clayny.news

AI for transparency
Clay, New York · Friday, August 7, 2026· Aug 7, 2026
Public Records › OCIDA › ocida-meeting

May 2025 — 5-8-25 OCIDA Regular Meeting Board Packet

Document date 2024-12-12 Collected 2026-08-07 Extracted text 2,774 words Format PDF
Official copy ↗ Archived copy Plain text (OCR) Search mentions
From May 2025
Same source May 2025 · 2024-12-12
Same source May 2025 — OCIDA Recording · 2024-12-12
Same source May 2025 — 5.8.25 OCIDA Mtg Notice · 2024-12-12

Machine-extracted (OCR) from the official document — formatting is approximate; the official copy governs.

335 MONTGOMERY STREET, FLOOR 2M, SYRACUSE, NY 13202
335 MONTGOMERY STREET, FLOOR 2M, SYRACUSE, NY 13202
                315.435.3770 • ECONOMICDEVELOPMENT@ONGOV.NET • ONGOVED.COM
                                  Regular Meeting Agenda
                                        May 8, 2025
Call to Order the Regular Meeting of the Agency
        A. Approval of Minutes: April 10, 2025
        B. Treasurer’s Report
        C. Payment of Bills
        D. Conflict of Interest
Action Items:
  1. United Auto Supply of Syracuse West, Inc. (Project #3101-25-03A) Second Meeting
     United Auto Supply of Syracuse West, Inc. is proposing to renovate approximately 259,000
     square feet located at 1165 Van Vleck Rd (also known as 1200 State Fair Blvd) in the town
     of Geddes to allow for expansion of operations, distribution, and warehousing at one
     centralized location.
      Agency Action Requested:
       a. A resolution of the Board to authorize adoption of SEQRA determination.
       b. A resolution of the Board authorizing the financial assistance the Agency will provide.
          Agency benefits requested include exemptions from certain sales and use taxes, real
          estate transfer taxes, and mortgage recording taxes.
      Representative: James Ranalli III and James Trasher
  2. Engineering Services Contract Authorization
Agency Action Requested:
       a. A resolution of the Board authorizing an amendment to the contract with Barton &
       Loguidice, D.P.C. consisting of an increase to the amount authorized in the amount of
       $86,000 for engineering services.
  3. Committee Appointments
      Agency Action Requested:
       a. A resolution of the Board appointing Gar Grannell as a member of the Governance
          Committee.
                                          Page 1 of 42
      b. A resolution of the Board appointing Fanny Villarreal as Chair of the Governance
         Committee.
  4. Officer Appointments
     Agency Action Requested:
      a. A resolution of the Board appointing Evan Carter as Assistant Secretary.
Adjourn
                                         Page 2 of 42
                                    Regular Meeting Minutes
                                         April 10, 2025
A regular meeting of the Onondaga County Industrial Development Agency was held on Thursday,
April 10, 2025, at 335 Montgomery Street, Floor 2M, Syracuse, New York.
Patrick Hogan called the meeting to order at 8:33 AM with the following in attendance:
PRESENT:
Patrick Hogan
Janice Herzog
Susan Stanczyk
Elizabeth Dreyfuss
Cydney Johnson
Fanny Villarreal
Garard Grannell (via Zoom)
ALSO PRESENT:
Robert Petrovich, Executive Director
Nate Stevens, Treasurer
Alexis Rodriguez, Secretary
Robert Schoeneck, Assistant Treasurer
Amanda Fitzgerald, Esq., Agency Counsel
Jeffrey Davis, Esq., Agency Counsel
Christopher Andreucci, Agency Counsel (via Zoom)
Kevin McAuliffe, Upstate Pathology Lab Ownership, LLC, Counsel
Subhash Pidaparthi, Semiconductor Components Industries, LLC
Ben Harold, CHA Consulting, Inc. United Auto Supply of Syracuse West, Inc.
Robert Smith, United Auto Supply of Syracuse West, Inc., Counsel
Approval of Meeting Minutes: March 6, 2025
Upon motion by Janice Herzog, seconded by Susan Stanczyk, the Board approved the regular
meeting minutes of March 6, 2025. Motion was carried.
Treasurer’s Report:
Nate Stevens gave a brief overview of the Treasurer’s Report for the month of March 2025.
Upon motion by Susan Stanczyk, seconded by Janice Herzog, the Board approved the Treasurer’s
Report for the month of March 2025. Motion was carried.
                                            Page 3 of 42
Payment of Bills:
Nate Stevens gave a brief overview of the Payment of Bills.
Upon motion by Janice Herzog, seconded by Susan Stanczyk, the Board approved the Payment of
Bills. Motion was carried.
Action Items:
   1. Upstate Pathology Lab Ownership, LLC (Project #3101-24-07A) Second Meeting
