clayny.news

AI for transparency
Clay, New York · Friday, August 7, 2026· Aug 7, 2026
Public Records › OCIDA › ocida-meeting

4-9-26 OCIDA Regular Meeting Board Packet

Document date 2025-12-15 Collected 2026-08-07 Extracted text 13,775 words Format PDF
Official copy ↗ Archived copy Plain text (OCR) Search mentions
From Regular
Same source Regular · 2025-12-15
Same source Regular — OCIDA Recording · 2025-12-15
Same source 4-9-26 OCIDA Regular Meeting Agenda · 2025-12-15
Same source Regular — OCIDA Mtg Notice 4-9-26 · 2025-12-15

Machine-extracted (OCR) from the official document — formatting is approximate; the official copy governs.

335 MONTGOMERY STREET, FLOOR 2M, SYRACUSE, NY 13202
335 MONTGOMERY STREET, FLOOR 2M, SYRACUSE, NY 13202
                315.435.3770 • ECONOMICDEVELOPMENT@ONGOV.NET • ONGOVED.COM
                                     Regular Meeting Agenda
                                          April 9, 2026
Call to Order the Regular Meeting of the Agency
        A. Approval of Annual Meeting Minutes: March 5, 2026
        B. Approval of Regular Meeting Minutes: March 5, 2026
        C. Treasurer’s Report
        D. Payment of Bills
        E. Conflict of Interest
Action Items:
   1. Twin Ponds HB, LLC (Project #3101-25-02A) First Meeting
      The applicant is proposing to construct a residential community consisting of approximately
      309 multifamily units, a commercial space, and recreational areas in the Town of Manlius.
      Specific project amenities will include a well-equipped fitness center, a children’s play area, a
      dog park, a new dock, and a covered pavilion.
      Agency Action Requested:
         a. A resolution of the Board authorizing a public hearing.
       Representatives: Charlie Breuer, Twin Ponds HB, LLC, Managing Member
                        Brody Smith, Twin Ponds HB, LLC, Counsel
   2. National Grid – Easement Authorization
      The Agency wishes to grant easements to National Grid over portions of lands owned by the
      Agency for the purpose of building facilities to provide electric and gas services for the
      White Pine Commerce Park.
Agency Action Requested:
          a. A resolution of the Board authorizing the execution of an easement in connection
             with property located at White Pine Commerce Park for facilities to provide electric
             and gas services.
        Representative: Robert Petrovich, Executive Director
   3. White Pine Science & Technology Park
                                             Page 1 of 71
     Agency Action Requested:
        a. A resolution of the Board designating OCIDA as lead agency with respect to a
           coordinated review and determining to issue a Positive Declaration pursuant to the
           State Environmental Quality Review Act.
          b. A resolution of the Board finding that the draft Scoping Document is sufficient for
             public review, opening a thirty-day public comment period during which a public
             hearing will be held on April 30, 2026.
     Representative: Jeffrey Davis, Agency Counsel
Adjourn
                                           Page 2 of 71
                                   Annual Meeting Minutes
                                       March 5, 2026
An Annual meeting of the Onondaga County Industrial Development Agency was held on Thursday,
March 5, 2026, at 335 Montgomery Street, Floor 2M, Syracuse, New York.
Randy Wolken called the meeting to order at 8:30 AM with the following in attendance:
PRESENT:
Randy Wolken
Elizabeth Dreyfuss
Leslie English
Alan Marzullo
Mark Muthumbi
ABSENT:
Cydney Johnson
Garard Grannell
ALSO PRESENT:
Robert Petrovich, Executive Director
Nate Stevens, Treasurer
Alexis Rodriguez, Secretary
Robert Schoeneck, Assistant Treasurer
Evan Carter, Office of Economic Development
Jeffrey Davis, Esq., Agency Counsel
Amanda Fitzgerald, Esq., Agency Counsel
Approval of Meeting Minutes: March 6, 2025
Upon motion by Alan Marzullo, seconded by Elizabeth Dreyfuss, the Board approved the Annual
meeting minutes of March 6, 2025. Motion was carried.
Action Items:
   1. Board Appointments
       Randy Wolken read the Agency Action requested, “A resolution of the Board appointing
       Elizabeth Dreyfuss as Vice Chair.” Motion was made by Leslie English, seconded by Mark
       Muthumbi. Motion was carried.
                                           Page 3 of 71
2. Slate of Board Members for the 2026 Agency Fiscal Year
   Randy Wolken, Chair
   Elizabeth Dreyfuss, Vice Chair
   Leslie English
   Cydney Johnson
   Garard Grannell
   Alan Marzullo
   Mark Muthumbi
   The Slate of Board Members was reviewed.
3. Slate of Committee Members for the 2026 Agency Fiscal Year
   Audit Committee
   Leslie English, Chair
   Cydney Johnson
   Alan Marzullo
   Governance Committee
   Elizabeth Dreyfuss, Chair
   Garard Grannell
   Randy Wolken
   Finance Committee
   Randy Wolken, Chair
   Elizabeth Dreyfuss
   Mark Muthumbi
   The Slate of Committee Members was reviewed.
4. 2025 Internal Controls Report
Alexis Rodriguez noted to the Board that per the Authority’s Budget Office (ABO), the
   Agency is required to have an Internal Controls Report to measure how the Agency has done
   throughout the current year.
   A. Rodriguez advised that the Agency staff believes that they have met all the requirements
   in the report adequately.
   Randy Wolken read the Agency Action requested, “A resolution of the Board to approve the
   Agency’s 2025 Internal Controls Report.” Motion was made by Alan Marzullo, seconded by
   Elizabeth Dreyfuss. Motion was carried.
                                       Page 4 of 71
   5. 2025 Operations & Accomplishments Report
       A. Rodriguez noted that this report explains what the Agency has done in 2025
       regarding projects that are currently pending, projects that have closed, ongoing
       developments, and outreach.
       Randy Wolken commented that it was a busy year.
       Randy Wolken read the Agency Action requested, “A resolution of the Board to approve the
       Agency’s 2025 Operations & Accomplishments Report.” Motion was made by Leslie
       English, seconded by Elizabeth Dreyfuss. Motion was carried.
   6. 2025 Performance Measurement Report
       A. Rodriguez noted that this report lays out the performance goals of the Agency for 2025
       and how they were met. The report also includes the public meetings held for the year.
       Randy Wolken commented that the Agency was highly successful.
Randy Wolken read the Agency Action requested, “A resolution of the Board to approve the
       Agency’s 2025 Performance Measurement Report.” Motion was made by Mark Muthumbi,
       seconded by Alan Marzullo. Motion was carried.
   7. 2025 Real Property Report
       A. Rodriguez noted that the ABO requires the Agency to generate a report of the properties
       that the Agency owns. A. Rodriguez advised that the majority of properties that the Agency
       owns are on the White Pine Commerce Park, and there are a few properties on Hiawatha
       Blvd. that are the Roth Steel site.
       Randy Wolken read the Agency Action requested, “A resolution of the Board to approve the
       Agency’s 2025 Real Property Report.” Motion was made by Alan Marzullo, seconded by
       Leslie English. Motion was carried.
Motion to adjourn was made by Elizabeth Dreyfuss and seconded by Alan Marzullo at 8:35 AM.
___________________________________
      Alexis Rodriguez, Secretary
                                            Page 5 of 71
                                   Regular Meeting Minutes
                                        March 5, 2026
A Regular meeting of the Onondaga County Industrial Development Agency was held on Thursday,
March 5, 2026, at 335 Montgomery Street, Floor 2M, Syracuse, New York.
Randy Wolken called the meeting to order at 8:41 AM with the following in attendance:
PRESENT:
Randy Wolken
Elizabeth Dreyfuss
Alan Marzullo
Mark Muthumbi
Leslie English
ABSENT:
Cydney Johnson
Garard Grannell
ALSO PRESENT:
Robert Petrovich, Executive Director
Nate Stevens, Treasurer
Alexis Rodriguez, Secretary
Robert Schoeneck, Assistant Treasurer
Evan Carter, Assistant Secretary
Jeffrey Davis, Esq., Agency Counsel
Amanda Fitzgerald, Esq., Agency Counsel
Mike Lisson, Agency Auditor
Brianah Lane, Agency Auditor
Patrick Rock, Jordan Landing LLC and Jordan Landing Housing Development Fund Corporation
(via Zoom)
Approval of Meeting Minutes: December 11, 2025
Upon motion by Elizabeth Dreyfuss, seconded by Leslie English, the Board approved the Regular
meeting minutes of December 11, 2025. Motion was carried.
Approval of Meeting Minutes: January 8, 2026
Upon motion by Alan Marzullo, seconded by Leslie English, the Board approved the Regular
meeting minutes of January 8, 2026. Motion was carried.
                                           Page 6 of 71
Treasurer’s Report:
Nate Stevens gave a brief overview of the Treasurer’s Report for the month of February 2026.
Upon motion by Alan Marzullo, seconded by Mark Muthumbi, the Board approved the Treasurer’s
Report for the month of February 2026. Motion was carried.
Payment of Bills:
Nate Stevens gave a brief overview of the Payment of Bills.
N. Stevens highlighted the PILOT payments totaling over $7 million to local municipalities.
Robert Petrovich affirmed that $7.85 million is significant to highlight.
Upon motion by Elizabeth Dreyfuss, seconded by Leslie English, the Board approved the Payment of
Bills. Motion was carried.
Action Items:
    1. 2025 Agency Audit
        R. Petrovich noted that the Audit Committee had made a recommendation to accept the 2025
        Agency Audit.
        Randy Wolken read the Agency action requested, “A resolution of the Board approving the
        2025 Audit of the Agency.” Motion was made by Elizabeth Dreyfuss, seconded by Alan
        Marzullo. Motion was carried.
    2. Jordan Landing LLC and Jordan Landing Housing Development Fund Corporation
       (Project #3101-25-07A)
       The applicant is proposing to construct 65 mixed-income housing units on approximately 8
       acres of currently vacant land in the Village of Jordan. The project includes a community
       room, fitness area, supporting housing services, offices, and laundry facilities.
Jeffrey Davis explained that this project had been put before the Board previously and the
        application was accepted and a public hearing was authorized. While doing the Agency’s
        review, Agency counsel noticed that at the local level, they conducted an uncoordinated
        SEQR review, meaning that the Agency was not a part of the review. He explained that in
        order for the Board to act, the Agency needs to do its own SEQR determination. In doing so,
                                              Page 7 of 71
   the Agency has concluded that it is a Type I Action under SEQR, requiring a coordinated
   review of the agencies that have not already looked at the review.
   J. Davis advised that the action in front of the Board is one to declare the Agency’s intent to
   be Lead Agency under SEQR. If the action is approved, notices would be sent to all other
   involved agencies. They will have 30 days to respond if they agree with OCIDA being Lead
   Agency. After this, OCIDA will be able to move forward with a SEQR determination that all
   other involved agencies will be bound by.
   R. Petrovich noted for the Board’s edification that there was a public hearing held, and the
   project will need to come before the Board again for the approval of benefits.
   Mark Muthumbi questioned whether the feedback from the public hearing is pertinent to this
   action.
R. Petrovich explained that the Agency understands that there is a communication breakdown
   between the Applicant and the localities (School District, Town, and Village). His
   understanding is that the Applicant and the localities are engaging currently and working
   through the issues to better understand the project. In addition to that, the Agency staff is
   working through the issues regarding the incentives. The Agency has not determined a final
   incentive proposal yet. The Agency is encouraging the Applicant to engage with the
   localities to help them understand the incentives proposed and why they’re needed.
   Mark Muthumbi noted that there seemed to be general support for the project, but there was
   concern over the transparency of communication.
   J. Davis stated that it’s important to note that the project has already been approved at the
   local level and received zoning approval prior to the submission of an OCIDA application.
   Amanda Fitzgerald noted that the Applicant could procedurally continue with the proposed
   project by zoning standards, but they submitted an application to the Agency stating that but
   for the benefits, the project could not move forward.
Randy Wolken read the Agency action requested of, “A resolution of the Board declaring the
   project a Type I action under SEQRA and the Agency’s intent to be Lead Agency for a
   coordinated environmental review.” Motion was made by Mark Muthumbi, seconded by
   Elizabeth Dreyfuss. Motion was carried.
3. White Pine Science & Technology Park EAF
                                         Page 8 of 71
   R. Petrovich explained that this item is relating to property that the Agency owns, the White
   Pine Science & Technology Park, which is directly south of the Micron campus at the
   intersection of Rt. 31 and Caughdenoy Rd. The property is the southeast corner that is
   roughly 106 acres. He stated that the Agency is looking to develop the site in support of the
   Micron project in order to enhance the ability of supply chain companies to locate proximal
   to the Micron campus.
   R. Petrovich advised that this action would be the first step of being able to advance the site
   for environmental review under SEQR, which is necessary to advance the development of the
   site for supply chain companies. The Agency has completed an EAF that has been proposed
   to the Board. The Agency needs approval of the proposed EAF in order to keep the process
   moving forward.
J. Davis noted that this action will involve the Agency declaring their intent to be Lead
   Agency for a Type I coordinated review under SEQR. The first step is to send out notices to
   all the interested and involved agencies that have been identified in the EAF. If the Board
   approves this action, the notices will be sent out and those agencies will have 30 days to
   respond.
   Randy Wolken read the Agency action requested, “A resolution of the Board declaring the
   project a Type I action under SEQRA and the Agency’s intent to be Lead Agency for a
   coordinated environmental review.” Motion was made by Alan Marzullo, seconded by Leslie
   English. Motion was carried.
4. Town of Dewitt Real Property Purchase and Development Request for Proposals
   The Agency is proposing to issue a request for proposals for the purchase and development of
   the certain real property in the Town of Dewitt.
   R. Petrovich noted that the Agency took an assignment of the OHB Redev contract before the
   end of 2025, and just closed on the contract with the County earlier in the week.
   R. Petrovich stated the only outstanding issues that remain for this property are associated
   with the Macy’s parcel that is owned by Benderson Development, which the Agency is
   currently working towards acquiring by the Eminent Domain Procedure Law.
R. Petrovich noted that now that the landscape has changed with Micron’s groundbreaking,
   the Agency believes that this property is prime for redevelopment as the County Executive
   stated in the news that morning. The hope is that not only will elements of the OHB Redev
                                         Page 9 of 71
   concept advance, but also light manufacturing, office, and supply chain related activities that
   will complement the area.
   R. Petrovich advised that the Agency staff has briefed the Board thoroughly on the RFP and
   the Agency will be finalizing the proposal following the meeting.
   R. Petrovich noted that the final version of the RFP will not be substantially different from
   the one that was reviewed with the Board members previously, noting only minor changes
   made. The RFP will be released on Monday.
   R. Petrovich stated that the Agency is excited about this opportunity to advance the
   development of the site. He advised that he’s hopeful that the Agency will receive good
   responses and the Board will reconvene in the next couple of months to make a
   recommendation and award a contract.
   Elizabeth Dreyfuss commented that this has been a long process and it’s exciting getting to
   this stage. She noted that the community will appreciate the movement forward.
   R. Petrovich pointed out that Elizabeth Dreyfuss has been here for every part of this
   redevelopment.
Randy Wolken read the Agency action requested, “A resolution of the Board authorizing the
   issuance of a request for proposals for the purchase and development of certain real property
   in the Town of Dewitt.” Motion was made by Elizabeth Dreyfuss, seconded by Alan Marzullo.
   Motion was carried.
5. Micron New York Semiconductor Manufacturing LLC (Project #3101-23-07A)
   Micron New York Semiconductor Manufacturing LLC is requesting an extension of the
   termination date of their sales and use tax exemption.
   R. Petrovich advised that the Board took an action in November to grant a four-year time
   term for the sales and use tax benefit that was approved for the Micron project. One of the
   things that has come out of the communications of the Agency and Micron is that getting
   Fabs 1 & 2 online will take approximately 9-10 years. As a result of that, Micron has
   requested that the term of the sales and use tax benefit be extended out to that time horizon.
   R. Petrovich stated that under consultation with counsel and research with the ABO, this is
   not an issue, as Micron is not asking for an increase in the benefit amount. He recalled that
   this is not an uncommon action for the Board to grant these extensions.
   R. Petrovich noted that his recommendation to the Board is to grant this extension in support
   of the project.
                                        Page 10 of 71
   Randy Wolken commented that he finds this request to be very reasonable.
J. Davis noted that this time schedule aligns with the construction schedule that was laid out
   in their original application that was approved by the Board. This action would be aligning
   the application and the benefits that were approved at the time with that schedule.
   Randy Wolken read the Agency action requested, “A resolution of the Board authorizing an
   extension of the sales and use tax exemption of Micron New York Semiconductor
   Manufacturing LLC.” Motion was made by Alan Marzullo, seconded by Mark Muthumbi.
   Motion was carried.
6. Review and Acceptance of the Agency’s Policies and Bylaws
   1. Defense and Indemnification Policy
   2. Whiteblower Policy
   3. Credit and Loan Policy
   4. Code of Ethics and Conflict of Interest Policy
   5. Compensation, Reimbursement and Attendance Policy
   6. Local Access Policy
   7. Investment Policy
   8. Travel Policy
   9. Procurement Policy
   10. Property Disposition Policy
   11. Real Property Acquisition Policy
   Alexis Rodriguez noted that as discussed in the Governance Committee meeting, the policies
   were revised in January 2025, and since then no changes have been made.
   Randy Wolken read the Agency action requested of “A resolution of the Board accepting the
   Agency’s policies and bylaws.” Motion was made by Elizabeth Dreyfuss, seconded by
   Leslie English. Motion was carried.
7. Review and Acceptance of Committee Charters
   A. Rodriguez noted that no changes have been made to the Charters.
Randy Wolken read the Agency action requested of “A resolution of the Board accepting the
   Governance and Audit Committee Charters.” Motion was made by Alan Marzullo, seconded
   by Elizabeth Dreyfuss. Motion was carried.
                                        Page 11 of 71
   8. Executive Session
       J. Davis requested to enter into Executive Session for the purpose of discussing proposed
       acquisitions or sale of real property.
       Motion to enter Executive Session was made by Leslie English, seconded by Alan Marzullo.
       Motion to come out of Executive Session was made by Elizabeth Dreyfuss, seconded by
       Alan Marzullo.
Motion to adjourn was made by Alan Marzullo and seconded by Elizabeth Dreyfuss at 9:18 AM.
___________________________________
      Alexis Rodriguez, Secretary
                                           Page 12 of 71
                                   March 31, 2026
    Revenue / Expense / Income             Current Period         Current YTD
Operating/Non-Op Revenue                                60,657        10,817,937
Administrative Expense                                  70,526          212,644
Operating/Program Expense                              121,120          387,538
Net Ordinary Income                                   (130,989)       10,217,755
Current Assets                           Current YTD
Total Cash                                                            18,923,421
Less Pass Through Received                                                      -
Net Cash                                                              18,923,421
                                     Page 13 of 71
                                               Statement of Activity
                             Onondaga County Industrial Development Agency
                                                   March 1-31, 2026
                                                                                          TOTAL
Revenue
 500 Operating Revenue
  2410 Lease Income                                                                     12,073.64
 Total for 500 Operating Revenue                                                       $12,073.64
 501 Non-Operating Revenue
  2401 Interest Income                                                                  48,582.93
 Total for 501 Non-Operating Revenue                                                   $48,582.93
 534 Pilot & Pass Thru Revenue
  529 PILOT Income                                                                      36,441.12
 Total for 534 Pilot & Pass Thru Revenue                                               $36,441.12
 550 WPCP Pass Thru Revenue                                                            127,451.11
Total for Revenue                                                                     $224,548.80
Gross Profit                                                                          $224,548.80
Expenditures
 6400 Operating Expense
  6406 Other Professional Services
   6406.50 Consulting Services                                                           6,000.00
  Total for 6406 Other Professional Services                                            $6,000.00
  6407 Administrative Expense                                                           70,525.90
  6409 Conference Attendence                                                             2,477.47
  6410 Office Expense                                                                      260.34
  6411 Memberships / Sponsorships                                                        7,175.00
  6414 Marketing                                                                        12,243.00
 Total for 6400 Operating Expense                                                      $98,681.71
 6440 Legal Fees
  6450 Barclay Damon
   6460 IDA General Legal                                                                1,367.50
   6480 Roth Legal                                                                          30.00
  Total for 6450 Barclay Damon                                                          $1,397.50
 Total for 6440 Legal Fees                                                              $1,397.50
 6500 Agency Program Expenses
  6510 White Pine Commerce Park
   6510.3 Legal                                                                         15,773.91
   6510.7 WPCP Marketing                                                                 1,659.74
  Total for 6510 White Pine Commerce Park                                              $17,433.65
  6530 800 Hiawatha Blvd. West
   6530.3 Engineering                                                                   33,690.71
  Total for 6530 800 Hiawatha Blvd. West                                               $33,690.71
  6540 3649 Erie Blvd E
   6540.5 Legal                                                                         24,687.00
  Total for 6540 3649 Erie Blvd E                                                      $24,687.00
 Total for 6500 Agency Program Expenses                                                $75,811.36
Page 14 of 71
                                 Accrual Basis Friday, April 03, 2026 05:36 PM GMTZ           1/2
                                              Statement of Activity
                            Onondaga County Industrial Development Agency
                                                  March 1-31, 2026
                                                                                           TOTAL
6514 White Pine Science & Technology Park p. 15
6514 White Pine Science & Technology Park
  6514.2 Engineering                                                                    11,399.00
 Total for 6514 White Pine Science & Technology Park                                   $11,399.00
 6600 Non-Operating Expenses
  6605 Pilot & Pass Thru Expenses                                                   $1,060,659.90
   6607 Micron - Pass Thru                                                               1,062.50
  Total for 6605 Pilot & Pass Thru Expenses                                         $1,061,722.40
 Total for 6600 Non-Operating Expenses                                              $1,061,722.40
 6610 WPCP Pass Thru Expenses
  6610.6 Barton & Loguidice                                                              4,356.00
 Total for 6610 WPCP Pass Thru Expenses                                                 $4,356.00
Total for Expenditures                                                              $1,253,367.97
Net Operating Revenue                                                               -$1,028,819.17
Net Other Revenue
Net Revenue                                                                         -$1,028,819.17
                                                   Page 15 of 71
                               Accrual Basis Friday, April 03, 2026 05:36 PM GMTZ              2/2
Statement of Financial Position
                             Onondaga County Industrial Development Agency
                                                 As of Mar 31, 2026
                                                                                            TOTAL
Assets
 Current Assets
  Bank Accounts
  200.6 NBT OCIDA Savings                                                              7,505,966.26
  200.7 NBT - WPCP Savings                                                            10,020,403.08
  200 Cash                                                                                    $0.00
   200.5 NBT Checking                                                                  1,397,051.58
  Total for 200 Cash                                                                  $1,397,051.58
 Total for Bank Accounts                                                             $18,923,420.92
