clayny.news

AI for transparency
Clay, New York · Friday, November 6, 2026· Nov 6, 2026
Public Records › Town of Clay › Public notice

OCWA Eastern Branch MAP

Document date unknown · PDF · 224 words · catalog collection 2026-09-22 Official copy↗ Archived PDF Plain text Mentions

Text index: 3 passages across 1 pages with extracted text; 3 passages have semantic vectors. Pages with any indexed text may still contain unextracted scanned content. Complete page coverage has not been verified.

Recorded original custody binding; reader verifies archived-copy availability separately. Recorded acquisition check: 2026-10-16T21:14:32.291485+00:00. This is not a live source availability check.

Document type unverified. Event date unknown. Issue date unknown.
Background page processing · status is stale

0 jobs match the current original: 0 queued, processing or awaiting import; 0 awaiting page review; 0 held; 0 with machine text indexed. Original PDF: 1 pages; 0 native indexed, 1 raw machine indexed/unreviewed, 0 queued, 0 held/pending failures, 0 uninspected. Exact transcription completeness is unverified.

Status received: 2026-11-06T07:36:14.215909+00:00. Producer observation: 2026-11-06T07:35:19.765553+00:00. These are processing observations, not document issue dates.

Search index status: success. Last checked: 2026-11-06T07:35:05.928051+00:00. Last successful check: 2026-11-06T07:35:19.762315+00:00.

Typeset from the PDF of the official document — extraction method is not certified for this historical record; headings, motions and recorded votes are detected automatically, so spacing may differ from the original. The official copy governs.

Eastern Branch Parallel Transmission Main Design Phase: Sept. 2026 - Nov. 2027 Design Phase work includes: • site observation/utility marking • land surveying and staking • soil boring and subsurface investigation • archaeological surveying (hand digging) • brush clearing and temporary access creation. Micron Great Northern Mall

OCWA

Facility Henry Clay Boulevard Maple Road The new Construction transmission main Phase work is To contact OCWA (shown in red) projected from Email: projects@ocwa.org will run parallel to Dec. 2027 to Phone: 315-455-7061, Ext. 3159 the existing main. Jan. 2031 © OpenStreetMap contributors [Machine extraction from original PDF page 1; PP-OCRv6 medium; recognition errors possible; source SHA256 804a1ccb2ed8b6652099bde797d4fbaf9f194698ccea7a3d5082af7da8697898; automatically indexed RAW MACHINE TEXT; unreviewed; errors possible; coverage unverified] Eastern Branch Parallel Transmission Main Design Phase: Sept. 2026 - Nov. 2027 Design Phase work includes:

site observation/utility marking land surveying and staking soil boring and subsurface investigation archaeological surveying (hand digging) brush clearing and temporary access creation.

Verplank Road Micron Great Northern Mall Burnet Road State Route 31 31 State Route 31

OCWA

31 Caughdenoy Road Facility Henry Clay Boulevard Maple Road 481 Stearns Road The new Construction transmission main Phase work is To contact OCWA (shown in red) projected from Email: projects@ocwa.org will run parallel to Dec. 2027 to Phone: 315-455-7061, Ext. 3159 the existing main.

Jan. 2031 Central New York's Water Authority © OpenStreetMap contributors