clayny.news

AI for transparency
Clay, New York · Friday, November 6, 2026· Nov 6, 2026
Public Records › Town of Clay › Micron filing

Planning Board Presentation - Rail Spur 09-24-2025

Catalog date 2025-09-24 · PDF · 302 words · catalog collection 2026-08-07 Official copy↗ Plain text Mentions

Text index: 19 passages across 11 pages with extracted text; 19 passages have semantic vectors. Pages with any indexed text may still contain unextracted scanned content. Complete page coverage has not been verified. No verified archived PDF is available. Failed captures are not served as archived PDFs.

No recorded acquisition check; current official availability unknown. Recorded acquisition check: not recorded. This is not a live source availability check.

Document type unverified. Event date unknown. Issue date unknown. Catalog date: 2025-09-24.
Background page processing · status is stale

0 jobs match the current original: 0 queued, processing or awaiting import; 0 awaiting page review; 0 held; 0 with machine text indexed. Machine recognition can contain errors. Indexed text and complete page extraction are different states.

Status received: 2026-11-06T15:36:13.977898+00:00. Producer observation: 2026-11-06T15:35:19.820010+00:00. These are processing observations, not document issue dates.

Search index status: success. Last checked: 2026-11-06T15:35:08.618462+00:00. Last successful check: 2026-11-06T15:35:19.816965+00:00.

Typeset from the PDF of the official document — extraction method is not certified for this historical record; headings, motions and recorded votes are detected automatically, so spacing may differ from the original. The official copy governs.

Contents · 6 sections
  1. RAIL SPUR FACILITY
  2. B&B ENGINEERS & GEOLOGISTS OF NEW YORK
  3. DESCRIPTION OF PROPOSED RAIL SPUR
  4. DESCRIPTION OF OPERATIONS
  5. B&B ENGINEERS & GEOLOGISTS OF NEW YORK 9
  6. QUESTIONS AND DISCUSSION

RAIL SPUR FACILITY

Town of Clay Planning Board Meeting

RAILWORKS

1

B&B ENGINEERS & GEOLOGISTS OF NEW YORK

Purpose of Proposed Rail Spur Facility

Location Description of Proposed Rail Spur Description of Operations Questions and Discussion

RAILWORKS

2

B&B ENGINEERS & GEOLOGISTS OF NEW YORK

Construct and Operate Rail Spur to Receive Stone Aggregate Materials PURPOSE Convey Aggregate to Adjacent Parcel(s) for Construction Minimize Environmental Impact from Truck Traffic

RAILWORKS

3

B&B ENGINEERS & GEOLOGISTS OF NEW YORK

LOCATION

N

RAILWORKS

4

B&B ENGINEERS & GEOLOGISTS OF NEW YORK

DESCRIPTION OF PROPOSED RAIL SPUR

• Rail Siding • Rail Yard • Offloading Facilities • Conveyance System • Locomotive Shed • Emergency Aggregate Stockpile • Access Roads • Stormwater Management Facilities

RAILWORKS

5

B&B ENGINEERS & GEOLOGISTS OF NEW YORK

DESCRIPTION OF PROPOSED RAIL SPUR

• Parcels: 046.- 02 - 03.2 and 046.- 01 - 19.1 • Property Acreage - 38.24 +/- acres • Area of Disturbance – 25.9 +/- acres • New Impervious Area - 14.4 +/- acres • Undisturbed Natural Areas Maintained – 12.6 +/- acres

RAILWORKS

6

B&B ENGINEERS & GEOLOGISTS OF NEW YORK

DESCRIPTION OF OPERATIONS

Number of Employees – Up to 18 Hours of Operation

24 Hours per Day, Sunday through Saturday,

Including Holidays Rail Yard Operating – 6 am to 10 pm Conveyors Operating – 6 am to 10 pm Maintenance – 10 pm to 6 am

RAILWORKS

7

B&B ENGINEERS & GEOLOGISTS OF NEW YORK

RAILWORKS

8

B&B ENGINEERS & GEOLOGISTS OF NEW YORK

DESCRIPTION OF OPERATIONS

• Rail Car Offloading System • Grasshopper Conveyors • Over-the-Road Conveyor • Overland Conveyor • Radial Stacking Conveyor

RAILWORKS

B&B ENGINEERS & GEOLOGISTS OF NEW YORK 9

RAILWORKS

10

B&B ENGINEERS & GEOLOGISTS OF NEW YORK

QUESTIONS AND DISCUSSION

Questions?

RAILWORKS

11

B&B ENGINEERS & GEOLOGISTS OF NEW YORK

Same source Micron Project Schedule 09-09-2025 · 2025-09-09