 Accounts Receivable
 380 Accounts Rec.
  380.6 A/R Fees, Lease & PILOT                                                         535,792.54
 Total for 380 Accounts Rec.                                                           $535,792.54
 Total for Accounts Receivable                                                         $535,792.54
 Other Current Assets
 480 Prepaid Expenses
  480.4 Credit Balance on Card                                                            -1,473.67
 Total for 480 Prepaid Expenses                                                          -$1,473.67
 Total for Other Current Assets                                                          -$1,473.67
 Total for Current Assets                                                            $19,457,739.79
 Fixed Assets
  100 Land
   101 White Pines Commerce Park                                                         -$1,659.44
    101.2 WPCP Legal                                                                       9,177.00
    101.3 Engineering Services                                                                $0.00
     101.4 Environmental/Demo Services                                                       110.00
    Total for 101.3 Engineering Services                                                   $110.00
  Total for 101 White Pines Commerce Park                                                 $7,627.56
  105 3649 Erie Blvd East                                                             13,615,469.14
  107 800 Hiawatha                                                                       604,840.42
  108 White Pine Science & Technology Park                                             2,140,557.00
 Total for 100 Land                                                                  $16,368,494.12
 104 Machinery & Equipment
  104.1 Office Furniture                                                                   2,076.11
  104.2 Equipment                                                                          4,589.00
 Total for 104 Machinery & Equipment                                                      $6,665.11
  211 A/D Office Furniture                                                                -6,018.00
  250 Investment in Real Property                                                     30,756,703.00
 Total for Fixed Assets                                                              $47,125,844.23
Page 16 of 71
                                Accrual Basis Friday, April 03, 2026 05:31 PM GMTZ              1/2
                                         Statement of Financial Position
                                  Onondaga County Industrial Development Agency
                                                     As of Mar 31, 2026
                                                                                                TOTAL
 Other Assets
  240 Blue Sky Redevelopment                                                                   1,641.76
 Total for Other Assets                                                                       $1,641.76
Total for Assets                                                                         $66,585,225.78
Liabilities and Equity
 Liabilities
  Current Liabilities
   Accounts Payable
    300 WPCP Pass Thru Payable                                                                 4,365.44
   Total for Accounts Payable                                                                 $4,365.44
  Other Current Liabilities
  600 Accounts Payable                                                                            $0.00
   600.1 Due to Related Party - OED                                                           88,010.48
   600.209 Syracuse Rail Overpayment                                                             500.00
   600.3 Onondaga County Loan                                                            $28,079,656.77
    600.31 Accrued Interest - OC Note Payable                                              3,095,059.00
   Total for 600.3 Onondaga County Loan                                                  $31,174,715.77
    600.4 Micron Deposit                                                                     244,694.54
   Total for 600 Accounts Payable                                                        $31,507,920.79
  Total for Other Current Liabilities                                                    $31,507,920.79
  Total for Current Liabilities                                                          $31,512,286.23
  Long-term Liabilities
   600.5 Onondaga County Loan - Non WPCP                                                  11,075,298.64
  Total for Long-term Liabilities                                                        $11,075,298.64
 Total for Liabilities                                                                   $42,587,584.87
 Equity
  3901 Equity-Investment Fixed Assets                                                      2,345,838.63
  463 Reserve For Contracts                                                                  368,811.84
  465 Equity - Unreserved                                                                      4,017.16
  3900 Equity Unreserved                                                                  10,678,874.55
  Net Income                                                                              10,600,098.73
 Total for Equity                                                                        $23,997,640.91
Total for Liabilities and Equity                                                         $66,585,225.78
Page 17 of 71
                                    Accrual Basis Friday, April 03, 2026 05:31 PM GMTZ              2/2
ONONDAGA COUNTY INDUSTRIAL DEVELOPMENT AGENCY p. 18
ONONDAGA COUNTY INDUSTRIAL DEVELOPMENT AGENCY
   PAYMENT OF BILLS - SCHEDULE #515
   April 9, 2026
GENERAL EXPENSES p. 18
GENERAL EXPENSES
1. ONONDAGA COUNTY PLANNING FEDERATION*                                           $          340.00
   2026 Planning Symposium
2. MACNY, THE MANUFACTURERS ASSOCIATION**                                         $         1,175.00
   2025 Membership
3. ONONDAGA COUNTY TREASURER***                                                   $     2,501,849.32
   Purchase of Tax Parcel #063.-01-02.3
4. BARTON & LOGUIDICE                                                             $         2,660.50
   WPSTP - Inv #160118
5. LOVELL AND ASSOCIATES                                                          $         3,000.00
   March 2026 Consulting
6. SELECTIVE                                                                      $       41,402.50
   Insurance - 3649 Erie Blvd
7. HAYLOR FREYER & COON, INC.                                                     $       93,375.00
   Insurance - 3649 Erie Blvd
8 BARCLAY DAMON LLP                                                               $       23,138.44
   OCIDA - Shoppingtown - Inv #5383633
9 BARCLAY DAMON LLP                                                               $         1,816.50
   WPSTP - Inv #5383635
10 BARCLAY DAMON LLP                                                              $          810.00
   Retained Corporate & Public Finance Matters - Inv #5383636
9 BARCLAY DAMON LLP                                                               $         1,461.00
   Site 31 - Inv #5383639
10 BARCLAY DAMON LLP                                                              $         2,335.00
   Micron Retained OCIDA Support - Inv #5383631
11. BARCLAY DAMON LLP                                                             $          152.50
   Micron - EDPL Utility Easements - Inv #5383634
12. BARCLAY DAMON LLP                                                             $       39,642.00
   Neighbors for a Better Micron - Inv #5383630
13. NEW YORK STATE ECONOMIC DEVELOPMENT COUNCIL                                   $         2,300.00
   Conference Registration
14. ONONDAGA COUNTY WATER AUTHORITY                                               $           52.31
   8538 Caughdenoy Road
15. LEONARD RAUCH                                                                 $          676.38
   Conference Expenses
16. ROBET PETROVICH                                                               $          192.85
   Mileage Reimbursement
17. Robert Schoeneck                                                              $           56.00
   Conference Expense
                                                                TOTAL             $     2,716,435.30
   *Ratification of check dated 3/11/2026
   **Ratification of check dated 3/12/2026
   ***Ratification of check dated 4/1/2026
                                                                        Page 18 of 71
PAYMENT OF BILLS - SCHEDULE #515
  April 9, 2026
                                                 PILOT Payments
1. ONONDAGA COUNTY*                                                        $   56,808.99
  2026 PILOT Payment
2. TOWN OF CICERO*                                                         $   65,935.55
  2026 PILOT Payment
3. NORTH SYRACUSE CSD*                                                     $ 229,544.80
  2026 PILOT Payment
                                                                  TOTAL:   $ 352,289.34
  *Ratification of Checks dated 3/30/2026
                                            Page 19 of 71
                                                                                                                                              4/7/2026
Project:                                                    Twin Ponds HB, LLC                                 Project Number:              3101-25-02A
Location:                                                   Manlius                                            School District:      Fayetteville-Manlius CSD
                                                                                                               Project Type:         Housing
Tax Parcel(s):                                              086.-02-06.1                                       Village:    N/A
Total Project Cost:                                          $                   114,813,168                   8. Total Jobs              7
Land Acquisition                                             $                             -                   8A. Job Retention          0
Site Work/Demo                                               $                     7,876,505                   8B: Job Creation           7
Building Construction & Renovation                           $                    94,860,561                        (Next 5 Years)
Furniture & Fixtures                                         $                       650,000
Equipment                                                    $                             -
Project Soft Cost                                            $                    11,426,102
Community Investment /Abatement                                                                                                                Project Description
                                                    Fiscal Impact ($)
Abatement Summary                                            $8,645,954
  Sales Tax Abatement                                        $4,800,000
  Mortgage Tax Abatement                                     $641,519
  Property Tax Relief (PILOT)                                $3,204,435
                                                                                                                   The applicant is proposing to construct a residential community consisting of
Community Investment                                        $126,814,235                                        approximately 309 multifamily units, a commercial space, and recreational areas in
 PILOT Payments                                             $2,972,710                                                                         the Town of Manlius.
 Project Salaries and Benefits Estimated (10 yrs)           $2,934,157
 Construction Benefit Estimate                              $6,094,200
 Total Project Cost                                         $114,813,168
Investment:Abatement Ratio                                  14.67                              :1
© 2026 Onondaga County Industrial Development Agency. All rights reserved.
Page 20 of 71
                                                      Twin Ponds HB, LLC
                                                          A) PILOTS Estimate Table Worksheet
                                                                     for 10 years
OCIDA estimate of current market value                                                                                                   $           583,000
Projected investment                                                                                                                     $        94,860,561
OCIDA estimate of increase in value                                                                                                      $        20,274,500
OCIDA estimated value after project is completed                                                                                         $        20,857,500
Taxes that would have been collected if the project did not occur                                                                        $           172,661
Scheduled PILOT payments                                                                                                                 $         2,972,710
Full Tax
                                      County PILOT                         School
  PILOT YEAR      Exemption %                               Town                            Village       Total PILOT     Payment w/o        Net Exemption
                                        Amount                             District
                                                                                                                             PILOT
        1              100%        $          1,737   $        2,520   $       11,511   $             -   $      15,769   $    564,137   $           548,369
        2              90%         $          7,934   $       11,510   $       52,573   $             -   $      72,018   $    575,420   $           503,402
        3              80%         $         14,378   $       20,858   $       95,274   $             -   $     130,510   $    586,928   $           456,418
        4              70%         $         21,077   $       30,576   $      139,661   $             -   $     191,314   $    598,667   $           407,353
        5              60%         $         28,037   $       40,674   $      185,785   $             -   $     254,497   $    610,640   $           356,143
        6              50%         $         35,268   $       51,164   $      233,699   $             -   $     320,131   $    622,853   $           302,722
        7              40%         $         42,777   $       62,057   $      283,455   $             -   $     388,289   $    635,310   $           247,021
        8              30%         $         50,572   $       73,366   $      335,108   $             -   $     459,045   $    648,016   $           188,971
        9              20%         $         58,662   $       85,102   $      388,713   $             -   $     532,476   $    660,977   $           128,500
        10             10%         $         67,055   $       97,278   $      444,328   $             -   $     608,661   $    674,196   $            65,535
TOTAL                              $        327,496   $      475,107   $    2,170,107   $             -   $   2,972,710   $ 6,177,145    $         3,204,435
Year
                         0                 1                     2            3               4                 5
Jobs
Current/Actuals
Creation Goals                             2                     2            3
Total
Employment
Goals                    0                 2                     4            7               7                 7
© 2026 Onondaga County Industrial Development Agency. All rights reserved.
                                                                                               Page 21 of 71
Page 22 of 71
Page 23 of 71
Page 24 of 71
Page 25 of 71
Page 26 of 71
Page 27 of 71
Page 28 of 71
Page 29 of 71
Page 30 of 71
Page 31 of 71
Page 32 of 71
Page 33 of 71
Page 34 of 71
Page 35 of 71
Page 36 of 71
Page 37 of 71
Page 38 of 71
Page 39 of 71
Page 40 of 71
Page 41 of 71
Page 42 of 71
Page 43 of 71
Page 44 of 71
         OCIDA Applica on Addendum – Twin Ponds HB, LLC – 04/01/2026
Sec on I
D) Has the owner/applicant received benefits from OCIDA, SIDA, NYS or OCDC in the past?
       Twin Ponds HB, LLC has not received benefits from any of the agencies above in the past.
       However, Braxton LLC, an owner of Twin Ponds HB, LLC, did receive benefits from OCIDA as an
       owner of Trey Jay LOSO, LLC in January 2022. The LOSO project is located at 22 Loso Drive,
       Cicero, NY, 13039 (Formally 6477 Lakeshore Rd). These benefits included a $2,500,000 sales tax
       exemp on and a $353,000 mortgage tax exemp on.
Sec on II
D) A statement that the Project described in this applica on would not be undertaken but for
the financial assistance provided by the Agency.
       The development of 5440 North Burdick Street, Tax Parcel No. 086.-02-06.1 (the “Property”) will
       not proceed without financial assistance from OCIDA because of the pressure from the current
       financial environment and increased material and labor cost.
E) Descrip on of Project: Please a ach a detailed narra ve of the proposed Project. Please
a ached copies of site plans, sketches or maps. This narra ve should include, but is not
limited to:
       Twin Ponds HB LLC is a single purpose LLC which currently owns the property and seeks to
       construct a residen al community consis ng of residen al dwelling units, commercial tenant
       space and recrea onal areas (the “Project”). We an cipate construc on beginning by the fourth
       quarter of 2026. The Project will include a clubhouse, amenity areas for recrea on, roadways,
       parking areas, landscaping, and u li es. Ten percent of the units will be workforce housing.
The project will include approximately 309 residen al units, made up of a mix of one, two and
       three-bedroom units. All but five of the apartments will be located in three modern five story
       buildings. A single two and three-story mixed-use building will also be constructed that will
       house five apartments on the second and third floors and approximately 5,700 square feet of
       commercial space on the ground floor.
       Specific project ameni es will include a well-equipped fitness center within the clubhouse. Near
       the pond there will also be separate enclosed areas accommoda ng both a children’s play area
       and a dog park. The pond will feature a new dock which can be used to fish or launch non-
       motorized watercra such as kayaks for pleasure boa ng. Adjacent to the pond residents will
       also find a covered pavilion for outdoor picnics and entertaining alongside the water.
       Also, both the Town and Village of Manlius support the crea on of a pedestrian bridge over
       neighboring Limestone Creek. This would allow future access from the property directly to the
       New York State Erie Canalway Trail. The Canalway is a significant nearby amenity offering
                                             Page 45 of 71
         outdoor enthusiasts the ability to walk, bike and run hundreds of miles all across Upstate NY!
         Funding for this connec on is not yet in place.
The Manlius Town Board has stated that there is currently an urgent need for more apartment
         units in the community. Apartments are needed to accommodate new workers, young people
         and seniors who desire to age in place. Notwithstanding the urgent need for apartments in
         Manlius, development pa erns and previous zoning regula ons have blocked needed
         development in the past.
         The Property represents a unique opportunity to develop land that is situated in a par cularly
         desirable loca on in terms of proximity to exis ng infrastructure, services and employment. The
         loca on of the site is ideal for the development of apartments and the Project will result in much
         needed infill, as it is surrounded by retail, senior housing and medical office space.
         Very li le addi onal infrastructure is needed to advance the Project. The Property is also
         uniquely suited to accommodate new apartments because it is not situated near any exis ng
         single-family dwellings. Put simply, the introduc on of addi onal residen al density can be
         accomplished without disrup ng the character of any exis ng single-family neighborhoods.
The Project has the poten al to provide much needed outdoor recrea on space while offering
         pedestrian connec ons between the Village of Faye eville, Northeast Medical Center and
         Faye eville Town Center. The Project includes extensive sidewalks and walking trails around the
         perimeter of the pond and along Burdick Street. This system of trails and sidewalks will provide
         much needed pedestrian connec ons to neighboring proper es now and in the future.
         The Manlius Town Board has expressed its support for this Project by overlaying a floa ng zone
         (approving a district plan for this Project) where previously this type of development would have
         otherwise been prohibited by code. More recently, the Town Planning Board provided a
         unanimous SEQRA Nega ve Declara on and Unanimous Site Plan approval for the project. This
         development is needed and desired by the community and will provide needed housing in an
         area where there is presently a lack of mul -family housing. Further, the District Plan includes
         provisions for workforce housing and housing for persons with special physical needs.
(i) a descrip on of your Company’s background, customers, goods and services and the principal
products to be produced and/or the principal ac vi es that will occur on the Project site;
Twin Ponds HB, LLC is a single purpose en ty created to own and manage the mixed-use and
         residen al development on the proposed site.
(ii) Size of project
         -   Mul Family Dwellings – 469,970 SF
                 o 87,460 SF of Covered Parking
                 o 369,240 Common Areas and Dwelling
         -   Club House – 5,400 SF
         -   Mixed Use Building – 16,880 SF
                 o Retail / Office 5,700 SF
                 o Dwelling Units – 11,180 SF
                                               Page 46 of 71
        -    Detached Garages - 13,270 SF
(iii) the size of the lot upon which the Project sits or is to be constructed;
        The lot size is approximately 54.85 Acres
(iv) the current use of the site and the intended use of the site upon comple on of the Project;
        The current property consists of vacant land which was previously used as a quarry and includes
        one large pond and 3 Vacant Houses. The intended use of the property is as a mul -family
        residen al complex containing 309 Residen al Units, associated support buildings such as
        maintenance and tenant garages, a club house, below ground and surface parking and a small
        retail/office component.
(v) describe your method for site control (Own, lease, other).
        The applicant currently owns the property.
G) any compelling circumstances the agency should be aware of…
H.1.c Have any environmental issues been iden fied on the property?
A small petroleum spill was iden fied during the environmental review of the project. The
        affected area is next to one of the exis ng structures and covers approximately 2,000 square
        feet. The affected area will be remediated as part of the project.
Sec on VII: Four Housing Projects Only
NEW UTEP Ques ons
1. Describe the reasons why the Agency’s financial assistance is necessary. Describe how the project
   would be impacted if these benefits were not provided. {Sec on II (D)}
        Because of the current lending environment and increased construc on costs, the project will not
        proceed without agency assistance. If the project is not provided assistance the amount of rent
        necessary to meet the financial requirements will be well in excess of current market rates.
        Consequently, we will be unable to secure the loan necessary to proceed.
2. Describe how the proposed housing project fulfills an unmet need in the community.
        Twin Ponds fulfills an unmet need of market and workforce housing in the Eastern Suburbs. As
        shown by the market study, there is currently very li le available supply.
3. Please provide a market study documen ng a need for the proposed project.
        A Market study provided by Robert Smith is a ached.
                                                 Page 47 of 71
4. Describe how the proposed project aligns with the Plan Onondaga County comprehensive plan. (Plan
   Onondaga)
One of the core objec ves of the County’s 2024 Comprehensive Plan is to support “affordable,
        a rac ve and efficient housing and neighborhoods to retain and a ract future residents”.
        We believe the development of the Twin Ponds housing complex directly aligns with this
        objec ve. The Plan notes that since the Great Recession (2007-2009) there has been a shor all
        in the construc on of single-family homes and a steeper decline in the development of “starter
        homes”. It adds, “although there has been a subsequent increase in the number of apartment
        units constructed over this same me period, there remains a shortage of units overall.”
        Con nuing it states, “today’s housing needs have changed drama cally due in large part to
        fewer households with children, few married households and an aging popula on overall. There
        is an increasing demand for apartments and a ached units on small lots in more walkable
        neighborhoods for example. Shi s in household size, makeup, lifestyle preference, declining
        willingness or ability to own a home and available inventory have led to an increase in demand
        for apartment units over detached owner-occupied homes.”
The project will create approximately 309 new apartment units on an unu lized, former quarry in
        the Town of Manlius. The units will be comprised of one, two and three-bedroom apartments
        offering wide flexibility for differing family types. Further the site is conveniently located in close
        proximity to exis ng shopping, restaurants and a large medical complex allowing residents to
        easily walk to these loca ons. In addi on to having access to a large pond allowing on site water
        access the property is conveniently located alongside the Erie Canal Trailway path. These
        characteris cs meet both the lifestyle and walkability goals for new projects outlined in the Plan.
        We believe Twin Ponds meets the objec ves outlined in the Plan by simultaneously crea ng a
        new housing op on and doing so in a manner consistent with the characteris cs described in the
        Plan.
5. Is the Project considered infill in a populated area? If yes, please explain.
        The project is located on an unu lized, former quarry, in the Town of Manlius and is the
        quintessen al defini on of an infill project. Located near exis ng shopping, restaurants and a
        large medical complex allowing. Infilling a large por on of land between various developments
        along Burdick Street.
6. Is there addi onal infrastructure necessary to service the project? If yes, please explain.
There are no significant addi onal infrastructure requirements for the project to proceed. Sewer,
        water, power and roads are all located adjacent to the property.
                                               Page 48 of 71
7. Is the project a part of a larger mixed-use development? If yes, please describe.
        No. It is a mul -family housing complex complimented by a small 5,700 sq. . commercial space.
                                              Page 49 of 71
                                                 Full Environmental Assessment Form
                                                      Part 1 - Project and Setting
 Instructions for Completing Part 1
 Part 1 is to be completed by the applicant or project sponsor. Responses become part of the application for approval or funding,
 are subject to public review, and may be subject to further verification.
 Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to
 any item, please answer as thoroughly as possible based on current information; indicate whether missing information does not exist,
 or is not reasonably available to the sponsor; and, when possible, generally describe work or studies which would be necessary to
 update or fully develop that information.
Applicants/sponsors must complete all items in Sections A & B. In Sections C, D & E, most items contain an initial question that
 must be answered either “Yes” or “No”. If the answer to the initial question is “Yes”, complete the sub-questions that follow. If the
 answer to the initial question is “No”, proceed to the next question. Section F allows the project sponsor to identify and attach any
 additional information. Section G requires the name and signature of the                project sponsor to verify that the information
 contained in Part 1is accurate and complete.
 A. Project and                Sponsor Information.
 Name of Action or Project:
Twin Ponds Residential Community
 Project Location (describe, and attach a general location map):
5440 Burdick Street, Manlius NY
 Brief Description of Proposed Action (include purpose or need):
The proposed action is for the development of a Residential Community consisting of residential dwelling units, commercial/mixed use tenants, and
recreational / open space areas. The development will include new residential and mixed use buildings, along with a clubhouse and amenity areas for
recreation. The project will construct necessary driveways, parking areas, landscaping, and site utilities to serve the proposed development.
Name of Applicant/Sponsor:                                                                 Telephone: 315-476-7917
Twin Ponds HB, LLC                                                                          E-Mail: cbreuer@hb1872.build
 Address: PO Box 515
 City/PO: Syracuse                                                                          State:                             Zip Code:
                                                                                                     NY                                    13205-0515
 Project Contact (if not same as sponsor; give name and title/role):                        Telephone:
                                                                                            E-Mail:
 Address:
 City/PO:                                                                                   State:                             Zip Code:
 Property Owner (if not same as sponsor):                                                   Telephone:
                                                                                            E-Mail:
 Address:
 City/PO:                                                                                   State:                             Zip Code:
                                                                   Page 1 of 13
                                                                   Page 50 of 71
B. Government Approvals
B. Government Approvals Funding, or Sponsorship. (“Funding” includes grants, loans, tax relief, and any other forms of financial
   assistance.)
             Government Entity                    If Yes: Identify Agency and Approval(s)                      Application Date
                                                                  Required                                   (Actual or projected)
a. City          Town        ,   Yes      No      Town Board - PUD District Plan                Approved Nov 2023
   or Village Board of Trustees
b. City, Town or Village         Yes      No     Site Plan Review                               March 2024
   Planning Board or Commission
c. City Town or                  Yes      No
   Village Zoning Board of Appeals
d. Other local agencies          Yes      No
e. County agencies                 Yes    No     OCIDA,SOCPA, OCDOT                             April 2024
f. Regional agencies               Yes    No
g. State agencies                  Yes    No     NYSDEC Stormwater Permit                       May 2024
h. Federal agencies                Yes    No
i. Coastal Resources.
   i. Is the project site within a Coastal Area, or the waterfront area of a Designated Inland Waterway?                    Yes      No
ii. Is the project site located in a community with an approved Local Waterfront Revitalization Program?                  Yes      No
 iii. Is the project site within a Coastal Erosion Hazard Area?                                                             Yes      No
C. Planning and Zoning
C.1. Planning and zoning actions.
Will administrative or legislative adoption, or amendment of a plan, local law, ordinance, rule or regulation be the        Yes      No
only approval(s) which must be granted to enable the proposed action to proceed?
        If Yes, complete sections C, F and G.
        If No, proceed to question C.2 and complete all remaining sections and questions in Part 1
C.2. Adopted land use plans.
a. Do any municipally- adopted (city, town, village or county) comprehensive land use plan(s) include the site      Yes No
   where the proposed action would be located?
If Yes, does the comprehensive plan include specific recommendations for the site where the proposed action         Yes No
would be located?
b. Is the site of the proposed action within any local or regional special planning district (for example: Greenway  Yes No
   Brownfield Opportunity Area (BOA); designated State or Federal heritage area; watershed management plan;
   or other?)
If Yes, identify the plan(s):
      _______________________________________________________________________________________________________
      ________________________________________________________________________________________________________
      ________________________________________________________________________________________________________
c. Is the proposed action located wholly or partially within an area listed in an adopted municipal open space plan, Yes No
   or an adopted municipal farmland protection plan?
If Yes, identify the plan(s):
     ________________________________________________________________________________________________________
     ________________________________________________________________________________________________________
     ________________________________________________________________________________________________________
                                                            Page 2 of 13
                                                             Page 51 of 71
C.3. Zoning
a. Is the site of the proposed action located in a municipality with an adopted zoning law or ordinance. Yes No
If Yes, what is the zoning classification(s) including any applicable overlay district?
    _________________________________________________________________________________________________________
    Approved  Planned Unit Development (PUD) District Plan - Twin Ponds PUD
    _________________________________________________________________________________________________________
b. Is the use permitted or allowed by a special or conditional use permit?                                                Yes    No
c. Is a zoning change requested as part of the proposed action?                                           Yes No
If Yes,
  i. What is the proposed new zoning for the site? ___________________________________________________________________
C.4. Existing community services.
a. In what school district is the project site located? Fayetteville-Manlius
                                                        ________________________________________________________________
                                                                             School District
b. What police or other public protection forces serve the project site?
   _________________________________________________________________________________________________________
Town of Manlius Police Department
c. Which fire protection and emergency medical services serve the project site?
  __________________________________________________________________________________________________________
Town of Manlius Fire Department
d. What parks serve the project site?
  __________________________________________________________________________________________________________
Town of Manlius Parks Department
  __________________________________________________________________________________________________________
 D. Project Details
D.1. Proposed and Potential Development
a. What is the general nature of the proposed action (e.g., residential, industrial, commercial, recreational; if mixed, include all
   components)? Residential and Mixed-Use (commercial)
   _________________________________________________________________________________________________________
b. a. Total acreage of the site of the proposed action?                   _____________
                                                                                    54 +/- acres
   b. Total acreage to be physically disturbed?                           _____________
                                                                                  16.7 +/- acres
   c. Total acreage (project site and any contiguous properties) owned
      or controlled by the applicant or project sponsor?                  _____________
                                                                                   54 +/- acres
c. Is the proposed action an expansion of an existing project or use?                                                      Yes No
   i. If Yes, what is the approximate percentage of the proposed expansion and identify the units (e.g., acres, miles, housing units,
      square feet)? % ____________________                       Units: ____________________
d. Is the proposed action a subdivision, or does it include a subdivision?                                 Yes No
If Yes,
   i. Purpose or type of subdivision? (e.g., residential, industrial, commercial; if mixed, specify types)
      ________________________________________________________________________________________________________
  ii. Is a cluster/conservation layout proposed?                                                           Yes No
 iii. Number of lots proposed? ________
  iv. Minimum and maximum proposed lot sizes? Minimum __________ Maximum __________
  Will     proposed action be constructed in multiple phases?                                                       Yes No
   If No, anticipated period of construction:                                   _____
                                                                                   24 months
   If Yes:
        Total number of phases anticipated                                      _____
        Anticipated commencement date of phase 1 (including demolition)         _____ month _____ year
        Anticipated completion date of final phase                              _____ month _____year
        Generally describe connections or relationships among phases, including any contingencies where progress of one phase may
        determine timing or duration of future phases: _______________________________________________________________
        ____________________________________________________________________________________________________
         ____________________________________________________________________________________________________
Page 3 of 13
                                                             Page 52 of 71
f. Does the project include new residential uses?                                                                    Yes    No
If Yes, show numbers of units proposed.
                   One Family         Two Family          Three Family         Multiple Family (four or more)
Initial Phase     ___________         ___________         ____________               304 dwelling units
                                                                               ________________________
At completion
  of all phases   ___________         ___________         ____________         ________________________
                                                                                          --
g. Does the proposed action include new non-residential construction (including expansions)?                          Yes   No
If Yes,
   i. Total number of structures ___________ 2
  ii. Dimensions (in feet) of largest proposed structure: ________height;
                                                                30        ________width;
                                                                                 60         and _______
                                                                                                     130 length
 iii. Approximate extent of building space to be heated or cooled: ______________________
                                                                            minimum of 7,800 SF square feet
h. Does the proposed action include construction or other activities that will result in the impoundment of any           Yes No
    liquids, such as creation of a water supply, reservoir, pond, lake, waste lagoon or other storage?
If Yes,
  i. Purpose of the impoundment: ________________________________________________________________________________
 ii. If a water impoundment, the principal source of the water:                  Ground water Surface water streams Other specify:
     _________________________________________________________________________________________________________
iii. If other than water, identify the type of impounded/contained liquids and their source.
     _________________________________________________________________________________________________________
 iv. Approximate size of the proposed impoundment.            Volume: ____________ million gallons; surface area: ____________ acres
  v. Dimensions of the proposed dam or impounding structure:          ________ height; _______ length
 vi. Construction method/materials for the proposed dam or impounding structure (e.g., earth fill, rock, wood, concrete):
      ________________________________________________________________________________________________________
D.2. Project Operations
a. Does the proposed action include any excavation, mining, or dredging, during construction, operations, or both?         Yes No
    (Not including general site preparation, grading or installation of utilities or foundations where all excavated
    materials will remain onsite)                                                           *general site grading / excavations
If Yes:
  i .What is the purpose of the excavation or dredging? _______________________________________________________________
ii. How much material (including rock, earth, sediments, etc.) is proposed to be removed from the site?
           Volume (specify tons or cubic yards): ____________________________________________
           Over what duration of time? ____________________________________________________
iii. Describe nature and characteristics of materials to be excavated or dredged, and plans to use, manage or dispose of them.
      ________________________________________________________________________________________________________
      ________________________________________________________________________________________________________
  iv. Will there be onsite dewatering or processing of excavated materials?                                                Yes No
      If yes, describe. ___________________________________________________________________________________________
      ________________________________________________________________________________________________________
  v. What is the total area to be dredged or excavated? _____________________________________acres
 vi. What is the maximum area to be worked at any one time? _______________________________ acres
vii. What would be the maximum depth of excavation or dredging? __________________________ feet
viii. Will the excavation require blasting?                                                                                Yes No
ix. Summarize site reclamation goals and plan: _____________________________________________________________________
      ________________________________________________________________________________________________________
      ________________________________________________________________________________________________________
b. Would the proposed action cause or result in alteration of, increase or decrease in size of, or encroachment    Yes No
    into any existing wetland, waterbody, shoreline, beach or adjacent area?