      Upstate Pathology Lab Ownership, LLC is proposing construction of an approximately
      109,000 square foot three story pathology lab building in the town of DeWitt.
Robert Petrovich noted to the Board that Barclay Damon is representing the Applicant, and
       Chris Andreucci from Harris Beach is representing the IDA as conflict counsel for this
       project.
       Kevin McAuliffe noted that the Town of DeWitt has completed SEQR. There is a
       delineation that the Town of DeWitt can work off of. There was a preliminary determination
       that there were no DEC wetlands, but regulations have recently changed. He also stated that
       this property is in the Syracuse Urban Area. McAuliffe advised that the DEC will be on the
       property on May 1 to hopefully concur with the applicant’s engineers’ determination that
       there are no wetlands. Kevin stated that if there are changes that need to be made, the
       applicant will go back to the planning stages as this parcel of land is large and the plans may
       have to be altered. He noted that this is a necessary project for the applicant.
       Patrick Hogan read the Agency Action Requested of “A resolution of the Board authorizing a
       public hearing.” Motion was made by Janice Herzog, seconded by Susan Stanczyk. Motion
       was carried.
2. Semiconductor Components Industries, LLC dba onsemi (Project #3101-24-09A)
      Second Meeting
      Semiconductor Components Industries, LLC dba onsemi is proposing to develop and
      manufacture semiconductor technology at an existing approximately 66,550 sq. ft. fabrication
      facility located at 50 Collamer Crossings Parkway in the town of DeWitt.
       Subhash Pidaparthi reviewed the proposal that the applicant submitted at last month’s
       meeting, and that at this meeting the applicant is asking for final approval.
       Alexis Rodriguez noted that a public hearing was held, and no comments were made.
                                             Page 4 of 42
   Jeff Davis noted that this is a Type II SEQR action, meaning that there is no further
   environmental review required as this project is all happening within the existing building.
   Patrick Hogan read the Agency Action Requested of “A resolution of the Board to authorize
   adoption of SEQRA determination.” Motion was made by Janice Herzog and seconded by
   Fanny Villarreal. Motion was carried.
  Patrick Hogan read the Agency Action Requested of “A resolution of the Board authorizing
  the financial assistance the Agency will provide. Agency benefits requested include
  exemptions from certain real property taxes, real estate transfer taxes, sales and use taxes and
  mortgage recording taxes.” Motion was made by Susan Stanczyk and seconded by Janice
  Herzog. Motion was carried.
3. United Auto Supply of Syracuse West, Inc. (Project #3101-25-03A) Initial Meeting
   United Auto Supply of Syracuse West, Inc. is proposing to renovate approximately 259,000
   square feet located at 1200 State Fair Boulevard in the town of Geddes to allow for
   expansion of operations, distribution, and warehousing at one centralized location.
   Ben Harold gave background on how the current tenant who United Auto Supply shares the
   facility with, W.B. Mason, is planning to relocate to a new facility, allowing the Applicant to
   expand into the newly open space. Harold advised that the facility that W.B. Mason will be
   moving into is in Onondaga County on Buckley Road.
   Harold stated that the Applicant is proposing to renovate the 259,000 sq. ft. area. The
   renovation would consist of $4 million of MEP upgrades, and $15 million for high-tech
   upgrades to assist in the Applicant’s northeast distribution. The Applicant intends to create 70
   jobs over the next five years. The Applicant is seeking sales and use tax exemptions and
   mortgage recording tax abatement. Because there are no external renovations being made, the
   Applicant is requesting that OCIDA be lead agency for the project.
Susan Stanczyk asked if the current project is related to the Applicant’s previous project in
   Lysander that came before the Board. Ben Harold stated that this project has no relation to
   the previous project. Robert Smith, the Applicant’s counsel, also added that this project is not
   in replacement of the Lysander location.
   Patrick Hogan read the Agency Action Requested of “A resolution of the Board authorizing a
   public hearing.” Motion was made by Janice Herzog and seconded by Susan Stanczyk.
   Motion was carried.
4. