plan, local law, ordinance, rule or regulation be the 9 Yes ✔ 9 No only approval(s) which must be granted to enable the proposed action to proceed?

• If Yes, complete sections C, F and G.

• If No, proceed to question C.2 and complete all remaining sections and questions in Part 1 C.2. Adopted land use plans.

a. Do any municipally- adopted (city, town, village or county) comprehensive land use plan(s) include the site ✔

9 Yes 9 No

where the proposed action would be located? Town of DeWitt Comprehensive Plan Update (2017) If Yes, does the comprehensive plan include specific recommendations for the site where the proposed action 9 Yes 9 No ✔ would be located? (see EAF narrative) b. Is the site of the proposed action within any local or regional special planning district (for example: Greenway; 9 Yes ✔ 9 No Brownfield Opportunity Area (BOA); designated State or Federal heritage area; watershed management plan; or other?) If Yes, identify the plan(s):

_______________________________________________________________________________________________________ There are no current special planning districts, although the applicant understands that the Town of DeWitt is in the process of reviewing a Local Waterfront Revitalization Program.

________________________________________________________________________________________________________ ________________________________________________________________________________________________________ c. Is the proposed action located wholly or partially within an area listed in an adopted municipal open space plan, 9 Yes ✔ 9 No or an adopted municipal farmland protection plan?

If Yes, identify the plan(s):

________________________________________________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ C.3. Zoning c. Is the proposed action located wholly or partially within an area listed in an adopted municipal open space plan, 9 Yes ✔ 9 No or an adopted municipal farmland protection plan?

If Yes, identify the plan(s):

________________________________________________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ C.3. Zoning a. Is the site of the proposed action located in a municipality with an adopted zoning law or ordinance. 9 Yes 9 No ✔ If Yes, what is the zoning classification(s) including any applicable overlay district?

_________________________________________________________________________________________________________ The site is currently zoned "Business (B)," and is also located within the "Mixed-Use Village III (MUV-3) Floating Overlay District" _________________________________________________________________________________________________________ a. Is the site of the proposed action located in a municipality with an adopted zoning law or ordinance. 9 Yes 9 No ✔ If Yes, what is the zoning classification(s) including any applicable overlay district?

_________________________________________________________________________________________________________ The site is currently zoned "Business (B)," and is also located within the "Mixed-Use Village III (MUV-3) Floating Overlay District" _________________________________________________________________________________________________________ b. Is the use permitted or allowed by a special or conditional use permit? ✔

9 Yes 9 No

c. Is a zoning change requested as part of the proposed action? ✔

9 Yes 9 No

If Yes, i. What is the proposed new zoning for the site? Mixed-Use ___________________________________________________________________ Floating Overlay District (192-64.4), with proposed amendments (See EAF narrative). C.4. Existing community services.

a. In what school district is the project site located? Jamesville-DeWitt ________________________________________________________________ Central School District b. What police or other public protection forces serve the project site?

Town_________________________________________________________________________________________________________ of DeWitt Police. (See EAF narrative) b. Is the use permitted or allowed by a special or conditional use permit? ✔

9 Yes 9 No

c. Is a zoning change requested as part of the proposed action? ✔

9 Yes 9 No

If Yes, i. What is the proposed new zoning for the site? Mixed-Use ___________________________________________________________________ Floating Overlay District (192-64.4), with proposed amendments (See EAF narrative). C.4. Existing community services.

a. In what school district is the project site located? Jamesville-DeWitt ________________________________________________________________ Central School District b. What police or other public protection forces serve the project site?

Town_________________________________________________________________________________________________________ of DeWitt Police. (See EAF narrative) c. Which fire protection and emergency medical services serve the project site?

__________________________________________________________________________________________________________ DeWitt Fire District. EMS Services: Rural Metro, ALS, AMR, EAVES, and TLC. (See EAF Narrative) d. What parks serve the project site?

__________________________________________________________________________________________________________ Butternut Creek Trail (approximately .5 mile), Old Erie Canal State Historic Park (approximately .5 mile), Ryder Park (approximately .6 mile), Cedar Bay Park__________________________________________________________________________________________________________ (approximately 1.3 miles) D. Project Details D.1. Proposed and Potential Development c. Which fire protection and emergency medical services serve the project site?

__________________________________________________________________________________________________________ DeWitt Fire District. EMS Services: Rural Metro, ALS, AMR, EAVES, and TLC. (See EAF Narrative) d. What parks serve the project site?

__________________________________________________________________________________________________________ Butternut Creek Trail (approximately .5 mile), Old Erie Canal State Historic Park (approximately .5 mile), Ryder Park (approximately .6 mile), Cedar Bay Park__________________________________________________________________________________________________________ (approximately 1.3 miles) D. Project Details D.1. Proposed and Potential Development a. What is the general nature of the proposed action (e.g., residential, industrial, commercial, recreational; if mixed, include all components)? This mixed-use project will include a combination of residential, commercial/office, and entertainment/recreation. (See _________________________________________________________________________________________________________

Section A. of EAF Narrative for detailed description and acreages)

b. a. Total acreage of the site of the proposed action? _____________ 69 acres b. Total acreage to be physically disturbed? _____________ 69 acres c. Total acreage (project site and any contiguous properties) owned or controlled by the applicant or project sponsor? _____________ 63.8 acres a. What is the general nature of the proposed action (e.g., residential, industrial, commercial, recreational; if mixed, include all components)? This mixed-use project will include a combination of residential, commercial/office, and entertainment/recreation. (See _________________________________________________________________________________________________________

Section A. of EAF Narrative for detailed description and acreages)

b. a. Total acreage of the site of the proposed action? _____________ 69 acres b. Total acreage to be physically disturbed? _____________ 69 acres c. Total acreage (project site and any contiguous properties) owned or controlled by the applicant or project sponsor? _____________ 63.8 acres c. Is the proposed action an expansion of an existing project or use? 9 Yes ✔9 No i. If Yes, what is the approximate percentage of the proposed expansion and identify the units (e.g., acres, miles, housing units, square feet)? % ____________________ Units: ____________________ d. Is the proposed action a subdivision, or does it include a subdivision? ✔

9 Yes 9 No

If Yes, i. Purpose or type of subdivision? (e.g., residential, industrial, commercial; if mixed, specify types) ________________________________________________________________________________________________________ ii. Is a cluster/conservation layout proposed? 9 Yes 9 ✔ No iii. Number of lots proposed? ________TBD iv. Minimum and maximum proposed lot sizes? Minimum __________ TBD Maximum __________ TBD e. Will the proposed action be constructed in multiple phases? 9 Yes 9 No ✔ i. If No, anticipated period of construction: _____ months ii. If Yes:

• Total number of phases anticipated _____ 9 • Anticipated commencement date of phase 1 (including demolition) 11 _____ month _____ 2023 year • Anticipated completion date of final phase 12 _____ month _____year 2035 • Generally describe connections or relationships among phases, including any contingencies where progress of one phase may determine timing or duration of future phases: The District East project will be constructed in (up to) 9 phases, beginning with our “Phase Zero” Infrastructure project (new road grid, utilities, and green spaces). The early phases (phases 1 through 3) will be focused on a mix of market rate residential in the central “west-to-east” spine of the project as well as the (Erie Blvd facing – west side) retail and grocer. The middle phases (phases 4 through 6) will be focused on balance of residential units – a mix of market-rate and affordable - as well as emphasis on commercial/medical programming. The latter phases (phases 7 and 8) will focus on the infill of retail and hospitality on the Kinne Rd (north) frontage. c. Is the proposed action an expansion of an existing project or use? 9 Yes ✔9 No i. If Yes, what is the approximate percentage of the proposed expansion and identify the units (e.g., acres, miles, housing units, square feet)? % ____________________ Units: ____________________ d. Is the proposed action a subdivision, or does it include a subdivision? ✔

9 Yes 9 No

If Yes, i. Purpose or type of subdivision? (e.g., residential, industrial, commercial; if mixed, specify types) ________________________________________________________________________________________________________ ii. Is a cluster/conservation layout proposed? 9 Yes 9 ✔ No iii. Number of lots proposed? ________TBD iv. Minimum and maximum proposed lot sizes? Minimum __________ TBD Maximum __________ TBD e. Will the proposed action be constructed in multiple phases? 9 Yes 9 No ✔ i. If No, anticipated period of construction: _____ months ii. If Yes:

• Total number of phases anticipated _____ 9 • Anticipated commencement date of phase 1 (including demolition) 11 _____ month _____ 2023 year • Anticipated completion date of final phase 12 _____ month _____year 2035 • Generally describe connections or relationships among phases, including any contingencies where progress of one phase may determine timing or duration of future phases: The District East project will be constructed in (up to) 9 phases, beginning with our “Phase Zero” Infrastructure project (new road grid, utilities, and green spaces). The early phases (phases 1 through 3) will be focused on a mix of market rate residential in the central “west-to-east” spine of the project as well as the (Erie Blvd facing – west side) retail and grocer. The middle phases (phases 4 through 6) will be focused on balance of residential units – a mix of market-rate and affordable - as well as emphasis on commercial/medical programming. The latter phases (phases 7 and 8) will focus on the infill of retail and hospitality on the Kinne Rd (north) frontage. f. Does the project include new residential uses? ✔

9 Yes 9 No

If Yes, show numbers of units proposed.

One Family Two Family Three Family Multiple Family (four or more) Initial Phase ___________ ___________ ____________ ________________________ not known at this time At completion of all phases ___________ ___________ ____________ ________________________ 912 f. Does the project include new residential uses? ✔

9 Yes 9 No

If Yes, show numbers of units proposed.

One Family Two Family Three Family Multiple Family (four or more) Initial Phase ___________ ___________ ____________ ________________________ not known at this time At completion of all phases ___________ ___________ ____________ ________________________ 912 g. Does the proposed action include new non-residential construction (including expansions)? 9 Yes 9 No ✔ If Yes, i. Total number of structures ___________32 ii. Dimensions (in feet) of largest proposed structure: ________height;

75' ________width;

239' and _______ 336' length iii. Approximate extent of building space to be heated or cooled: ______________________ 1,965,037 square feet g. Does the proposed action include new non-residential construction (including expansions)? 9 Yes 9 No ✔ If Yes, i. Total number of structures ___________32 ii. Dimensions (in feet) of largest proposed structure: ________height;

75' ________width;

239' and _______ 336' length iii. Approximate extent of building space to be heated or cooled: ______________________ 1,965,037 square feet h. Does the proposed action include construction or other activities that will result in the impoundment of any 9 Yes 9 No ✔ liquids, such as creation of a water supply, reservoir, pond, lake, waste lagoon or other storage? If Yes, i. Purpose of the impoundment: stormwater ________________________________________________________________________________ retention ii. If a water impoundment, the principal source of the water: 9 Ground water 9 Surface water streams ✔ 9 Other specify: _________________________________________________________________________________________________________ Stormwater collected from the site.

iii. If other than water, identify the type of impounded/contained liquids and their source. _________________________________________________________________________________________________________ iv. Approximate size of the proposed impoundment. Volume: ____________TBD million gallons; surface area: ____________ TBD acres v. Dimensions of the proposed dam or impounding structure: ________ TBD height; _______ TBD length vi. Construction method/materials for the proposed dam or impounding structure (e.g., earth fill, rock, wood, concrete): Earthen________________________________________________________________________________________________________ fill (stormwater retention basin) and/or subsurface concrete structures.

h. Does the proposed action include construction or other activities that will result in the impoundment of any 9 Yes 9 No ✔ liquids, such as creation of a water supply, reservoir, pond, lake, waste lagoon or other storage? If Yes, i. Purpose of the impoundment: stormwater ________________________________________________________________________________ retention ii. If a water impoundment, the principal source of the water: 9 Ground water 9 Surface water streams ✔ 9 Other specify: _________________________________________________________________________________________________________ Stormwater collected from the site.

iii. If other than water, identify the type of impounded/contained liquids and their source. _________________________________________________________________________________________________________ iv. Approximate size of the proposed impoundment. Volume: ____________TBD million gallons; surface area: ____________ TBD acres v. Dimensions of the proposed dam or impounding structure: ________ TBD height; _______ TBD length vi. Construction method/materials for the proposed dam or impounding structure (e.g., earth fill, rock, wood, concrete): Earthen________________________________________________________________________________________________________ fill (stormwater retention basin) and/or subsurface concrete structures.

D.2. Project Operations a. Does the proposed action include any excavation, mining, or dredging, during construction, operations, or both? 9 Yes ✔ 9 No (Not including general site preparation, grading or installation of utilities or foundations where all excavated materials will remain onsite) If Yes:

i .What is the purpose of the excavation or dredging? _______________________________________________________________ ii. How much material (including rock, earth, sediments, etc.) is proposed to be removed from the site? • Volume (specify tons or cubic yards): ____________________________________________ • Over what duration of time? ____________________________________________________ iii. Describe nature and characteristics of materials to be excavated or dredged, and plans to use, manage or dispose of them. ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ iv. Will there be onsite dewatering or processing of excavated materials? 9 Yes 9 No If yes, describe. ___________________________________________________________________________________________ ________________________________________________________________________________________________________ v. What is the total area to be dredged or excavated? _____________________________________acres vi. What is the maximum area to be worked at any one time? _______________________________ acres vii. What would be the maximum depth of excavation or dredging? __________________________ feet viii. Will the excavation require blasting? 9 Yes 9 No ix. Summarize site reclamation goals and plan: _____________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ D.2. Project Operations a. Does the proposed action include any excavation, mining, or dredging, during construction, operations, or both? 9 Yes ✔ 9 No (Not including general site preparation, grading or installation of utilities or foundations where all excavated materials will remain onsite) If Yes:

i .What is the purpose of the excavation or dredging? _______________________________________________________________ ii. How much material (including rock, earth, sediments, etc.) is proposed to be removed from the site? • Volume (specify tons or cubic yards): ____________________________________________ • Over what duration of time? ____________________________________________________ iii. Describe nature and characteristics of materials to be excavated or dredged, and plans to use, manage or dispose of them. ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ iv. Will there be onsite dewatering or processing of excavated materials? 9 Yes 9 No If yes, describe. ___________________________________________________________________________________________ ________________________________________________________________________________________________________ v. What is the total area to be dredged or excavated? _____________________________________acres vi. What is the maximum area to be worked at any one time? _______________________________ acres vii. What would be the maximum depth of excavation or dredging? __________________________ feet viii. Will the excavation require blasting? 9 Yes 9 No ix. Summarize site reclamation goals and plan: _____________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ b. Would the proposed action cause or result in alteration of, increase or decrease in size of, or encroachment 9 Yes ✔9 No into any existing wetland, waterbody, shoreline, beach or adjacent area?

If Yes:

i. Identify the wetland or waterbody which would be affected (by name, water index number, wetland map number or geographic description): ______________________________________________________________________________________________ _________________________________________________________________________________________________________ b. Would the proposed action cause or result in alteration of, increase or decrease in size of, or encroachment 9 Yes ✔9 No into any existing wetland, waterbody, shoreline, beach or adjacent area?

If Yes:

i. Identify the wetland or waterbody which would be affected (by name, water index number, wetland map number or geographic description): ______________________________________________________________________________________________ _________________________________________________________________________________________________________ ii. Describe how the proposed action would affect that waterbody or wetland, e.g. excavation, fill, placement of structures, or alteration of channels, banks and shorelines. Indicate extent of activities, alterations and additions in square feet or acres: _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ iii. Will the proposed action cause or result in disturbance to bottom sediments? Yes 9 No If Yes, describe: __________________________________________________________________________________________ iv. Will the proposed action cause or result in the destruction or removal of aquatic vegetation? 9 Yes 9 No If Yes:

• acres of aquatic vegetation proposed to be removed: ___________________________________________________________ • expected acreage of aquatic vegetation remaining after project completion:________________________________________ • purpose of proposed removal (e.g. beach clearing, invasive species control, boat access): ____________________________ ____________________________________________________________________________________________________ • proposed method of plant removal: ________________________________________________________________________ • if chemical/herbicide treatment will be used, specify product(s): _________________________________________________ v. Describe any proposed reclamation/mitigation following disturbance: _________________________________________________ _________________________________________________________________________________________________________ c. Will the proposed action use, or create a new demand for water? ✔9 Yes 9 No If Yes:

i. Total anticipated water usage/demand per day: __________________________ 60,000 (see EAF Narrative) gallons/day ii. Will the proposed action obtain water from an existing public water supply? ✔9 Yes 9 No If Yes:

• Name of district or service area: Town _________________________________________________________________________ of DeWitt Water District • Does the existing public water supply have capacity to serve the proposal? ✔9 Yes 9 No • Is the project site in the existing district? ✔9 Yes 9 No • Is expansion of the district needed? 9 Yes ✔ 9 No • Do existing lines serve the project site? ✔9 Yes 9 No iii. Will line extension within an existing district be necessary to supply the project? ✔9 Yes 9 No If Yes:

• Describe extensions or capacity expansions proposed to serve this project: ________________________________________ ____________________________________________________________________________________________________ 10" main to connect mains at Erie Boulevard and Kinne Street. (see EAF Narrative) • Source(s) of supply for the district: ________________________________________________________________________ Onondaga County Water Authority, City of Syracuse iv. Is a new water supply district or service area proposed to be formed to serve the project site? 9 Yes ✔ 9 No If, Yes:

• Applicant/sponsor for new district: ________________________________________________________________________ • Date application submitted or anticipated: __________________________________________________________________ • Proposed source(s) of supply for new district: _______________________________________________________________ v. If a public water supply will not be used, describe plans to provide water supply for the project: ___________________________ _________________________________________________________________________________________________________ vi. If water supply will be from wells (public or private), what is the maximum pumping capacity: _______ gallons/minute. d. Will the proposed action generate liquid wastes? ✔9 Yes 9 No If Yes:

i. Total anticipated liquid waste generation per day: _______________ 60,000 gallons/day ii. Nature of liquid wastes to be generated (e.g., sanitary wastewater, industrial; if combination, describe all components and approximate volumes or proportions of each): __________________________________________________________________ 60,000 _________________________________________________________________________________________________________ gallons/day of sanitary wastewater (see EAF Narrative) _________________________________________________________________________________________________________ iii. Will the proposed action use any existing public wastewater treatment facilities? ✔9 Yes 9 No If Yes:

• Metropolitan Wastewater Treatment Plant Name of wastewater treatment plant to be used: _____________________________________________________________ • Name of district: Onondaga ______________________________________________________________________________________ County Consolidated Sanitary District • Does the existing wastewater treatment plant have capacity to serve the project? ✔9 Yes 9 No • Is the project site in the existing district? ✔9 Yes 9 No • Is expansion of the district needed? 9 Yes ✔ 9 No ii. Describe how the proposed action would affect that waterbody or wetland, e.g. excavation, fill, placement of structures, or alteration of channels, banks and shorelines. Indicate extent of activities, alterations and additions in square feet or acres: _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ iii. Will the proposed action cause or result in disturbance to bottom sediments? Yes 9 No If Yes, describe: __________________________________________________________________________________________ iv. Will the proposed action cause or result in the destruction or removal of aquatic vegetation? 9 Yes 9 No If Yes:

• acres of aquatic vegetation proposed to be removed: ___________________________________________________________ • expected acreage of aquatic vegetation remaining after project completion:________________________________________ • purpose of proposed removal (e.g. beach clearing, invasive species control, boat access): ____________________________ ____________________________________________________________________________________________________ • proposed method of plant removal: ________________________________________________________________________ • if chemical/herbicide treatment will be used, specify product(s): _________________________________________________ v. Describe any proposed reclamation/mitigation following disturbance: _________________________________________________ _________________________________________________________________________________________________________ c. Will the proposed action use, or create a new demand for water? ✔9 Yes 9 No If Yes:

i. Total anticipated water usage/demand per day: __________________________ 60,000 (see EAF Narrative) gallons/day ii. Will the proposed action obtain water from an existing public water supply? ✔9 Yes 9 No If Yes:

• Name of district or service area: Town _________________________________________________________________________ of DeWitt Water District • Does the existing public water supply have capacity to serve the proposal? ✔9 Yes 9 No • Is the project site in the existing district? ✔9 Yes 9 No • Is expansion of the district needed? 9 Yes ✔ 9 No • Do existing lines serve the project site? ✔9 Yes 9 No iii. Will line extension within an existing district be necessary to supply the project? ✔9 Yes 9 No If Yes:

• Describe extensions or capacity expansions proposed to serve this project: ________________________________________ ____________________________________________________________________________________________________ 10" main to connect mains at Erie Boulevard and Kinne Street. (see EAF Narrative) • Source(s) of supply for the district: ________________________________________________________________________ Onondaga County Water Authority, City of Syracuse iv. Is a new water supply district or service area proposed to be formed to serve the project site? 9 Yes ✔ 9 No If, Yes:

• Applicant/sponsor for new district: ________________________________________________________________________ • Date application submitted or anticipated: __________________________________________________________________ • Proposed source(s) of supply for new district: _______________________________________________________________ v. If a public water supply will not be used, describe plans to provide water supply for the project: ___________________________ _________________________________________________________________________________________________________ vi. If water supply will be from wells (public or private), what is the maximum pumping capacity: _______ gallons/minute. d. Will the proposed action generate liquid wastes? ✔9 Yes 9 No If Yes:

i. Total anticipated liquid waste generation per day: _______________ 60,000 gallons/day ii. Nature of liquid wastes to be generated (e.g., sanitary wastewater, industrial; if combination, describe all components and approximate volumes or proportions of each): __________________________________________________________________ 60,000 _________________________________________________________________________________________________________ gallons/day of sanitary wastewater (see EAF Narrative) _________________________________________________________________________________________________________ iii. Will the proposed action use any existing public wastewater treatment facilities? ✔9 Yes 9 No If Yes:

• Metropolitan Wastewater Treatment Plant Name of wastewater treatment plant to be used: _____________________________________________________________ • Name of district: Onondaga ______________________________________________________________________________________ County Consolidated Sanitary District • Does the existing wastewater treatment plant have capacity to serve the project? ✔9 Yes 9 No • Is the project site in the existing district? ✔9 Yes 9 No • Is expansion of the district needed? 9 Yes ✔ 9 No • Do existing sewer lines serve the project site? 9 Yes 9 No ✔ • Will a line extension within an existing district be necessary to serve the project? 9 Yes 9 No ✔ If Yes:

• Describe extensions or capacity expansions proposed to serve this project: ____________________________________ ____________________________________________________________________________________________________ A pump station and a new 10-inch high-density polyethylene (HDPE) forcemain will need to be constructed and discharge to the 36-inch combined sewer located at the intersection of Erie Boulevard East and Kinne Road, which ultimately discharges to the MWWTP (see EAF Narrative). ____________________________________________________________________________________________________ iv. Will a new wastewater (sewage) treatment district be formed to serve the project site? 9 Yes ✔ 9 No If Yes:

• Applicant/sponsor for new district: ____________________________________________________________________ • Date application submitted or anticipated: _______________________________________________________________ • What is the receiving water for the wastewater discharge? __________________________________________________ v. If public facilities will not be used, describe plans to provide wastewater treatment for the project, including specifying proposed receiving water (name and classification if surface discharge or describe subsurface disposal plans): New________________________________________________________________________________________________________ sanitary sewer lines will be constructed throughout the newly constructed buildings and connect to the existing mouth in Erie Boulevard. (see EAF Narrative) ________________________________________________________________________________________________________ vi. Describe any plans or designs to capture, recycle or reuse liquid waste: _______________________________________________ There ________________________________________________________________________________________________________ are no plans at this time to capture, recycle, or reuse liquid waste.

________________________________________________________________________________________________________ • Do existing sewer lines serve the project site? 9 Yes 9 No ✔ • Will a line extension within an existing district be necessary to serve the project? 9 Yes 9 No ✔ If Yes:

• Describe extensions or capacity expansions proposed to serve this project: ____________________________________ ____________________________________________________________________________________________________ A pump station and a new 10-inch high-density polyethylene (HDPE) forcemain will need to be constructed and discharge to the 36-inch combined sewer located at the intersection of Erie Boulevard East and Kinne Road, which ultimately discharges to the MWWTP (see EAF Narrative). ____________________________________________________________________________________________________ iv. Will a new wastewater (sewage) treatment district be formed to serve the project site? 9 Yes ✔ 9 No If Yes:

• Applicant/sponsor for new district: ____________________________________________________________________ • Date application submitted or anticipated: _______________________________________________________________ • What is the receiving water for the wastewater discharge? __________________________________________________ v. If public facilities will not be used, describe plans to provide wastewater treatment for the project, including specifying proposed receiving water (name and classification if surface discharge or describe subsurface disposal plans): New________________________________________________________________________________________________________ sanitary sewer lines will be constructed throughout the newly constructed buildings and connect to the existing mouth in Erie Boulevard. (see EAF Narrative) ________________________________________________________________________________________________________ vi. Describe any plans or designs to capture, recycle or reuse liquid waste: _______________________________________________ There ________________________________________________________________________________________________________ are no plans at this time to capture, recycle, or reuse liquid waste.

________________________________________________________________________________________________________ e. Will the proposed action disturb more than one acre and create stormwater runoff, either from new point 9 Yes 9 No ✔ sources (i.e. ditches, pipes, swales, curbs, gutters or other concentrated flows of stormwater) or non-point source (i.e. sheet flow) during construction or post construction?

If Yes:

i. How much impervious surface will the project create in relation to total size of project parcel? 3.0Mil Square feet or _____ _____ 69 acres (impervious surface) _____ 3.0Mil Square feet or _____ 69 acres (parcel size) ii. Describe types of new point sources.The __________________________________________________________________________ application has assumed a worse case scenario of 100% impervious surface for the purpose of the initial stormwater calculations, with the assumption that the actual project will be less. _________________________________________________________________________________________________________ iii. Where will the stormwater runoff be directed (i.e. on-site stormwater management facility/structures, adjacent properties, groundwater, on-site surface water or off-site surface waters)?

on-site________________________________________________________________________________________________________ underground stormwater management structures ________________________________________________________________________________________________________ • If to surface waters, identify receiving water bodies or wetlands: ________________________________________________ ____________________________________________________________________________________________________ ____________________________________________________________________________________________________ • Will stormwater runoff flow to adjacent properties? 9 Yes ✔ 9 No iv. Does the proposed plan minimize impervious surfaces, use pervious materials or collect and re-use stormwater? ✔ 9 Yes 9 No f. Does the proposed action include, or will it use on-site, one or more sources of air emissions, including fuel 9 Yes 9 No ✔ combustion, waste incineration, or other processes or operations?

If Yes, identify:

i. Mobile sources during project operations (e.g., heavy equipment, fleet or delivery vehicles) _________________________________________________________________________________________________________ Delivery vehicles including tractor trailers.

ii. Stationary sources during construction (e.g., power generation, structural heating, batch plant, crushers) Portable________________________________________________________________________________________________________ crusher facility, temporary fossil fuel generators (6kw) iii. Stationary sources during operations (e.g., process emissions, large boilers, electric generation) ________________________________________________________________________________________________________ Miscellaneous natural gas generators and roof-top HVAC equipment e. Will the proposed action disturb more than one acre and create stormwater runoff, either from new point 9 Yes 9 No ✔ sources (i.e. ditches, pipes, swales, curbs, gutters or other concentrated flows of stormwater) or non-point source (i.e. sheet flow) during construction or post construction?

If Yes:

i. How much impervious surface will the project create in relation to total size of project parcel? 3.0Mil Square feet or _____ _____ 69 acres (impervious surface) _____ 3.0Mil Square feet or _____ 69 acres (parcel size) ii. Describe types of new point sources.The __________________________________________________________________________ application has assumed a worse case scenario of 100% impervious surface for the purpose of the initial stormwater calculations, with the assumption that the actual project will be less. _________________________________________________________________________________________________________ iii. Where will the stormwater runoff be directed (i.e. on-site stormwater management facility/structures, adjacent properties, groundwater, on-site surface water or off-site surface waters)?

on-site________________________________________________________________________________________________________ underground stormwater management structures ________________________________________________________________________________________________________ • If to surface waters, identify receiving water bodies or wetlands: ________________________________________________ ____________________________________________________________________________________________________ ____________________________________________________________________________________________________ • Will stormwater runoff flow to adjacent properties? 9 Yes ✔ 9 No iv. Does the proposed plan minimize impervious surfaces, use pervious materials or collect and re-use stormwater? ✔ 9 Yes 9 No f. Does the proposed action include, or will it use on-site, one or more sources of air emissions, including fuel 9 Yes 9 No ✔ combustion, waste incineration, or other processes or operations?

If Yes, identify:

i. Mobile sources during project operations (e.g., heavy equipment, fleet or delivery vehicles) _________________________________________________________________________________________________________ Delivery vehicles including tractor trailers.

ii. Stationary sources during construction (e.g., power generation, structural heating, batch plant, crushers) Portable________________________________________________________________________________________________________ crusher facility, temporary fossil fuel generators (6kw) iii. Stationary sources during operations (e.g., process emissions, large boilers, electric generation) ________________________________________________________________________________________________________ Miscellaneous natural gas generators and roof-top HVAC equipment g. Will any air emission sources named in D.2.f (above), require a NY State Air Registration, Air Facility Permit, 9 Yes ✔ 9 No or Federal Clean Air Act Title IV or Title V Permit? At this time the applicant does not anticipate needing any air emissions permits. If Yes:

i. Is the project site located in an Air quality non-attainment area? (Area routinely or periodically fails to meet 9 Yes ✔ 9 No ambient air quality standards for all or some parts of the year) ii. In addition to emissions as calculated in the application, the project will generate:

• ___________Tons/year TBD (short tons) of Carbon Dioxide (CO2) • ___________Tons/year N/A (short tons) of Nitrous Oxide (N2O) • ___________Tons/year N/A (short tons) of Perfluorocarbons (PFCs) • ___________Tons/year N/A (short tons) of Sulfur Hexafluoride (SF6) • ___________Tons/year TBD (short tons) of Carbon Dioxide equivalent of Hydroflourocarbons (HFCs) • ___________Tons/year N/A (short tons) of Hazardous Air Pollutants (HAPs) g. Will any air emission sources named in D.2.f (above), require a NY State Air Registration, Air Facility Permit, 9 Yes ✔ 9 No or Federal Clean Air Act Title IV or Title V Permit? At this time the applicant does not anticipate needing any air emissions permits. If Yes:

i. Is the project site located in an Air quality non-attainment area? (Area routinely or periodically fails to meet 9 Yes ✔ 9 No ambient air quality standards for all or some parts of the year) ii. In addition to emissions as calculated in the application, the project will generate:

• ___________Tons/year TBD (short tons) of Carbon Dioxide (CO2) • ___________Tons/year N/A (short tons) of Nitrous Oxide (N2O) • ___________Tons/year N/A (short tons) of Perfluorocarbons (PFCs) • ___________Tons/year N/A (short tons) of Sulfur Hexafluoride (SF6) • ___________Tons/year TBD (short tons) of Carbon Dioxide equivalent of Hydroflourocarbons (HFCs) • ___________Tons/year N/A (short tons) of Hazardous Air Pollutants (HAPs) h. Will the proposed action generate or emit methane (including, but not limited to, sewage treatment plants, 9 Yes ✔9 No landfills, composting facilities)?

If Yes:

i. Estimate methane generation in tons/year (metric): ________________________________________________________________ ii. Describe any methane capture, control or elimination measures included in project design (e.g., combustion to generate heat or electricity, flaring): ________________________________________________________________________________________ _________________________________________________________________________________________________________ i. Will the proposed action result in the release of air pollutants from open-air operations or processes, such as 9 Yes ✔ 9 No quarry or landfill operations?

If Yes: Describe operations and nature of emissions (e.g., diesel exhaust, rock particulates/dust): _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ h. Will the proposed action generate or emit methane (including, but not limited to, sewage treatment plants, 9 Yes ✔9 No landfills, composting facilities)?

If Yes:

i. Estimate methane generation in tons/year (metric): ________________________________________________________________ ii. Describe any methane capture, control or elimination measures included in project design (e.g., combustion to generate heat or electricity, flaring): ________________________________________________________________________________________ _________________________________________________________________________________________________________ i. Will the proposed action result in the release of air pollutants from open-air operations or processes, such as 9 Yes ✔ 9 No quarry or landfill operations?

If Yes: Describe operations and nature of emissions (e.g., diesel exhaust, rock particulates/dust): _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ j. Will the proposed action result in a substantial increase in traffic above present levels or generate substantial 9 Yes 9 No ✔ new demand for transportation facilities or services?

If Yes:

i. When is the peak traffic expected (Check all that apply): † ✔ Morning † Evening ✔ †Weekend ✔ † Randomly between hours of __________ to ________.

ii. For commercial activities only, projected number of truck trips/day and type (e.g., semi trailers and dump trucks): _____________ ________________________________________________________________________________________________________ Based on the change of use, the Applicant anticipates a net reduction in truck traffic from the operation of Shoppingtown Mall (see EAF Narrative). j. Will the proposed action result in a substantial increase in traffic above present levels or generate substantial 9 Yes 9 No ✔ new demand for transportation facilities or services?

If Yes:

i. When is the peak traffic expected (Check all that apply): † ✔ Morning † Evening ✔ †Weekend ✔ † Randomly between hours of __________ to ________.

ii. For commercial activities only, projected number of truck trips/day and type (e.g., semi trailers and dump trucks): _____________ ________________________________________________________________________________________________________ Based on the change of use, the Applicant anticipates a net reduction in truck traffic from the operation of Shoppingtown Mall (see EAF Narrative). iii. Parking spaces: Existing ___________________ 4,703 Proposed ___________ 4,105 decrease of 598 Net increase/decrease _____________________ iv. Does the proposed action include any shared use parking? ✔ Yes No v. If the proposed action includes any modification of existing roads, creation of new roads or change in existing access, describe: A new________________________________________________________________________________________________________ street network will be developed to support the new mixed-use neighborhood (see EAF Narrative and Appendix L). vi. Are public/private transportation service(s) or facilities available within ½ mile of the proposed site? 9 Yes 9 No ✔ vii Will the proposed action include access to public transportation or accommodations for use of hybrid, electric 9 Yes 9 No ✔ or other alternative fueled vehicles? The applicant intends to incorporate transit accomodations as well as electric vehicle charging facilities. viii. Will the proposed action include plans for pedestrian or bicycle accommodations for connections to existing 9 Yes 9 No ✔ pedestrian or bicycle routes?

iii. Parking spaces: Existing ___________________ 4,703 Proposed ___________ 4,105 decrease of 598 Net increase/decrease _____________________ iv. Does the proposed action include any shared use parking? ✔ Yes No v. If the proposed action includes any modification of existing roads, creation of new roads or change in existing access, describe: A new________________________________________________________________________________________________________ street network will be developed to support the new mixed-use neighborhood (see EAF Narrative and Appendix L). vi. Are public/private transportation service(s) or facilities available within ½ mile of the proposed site? 9 Yes 9 No ✔ vii Will the proposed action include access to public transportation or accommodations for use of hybrid, electric 9 Yes 9 No ✔ or other alternative fueled vehicles? The applicant intends to incorporate transit accomodations as well as electric vehicle charging facilities. viii. Will the proposed action include plans for pedestrian or bicycle accommodations for connections to existing 9 Yes 9 No ✔ pedestrian or bicycle routes?