If Yes:
  i. Identify the wetland or waterbody which would be affected (by name, water index number, wetland map number or geographic
     description): ______________________________________________________________________________________________
     _________________________________________________________________________________________________________
                                                            Page 4 of 13
                                                            Page 53 of 71
ii. Describe how the proposed action would affect that waterbody or wetland, e.g. excavation, fill, placement of structures, or
     alteration of channels, banks and shorelines. Indicate extent of activities, alterations and additions in square feet or acres:
     _________________________________________________________________________________________________________
     _________________________________________________________________________________________________________
     _________________________________________________________________________________________________________
     _________________________________________________________________________________________________________
iii. Will      proposed action cause or result in disturbance to bottom sediments?                                             Yes No
     If Yes, describe: __________________________________________________________________________________________
 iv. Will       proposed action cause or result in the destruction or removal of aquatic vegetation?                           Yes No
    If Yes:
           a      of       vegetation proposed to be removed ___________________________________________________________
                     acreage of aquatic vegetation remaining after project completion ________________________________________
           purpose of proposed removal (e.g. beach clearing, invasive species control, boat access): ____________________________
            ____________________________________________________________________________________________________
           proposed method of plant removal: ________________________________________________________________________
           if chemical/herbicide treatment will be used, specify product(s): _________________________________________________
 v. Describe any proposed reclamation/mitigation following disturbance: _________________________________________________
     _________________________________________________________________________________________________________
c. Will the proposed action use, or create a new demand for water?                                                           Yes No
If Yes:
   i. Total anticipated water usage/demand per day: __________________________         68,000 gallons/day
  ii. Will the proposed action obtain water from an existing public water supply?                                            Yes No
If Yes:
            Name of district or service area: _________________________________________________________________________
                                                   OCWA
            Does the existing public water supply have capacity to serve the proposal?                                       Yes No
            Is the project site in the existing district?                                                                    Yes No
            Is expansion of the district needed?                                                                             Yes No
            Do existing lines serve the project site?                                                                        Yes No
 iii. Will line extension within an existing district be necessary to supply the project?                                    Yes No
If Yes:
            Describe extensions or capacity expansions proposed to serve this project: ________________________________________
            ____________________________________________________________________________________________________
              Extension of public water main to service the proposed buildings
            Source(s) of supply for the district: ________________________________________________________________________
                                                      OCWA
  iv. Is a new water supply district or service area proposed to be formed to serve the project site?                        Yes No
If, Yes:
            Applicant/sponsor for new district: ________________________________________________________________________
            Date application submitted or anticipated: __________________________________________________________________
            Proposed source(s) of supply for new district: _______________________________________________________________
   v. If a public water supply will not be used, describe plans to provide water supply for the project: ___________________________
      _________________________________________________________________________________________________________
 vi. If water supply will be from wells (public or private),                   maximum pumping capacity: _______ gallons/minute.
d. Will the proposed action generate liquid wastes?                                                                         Yes No
If Yes:
  i. Total anticipated liquid waste generation per day: _______________
                                                                      68,000 gallons/day
  ii. Nature of liquid wastes to be generated (e.g., sanitary wastewater, industrial; if combination, describe all components and
      approximate volumes or proportions of each): __________________________________________________________________
      _________________________________________________________________________________________________________
     residential sanitary wastewater
      _________________________________________________________________________________________________________
iii. Will the proposed action use any existing public wastewater treatment facilities?                                      Yes No
     If Yes:
                                                             Meadowbrook-Limestone
           Name of wastewater treatment plant to be used: _____________________________________________________________
           Name of district: Meadowbrook-Limestone
                                ______________________________________________________________________________________
           Does the existing wastewater treatment plant have capacity to serve the project?                                 Yes No
           Is the project site in the existing district?                                                                    Yes No
           Is expansion of the district needed?                                                                             Yes No
Page 5 of 13
                                                          Page 54 of 71
          Do existing sewer lines serve the project site?                                                                    Yes No
          Will line extension within an existing district be necessary to serve the project?                                 Yes No
          If Yes:
               Describe extensions or capacity expansions proposed to serve this project: ____________________________________
          ____________________________________________________________________________________________________
           Public sewer extension from Meadowbrook-Limestone trunk sewer to service the proposed buildings
          ____________________________________________________________________________________________________
iv. Will a new wastewater (sewage) treatment district be formed to serve the project site?                                   Yes No
    If Yes:
           Applicant/sponsor for new district: ____________________________________________________________________
           Date application submitted or anticipated: _______________________________________________________________
           What is the receiving water for the wastewater discharge? __________________________________________________
v. If public facilities will not be used, describe plans to provide wastewater treatment for the project, including specifying proposed
     receiving water (name and classification if surface discharge or describe subsurface disposal plans):
   ________________________________________________________________________________________________________
   ________________________________________________________________________________________________________
vi. Describe any plans or designs to capture, recycle or reuse liquid waste: _______________________________________________
      ________________________________________________________________________________________________________
      ________________________________________________________________________________________________________
e. Will the proposed action disturb more than one acre and create stormwater runoff, either from new point               Yes No
    sources (i.e. ditches, pipes, swales, curbs, gutters or other concentrated flows of stormwater) or non-point
     source (i.e. sheet flow) during construction or post construction?
If Yes:
  i. How much impervious surface will the project create in relation to total size of project parcel?
               _____ Square feet or _____    9 acres (impervious surface)
              _____ Square feet or _____   54 acres (parcel size)
 ii. Describe types of new point sources. __________________________________________________________________________
                                                 surface runoff from parking areas and roof areas
      _________________________________________________________________________________________________________
iii. Where will the stormwater runoff be directed (i.e. on-site stormwater management facility/structures, adjacent properties,
       groundwater, on-site surface water or off-site surface waters)?
       ________________________________________________________________________________________________________
       on site stormwater management system and existing surface pond
       ________________________________________________________________________________________________________
             If to surface waters, identify receiving water bodies or wetlands: ________________________________________________
             ____________________________________________________________________________________________________
             ____________________________________________________________________________________________________
             Will stormwater runoff flow to adjacent properties?                                                         Yes No
iv. Does         proposed plan minimize impervious surfaces, use pervious materials or collect and re-use stormwater?    Yes No
f. Does the proposed action include, or will it use on-site, one or more sources of air emissions, including fuel        Yes No
    combustion, waste incineration, or other processes or operations?
If Yes, identify:
   i. Mobile sources during project operations (e.g., heavy equipment, fleet or delivery vehicles)
      _________________________________________________________________________________________________________
        none
  ii. Stationary sources during construction (e.g., power generation, structural heating, batch plant, crushers)
       ________________________________________________________________________________________________________
       typical construction equipment including generators and temporary heating
 iii. Stationary sources during operations (e.g., process emissions, large boilers, electric generation)
      ________________________________________________________________________________________________________
       none
g. Will any air emission sources named in D.2.f (above), require a NY State Air Registration, Air Facility Permit,      Yes    No
    or Federal Clean Air Act Title IV or Title V Permit?
If Yes:
i. Is the project site located in an Air quality non-attainment area? (Area routinely or periodically fails to meet     Yes    No
    ambient air quality standards for all or some parts of the year)
ii. In addition to emissions as calculated in the application, the project will generate:
          ___________Tons/year (               ) of Carbon Dioxide (CO2)
          ___________Tons/year (               ) of Nitrous Oxide (N2 )
          ___________Tons/year (               ) of Perfluorocarbons (PFCs)
          ___________Tons/year (               ) of Sulfur Hexafluoride (SF6)
          ___________Tons/year (               ) of Carbon Dioxide equivalent of Hydroflo rocarbons (H        )
          ___________Tons/year (               ) of Hazardous Air Pollutants (HAPs)
Page 6 of 13
                                                             Page 55 of 71
h. Will the proposed action generate or emit methane (including, but not limited to, sewage treatment plants,           Yes No
    landfills, composting facilities)?
If Yes:
  i. Estimate methane generation in tons/year (metric): ________________________________________________________________
 ii. Describe any methane capture, control or elimination measures included in project design (e.g., combustion to generate heat or
     electricity, flaring): ________________________________________________________________________________________
      _________________________________________________________________________________________________________
i. Will the proposed action result in the release of air pollutants from open-air operations or processes, such as Yes No
   quarry or landfill operations?
If Yes: Describe operations and nature of emissions (e.g., diesel exhaust, rock particulates/dust):
    _________________________________________________________________________________________________________
    _________________________________________________________________________________________________________
j. Will the proposed action result in a substantial increase in traffic above present levels or generate substantial         Yes       No
   new demand for transportation facilities or services?
If Yes:
   i. When is the peak traffic expected (Check all that apply):        Morning           Evening           Weekend
         Randomly between hours of __________
                                        7am-9am     to ________.
                                                        4pm-6pm
   ii. For commercial activities only, projected number of truck trips/day
      Parking spaces:       Existing _____________
                                             zero                  Proposed ___________
                                                                                569     Net increase/decrease _____________
                                                                                                                       + 569
v.
       new site access off North Burdick Street with signal improvement.
vi. Are public/private transportation service(s) or facilities available within ½ mile of the proposed site?                 Yes       No
vii Will the proposed action include access to public transportation or accommodations for use of hybrid, electric           Yes       No
     or other alternative fueled vehicles?
viii. Will the proposed action include plans for pedestrian or bicycle accommodations for connections to existing            Yes       No
      pedestrian or bicycle routes?
k. Will the proposed action (for commercial or industrial projects only) generate new or additional demand                     Yes No
    for energy?
If Yes:
                                                                                                 *residential mixed use project
  i. Estimate annual electricity demand during operation of the proposed action: ____________________________________________
     _________________________________________________________________________________________________________
 ii. Anticipated sources/suppliers of electricity for the project (e.g., on-site combustion, on-site renewable, via grid/local utility, or
     other):
     ________________________________________________________________________________________________________
iii. Will the proposed action require a new, or an upgrade to an existing substation?                                          Yes No
l. Hours of operation. Answer all items which apply.
   i. During Construction:                                                 ii. During Operations:
          Monday - Friday: _________________________
                                      7am-7pm                                       Monday - Friday: ____________________________
                                                                                                       commercial businesses 7am-9pm
          Saturday: ________________________________
                                          ---                                       Saturday: ___________________________________
                                                                                                       commercial businesses 7am-9pm
          Sunday: _________________________________
                                         ----                                       Sunday: ____________________________________
                                                                                                       commercial businesses 7am-9pm
          Holidays: ________________________________
                                         -----                                      Holidays: ___________________________________
                                                                                                                    -----
                                                                   Page 7 of 13
Page 56 of 71
m. Will the proposed action produce noise that will exceed existing ambient noise levels during construction, Yes No
    operation, or both?
If yes:
i. Provide details including sources, time of day and duration:
     _______________________________________________________________________________________________________
       Typical construction equipment (loaders, truck, excavators) during construction hours 7am-7pm
      _______________________________________________________________________________________________________
ii. Will     proposed action remove existing natural barriers that could act as a noise barrier or screen?    Yes No
    Describe: _________________________________________________________________________________________________
    _________________________________________________________________________________________________________
n. Will the proposed action have outdoor lighting?                                                                      Yes No
 If yes:
 i. Describe source(s), location(s), height of fixture(s), direction/aim, and proximity to nearest occupied structures:
     _________________________________________________________________________________________________________
     typical parking lot and building mounted area lighting
     _________________________________________________________________________________________________________
ii. Will proposed action remove existing natural barriers that could act as a light barrier or screen?                  Yes No
    Describe: _________________________________________________________________________________________________
     _________________________________________________________________________________________________________
o. Does the proposed action have the potential to produce odors for more than one hour per day?                     Yes No
    If Yes, describe possible sources, potential frequency and duration of odor emissions, and proximity to nearest
    occupied structures: ______________________________________________________________________________________
     ________________________________________________________________________________________________________
     ________________________________________________________________________________________________________
p. Will the proposed action include any bulk storage of petroleum (                 over 1,100 gallons)      Yes No
   or chemical products                                                                       ?
If Yes:
    Product(s) to be stored ______________________________________________________________________________________
    Volume(s) ______       per unit time ___________ (e.g., month, year)
    Generally describe      proposed storage facilities ________________________________________________________________
    ________________________________________________________________________________________________________
q. Will the proposed action (commercial, industrial and recreational projects only) use pesticides (i.e., herbicides,    Yes No
     insecticides) during construction or operation?
If Yes:                                                                                    *Residential mixed use project
    i. Describe proposed treatment(s):
       ________________________________________________________________________________________________________
       ________________________________________________________________________________________________________
       ________________________________________________________________________________________________________
       ________________________________________________________________________________________________________
   ii. Will the proposed action use Integrated Pest Management Practices?                                                Yes No
r. Will the proposed action (commercial or industrial projects only) involve or require the management or disposal       Yes No
    of solid waste (excluding hazardous materials)?
If Yes:                                                                                       *Residential mixed use project
   i. Describe any solid waste(s) to be generated during construction or operation of the facility:
            Construction: ____________________ tons per ________________ (unit of time)
            Operation : ____________________ tons per ________________ (unit of time)
  ii. Describe any proposals for on-site minimization, recycling or reuse of materials to avoid disposal as solid waste:
            Construction: ________________________________________________________________________________________
            ____________________________________________________________________________________________________
            Operation: __________________________________________________________________________________________
            ____________________________________________________________________________________________________
iii. Proposed disposal methods/facilities for solid waste generated on-site:
            Construction: ________________________________________________________________________________________
            ____________________________________________________________________________________________________
            Operation: __________________________________________________________________________________________
           ____________________________________________________________________________________________________
Page 8 of 13
                                                        Page 57 of 71
s. Does the proposed action include construction or modification of a solid waste management facility?                     Yes     No
If Yes:
   i. Type of management or handling of waste proposed for the site (e.g., recycling or transfer station, composting, landfill, or
        other disposal activities): ___________________________________________________________________________________
  ii. Anticipated rate of disposal/processing:
            ________ Tons/month, if transfer or other non-combustion/thermal treatment, or
            ________ Tons/hour, if combustion or thermal treatment
  iii. If landfill, anticipated site life: ________________________________ years
t. Will      proposed action at the site involve the commercial generation, treatment, storage, or disposal of hazardous Yes No
    waste?
If Yes:
   i. Name(s) of all hazardous wastes or constituents to be generated, handled or managed at facility: ___________________________
      _________________________________________________________________________________________________________
      _________________________________________________________________________________________________________
  ii. Generally describe processes or activities involving hazardous wastes or constituents: ___________________________________
      _________________________________________________________________________________________________________
      ________________________________________________________________________________________________________
  iii. Specify amount to be handled or generated _____ tons/month
  iv. Describe any proposals for on-site minimization, recycling or reuse of hazardous constituents: ____________________________
       ________________________________________________________________________________________________________
       ________________________________________________________________________________________________________
   v. Will any hazardous wastes be disposed at an existing offsite hazardous waste facility?                             Yes No
If Yes: provide name and location of facility: _______________________________________________________________________
       ________________________________________________________________________________________________________
If No: describe proposed management of any hazardous wastes which will not be sent to a hazardous waste facility:
        ________________________________________________________________________________________________________
       ________________________________________________________________________________________________________
E. Site and Setting of Proposed Action
 E.1. Land uses on and surrounding the project site
a. Existing land uses.
   i. Check all uses that occur on, adjoining and near the project site.
    Urban        Industrial       Commercial             Residential (suburban)       Rural (non-farm)
    Forest       Agriculture      Aquatic               Other (specify): ____________________________________
 ii. If mix of uses, generally describe:
__________________________________________________________________________________________________________
   Commercial Fayetteville Towne Center, Medical Facility, and residential apartments
 __________________________________________________________________________________________________________
b. Land uses and covertypes on the project site.
                      Land use or                                 Current                  Acreage After              Change
                       Covertype                                  Acreage                Project Completion          (Acres +/-)
    Roads, buildings, and other paved or impervious
                                                                     0.5                         9.0                     + 8.5
    surfaces
    Forested                                                         0.0
    Meadows, grasslands or brushlands (non-
                                                                    28.5                         20                      -8.5
    agricultural, including abandoned agricultural)
    Agricultural                                                     0.0
    (includes active orchards, field, greenhouse etc.)
    Surface water features
                                                                     25                          25                      0.0
    (lakes, ponds, streams, rivers, etc.)
    Wetlands (freshwater or tidal)                                   0.0
    Non-vegetated (bare rock, earth or fill)                         0.0
    Other
    Describe: _______________________________
    ________________________________________
Page 9 of 13
                                                           Page 58 of 71
c. Is the project site presently used by members of the community for public recreation?              Yes No
  i. If Yes: explain: __________________________________________________________________________________________
d. Are there any facilities serving children, the elderly, people with disabilities (e.g., schools, hospitals, licensed Yes No
   day care centers, or group homes) within 1500 feet of the project site?
If Yes,
  i. Identify Facilities:
     ________________________________________________________________________________________________________
     Northeast Medical Center, Towne Center Retirement Community
     ________________________________________________________________________________________________________
e. Does the project site contain an existing dam?                                                          Yes No
If Yes:
   i. Dimensions of the dam and impoundment:
            Dam height:              _________________________________ feet
            Dam length:              _________________________________ feet
            Surface area:            _________________________________ acres
            Volume impounded: _______________________________ gallons OR acre-feet
  ii. Dam s existing hazard classification: _________________________________________________________________________
  iii. Provide date and summarize results of last inspection:
       _______________________________________________________________________________________________________
       _______________________________________________________________________________________________________
f. Has the project site ever been used as a municipal, commercial or industrial solid waste management facility,         Yes No
   or does the project site adjoin property which is now, or was at one time, used as a solid waste management facility?
If Yes:
   i. Has the facility been formally closed?                                                                             Yes No
           If yes, cite sources/documentation: _______________________________________________________________________
  ii. Describe the location of the project site relative to the boundaries of the solid waste management facility:
      _______________________________________________________________________________________________________
      _______________________________________________________________________________________________________
 iii. Describe any development constraints due to the prior solid waste activities: __________________________________________
      _______________________________________________________________________________________________________
g. Have hazardous wastes been generated, treated and/or disposed of at the site, or does the project site adjoin     Yes No
    property which is now or was at one time used to commercially treat, store and/or dispose of hazardous waste?
If Yes:
  i. Describe waste(s) handled and waste management activities, including approximate time when activities occurred:
      _______________________________________________________________________________________________________
      _______________________________________________________________________________________________________
h. Potential contamination history. Has there been a reported spill at the proposed project site, or have any        Yes No
   remedial actions been conducted at or adjacent to the proposed site?
If Yes:
  i. Is any portion of the site listed on the NYSDEC Spills Incidents database or Environmental Site                 Yes No
     Remediation database? Check all that apply:
        Yes – Spills Incidents database                                                       2108871 - spill closed
                                                                 Provide DEC ID number(s): ________________________________
        Yes – Environmental Site Remediation database            Provide DEC ID number(s): ________________________________
                                                                                               none
        Neither database
ii. If site has been subject of RCRA corrective activities, describe control measures:_______________________________________
    ________________________________________________________________________________________________________
    ________________________________________________________________________________________________________
 iii. Is the project within 2000 feet of any site in the NYSDEC Environmental Site Remediation database?           Yes No
If yes, provide DEC ID number(s): ______________________________________________________________________________
iv. If yes to (i), (ii) or (iii) above, describe current status of site(s):
    _______________________________________________________________________________________________________
     Spill Incident 2108871. Gasoline spill due to equipment failure. Spill date is closed by NYSDEC on 9/19/2022
    _______________________________________________________________________________________________________
Page 10 of 13
                                                                   Page 59 of 71
 v. Is the project site subject to an institutional control limiting property uses?                                  Yes No
           If yes, DEC site ID number: ____________________________________________________________________________
           Describe the type of institutional control (e.g., deed restriction or easement): ____________________________________
           Describe any use limitations: ___________________________________________________________________________
           Describe any engineering controls: _______________________________________________________________________
           Will the project affect the institutional or engineering controls in place?                               Yes No
           Explain: ____________________________________________________________________________________________
           ___________________________________________________________________________________________________
            ___________________________________________________________________________________________________
E.2. Natural Resources On or Near Project Site
a. What is the average depth to bedrock on the project site?              ________________
                                                                                        40 feet
b. Are there bedrock outcroppings on the project site?                                                                     Yes    No
If Yes, what proportion of the site is comprised of bedrock outcroppings? __________________%
c. Predominant soil type(s) present on project site:    ___________________________
                                                          Cazenovia Silt Loam                          __________%
                                                                                                              5.0
                                                         ___________________________
                                                         Gravel pit                                    __________%
                                                                                                             29.0
                                                        ____________________________
                                                         surface water                                 __________%
                                                                                                             66.0
d. What is the average depth to the water table on the project site? Average: _________
                                                                                   > 30ft feet
e. Drainage status of project site soils:   Well Drained:                  _____%
                                                                             100  of ite
                                            Moderately Well Drained:       _____% of site
                                            Poorly Drained                 _____% of ite
f. Approximate proportion of proposed action site with slopes:       0-10%:                  _____%
                                                                                               75   of site
                                                                     10-15%:                 _____%
                                                                                               15   of site
                                                                     15% or greater:         _____%
                                                                                               10   of site
g. Are there any unique geologic features on the project site?                                       Yes No
 If Yes, describe: _____________________________________________________________________________________________
    ________________________________________________________________________________________________________
h. Surface water features.
  i. Does any portion of the project site contain wetlands or other waterbodies (including streams, rivers,                      Yes No
     ponds or lakes)?
 ii. Do any wetlands or other waterbodies adjoin the project site?                                                               Yes No
If Yes to either i or ii, continue. If No, skip to E.2.i.
iii. Are any of the wetlands or waterbodies within or adjoining the project site regulated by any federal,                       Yes No
      state or local agency?
 iv. For each identified             wetland and waterbody on the project site, provide the following information
             Streams:           Name ____________________________________________
                                        899-222                                                     Classification _______________________
                                                                                                                   C
                                        899-224.3                                                                  C
             Lakes or Ponds: Name ____________________________________________ Classification _______________________
             Wetlands:          Name ____________________________________________
                                         Federal waters, NYS wetlands                               Approximate Size ___________________
                                                                                                                       907 acres
             Wetland No. (if regulated by DEC) _____________________________
                                                     SYE-22
v. Are any of the above water bodies listed in the most recent compilation of NYS water quality-impaired                         Yes No
     waterbodies?
If yes, name of impaired water body/bodies and basis for listing as impaired: _____________________________________________
___________________________________________________________________________________________________________
  Limestone creek lower and minor tributaries - Pathogens, dissolved oxygen / oxygen demand, aesthetics.
i. Is the project site in a designated Floodway?                                                                           Yes    No
j. Is the project site in the 100 year Floodplain?                                                                         Yes    No
k. Is the project site in the 500 year Floodplain?                                                                         Yes    No
l. Is the project site located over, or immediately adjoining, a primary, principal or sole source aquifer? Yes No
If Yes:
   i. Name of aquifer: _________________________________________________________________________________________
                                                            Page 11 of 13
                                                               Page 60 of 71
m. Identify the predominant wildlife species that occupy or use the project site:             ______________________________
   ______________________________
    squirrels, deer, birds                    _______________________________                 ______________________________
   ______________________________             _______________________________                 ______________________________
n. Does the project site contain a designated significant natural community?                                       Yes No
If Yes:
   i. Describe the habitat/community (composition, function, and basis for designation): _____________________________________
      ________________________________________________________________________________________________________
  ii. Source(s) of description or evaluation: ________________________________________________________________________
 iii. Extent of community/habitat:
          Currently:                                      ______________________ acres
          Following completion of project as proposed: _____________________ acres
          Gain or loss (indicate + or -):                 ______________________ acres
o. Does project site contain any species of plant or animal that is listed by the federal government or NYS as            Yes   No
  endangered or threatened, or does it contain any areas identified as habitat for an endangered or threatened species?
northern long-eared bat
p. Does the project site contain any species of plant or animal that is listed by NYS as rare, or as a species of         Yes   No
   special concern?
q. Is the project site or adjoining area currently used for hunting, trapping, fishing or shell fishing?          Yes No
If yes, give a brief description of how the proposed action may affect that use: ___________________________________________
    ________________________________________________________________________________________________________
E.3. Designated Public Resources On or Near Project Site
a. Is the project site, or any portion of it, located in a designated agricultural district certified pursuant to Yes No
   Agriculture and Markets Law, Article 25-AA, Section 303 and 304?
If Yes, provide county plus district name/number: _________________________________________________________________
b. Are agricultural lands consisting of highly productive soils present?                                   Yes No
   i. If Yes: acreage(s) on project site? ___________________________________________________________________________
  ii. Source(s) of soil rating(s): _________________________________________________________________________________
c. Does the project site contain all or part of, or is it substantially contiguous to, a registered National          Yes No
    Natural Landmark?
If Yes:
  i. Nature of the natural landmark:             Biological Community                 Geological Feature
  ii. Provide brief description of landmark, including values behind designation and approximate size/extent: ___________________
     ________________________________________________________________________________________________________
     ________________________________________________________________________________________________________
d. Is the project site located in or does it adjoin a state listed Critical Environmental Area?          Yes No
If Yes:
    i. CEA name: _____________________________________________________________________________________________
   ii. Basis for designation: _____________________________________________________________________________________
  iii. Designating agency and date: ______________________________________________________________________________
                                                            Page 12 of 13
                                                             Page 61 of 71
e. Does the project site contain, or is it substantially contiguous to, a building, archaeological site, or district                      Yes No
   which is listed on                                        of Historic P
                                                                                                                      of Historic Places?
If Yes:
   i. Nature of historic/archaeological resource:            Archaeological Site           Historic Building or District
  ii. Name: Eligible
               _________________________________________________________________________________________________
                      property: Limestone Creek aqueduct & crossover bridge
iii. Brief description of attributes on which listing is based:
      _______________________________________________________________________________________________________
       Old Erie Canal State Historic Park listing related to Recreation, Landscape Architecture, and historic engineering features.
f. Is the project site, or any portion of it, located in or adjacent to an area designated as sensitive for                      Yes     No
   archaeological sites on the NY State Historic Preservation Office (SHPO) archaeological site inventory?
g. Have additional archaeological or historic site(s) or resources been identified on the project site?  Yes No
If Yes:
   i. Describe possible resource(s): _______________________________________________________________________________
  ii. Basis for identification: ___________________________________________________________________________________
h.     the project site                       any officially designated and publicly accessible federal, state, or local         Yes No
    scenic or aesthetic resource?
If Yes:
   i. Identify resource: _________________________________________________________________________________________
                          Erie Canal Trail
  ii. Nature of, or basis for, designation (e.g., established highway overlook, state or local park, state historic trail or scenic byway,
      etc.): ___________________________________________________________________________________________________
             State trail
iii. Distance between project and resource: _____________________       0.5 miles.
i. Is the project site located within a designated river corridor under the Wild, Scenic and Recreational Rivers Yes No
     Program 6 NYCRR 666?
If Yes:
   i. Identify the name of the river and its designation: ________________________________________________________________
  ii. Is the activity consistent with development restrictions contained in 6NYCRR Part 666?                     Yes No
F. Additional Information
 Attach any additional information which may be needed to clarify your project.
 If you have identified any adverse impacts which could be associated with your proposal, please describe those impacts plus any
 measures which you propose to avoid or minimize them.
 G. Verification
 I certify that the information provided is true to the best of my knowledge.
 Applicant/Sponsor Name ___________________________________
                         CHA Consulting Inc (c/o Brian Bouchard) Date_______________________________________
                                                                      3/25/24
 Signature________________________________________________ Title_______________________________________
                                                                 Project Engineer
        PRINT FORM                                             Page 13 of 13
                                                                Page 62 of 71
                                                                                       Monday, July 31, 2023 3:07 PM
Disclaimer: The EAF Mapper is a screening tool intended to assist
                                                                            project sponsors and reviewing agencies in preparing an environmental
                                                                            assessment form (EAF). Not all questions asked in the EAF are
                                                                            answered by the EAF Mapper. Additional information on any EAF
                                                                            question can be obtained by consulting the EAF Workbooks. Although
                                                                            the EAF Mapper provides the most up-to-date digital data available to
                                                                            DEC, you may also need to contact local or other data sources in order
                                                                            to obtain data not provided by the Mapper. Digital data is not a
                                                                            substitute for agency determinations.
B.i.i [Coastal or Waterfront Area]              No
B.i.ii [Local Waterfront Revitalization Area]   No
C.2.b. [Special Planning District]              Digital mapping data are not available or are incomplete. Refer to EAF
                                                Workbook.
E.1.h [DEC Spills or Remediation Site -         Digital mapping data are not available or are incomplete. Refer to EAF
Potential Contamination History]                Workbook.
E.1.h.i [DEC Spills or Remediation Site -       Digital mapping data are not available or are incomplete. Refer to EAF
Listed]                                         Workbook.
E.1.h.i [DEC Spills or Remediation Site -       Digital mapping data are not available or are incomplete. Refer to EAF
Environmental Site Remediation Database]        Workbook.
E.1.h.iii [Within 2,000' of DEC Remediation     No
Site]
E.2.g [Unique Geologic Features]                No
E.2.h.i [Surface Water Features]                Yes
E.2.h.ii [Surface Water Features]               Yes
E.2.h.iii [Surface Water Features]              Yes - Digital mapping information on local and federal wetlands and
                                                waterbodies is known to be incomplete. Refer to EAF Workbook.
E.2.h.iv [Surface Water Features - Stream       899-222
Name]
E.2.h.iv [Surface Water Features - Stream       C
Classification]
E.2.h.iv [Surface Water Features -              899-224.3
Lake/Pond Name]
E.2.h.iv [Surface Water Features -              C
Lake/Pond Classification]
E.2.h.iv [Surface Water Features - Wetlands Federal Waters, NYS Wetland
Name]
Page 63 of 71
Full Environmental Assessment Form - EAF Mapper Summary Report                                                                                   1
E.2.h.iv [Surface Water Features - Wetlands NYS Wetland (in acres):892.6
Size]
E.2.h.iv [Surface Water Features - DEC           SYE-22
Wetlands Number]
E.2.h.v [Impaired Water Bodies]                  Yes
E.2.h.v [Impaired Water Bodies - Name and        Name - Pollutants - Uses:Limestone Creek, Lower, and minor tribs
Basis for Listing]                               Pathogens;D.O./Oxygen Demand;Aesthetics Recreation;Aquatic Life
E.2.i. [Floodway]                                Yes
E.2.j. [100 Year Floodplain]                     Yes
E.2.k. [500 Year Floodplain]                     Yes
E.2.l. [Aquifers]                                No
E.2.n. [Natural Communities]                     No
E.2.o. [Endangered or Threatened Species]        Yes
E.2.o. [Endangered or Threatened Species - Northern Long-eared Bat
Name]
E.2.p. [Rare Plants or Animals]                  No
E.3.a. [Agricultural District]                   No
E.3.c. [National Natural Landmark]               No
E.3.d [Critical Environmental Area]              No
E.3.e. [National or State Register of Historic   Yes - Digital mapping data for archaeological site boundaries are not
Places or State Eligible Sites]                  available. Refer to EAF Workbook.
E.3.e.ii [National or State Register of Historic Eligible property:LIMESTONE CREEK AQUEDUCT & CROSSOVER BRIDGE
Places or State Eligible Sites - Name]
E.3.f. [Archeological Sites]                     No
E.3.i. [Designated River Corridor]               No
Page 64 of 71
Full Environmental Assessment Form - EAF Mapper Summary Report                                                           2
Page 65 of 71
Page 66 of 71
Page 67 of 71
The ongoing housing shortage in Onondaga County and the City of Syracuse
impacts economic development significantly. Limited housing availability can stifle
population growth, deter new businesses from expanding or locating here, and
strain existing infrastructure. Rising housing costs may push residents to seek more
affordable living outside the area, reducing the local labor pool. This shortage can
also hinder efforts to attract and retain talent, essential for economic expansion
and innovation. Addressing this challenge is crucial for sustainable economic
development and community well-being throughout the county and the region .
The author of this report, Robert Smith, is a Licensed New York State Real Estate Broker with 30 years experience in the Onondaga
County housing market including residential resale, new construction, and development. In addition, Mr. Smith served for 15 years
on the Town of Cicero Planning Board for many of those years as the board’s Chair. Mr. Smith is a Member of the Greater Syracuse
Association of REALTORS®. Mr. Smith is a NYS Licensed Real Estate Instructor and owns a New York State Licensed Real Estate
School in Syracuse, New York training real estate agents, brokers, appraisers, and assessors. His experience in the Onondaga County
housing market and planning has afforded him a unique understanding of that housing market.

Showing the first 80 of 89 passages — read the complete text.