Eastern Branch Parallel Transmission Main Design Phase: Sept. 2026 - Nov. 2027 Design Phase work includes: • site observation/utility marking • land surveying and staking • soil boring and subsurface investigation • archaeological surveying (hand digging) • brush clearing and temporary access creation. Micron Great Northern Mall
Facility Henry Clay Boulevard Maple Road The new Construction transmission main Phase work is To contact OCWA (shown in red) projected from Email: projects@ocwa.org will run parallel to Dec. 2027 to Phone: 315-455-7061, Ext. 3159 the existing main. Jan. 2031 © OpenStreetMap contributors [Machine extraction from original PDF page 1; PP-OCRv6 medium; recognition errors possible; source SHA256 804a1ccb2ed8b6652099bde797d4fbaf9f194698ccea7a3d5082af7da8697898; automatically indexed RAW MACHINE TEXT; unreviewed; errors possible; coverage unverified] Eastern Branch Parallel Transmission Main Design Phase: Sept. 2026 - Nov. 2027 Design Phase work includes:
site observation/utility marking land surveying and staking soil boring and subsurface investigation archaeological surveying (hand digging) brush clearing and temporary access creation.
Verplank Road Micron Great Northern Mall Burnet Road State Route 31 31 State Route 31
31 Caughdenoy Road Facility Henry Clay Boulevard Maple Road 481 Stearns Road The new Construction transmission main Phase work is To contact OCWA (shown in red) projected from Email: projects@ocwa.org will run parallel to Dec. 2027 to Phone: 315-455-7061, Ext. 3159 the existing main.
Jan. 2031 Central New York's Water Authority © OpenStreetMap contributors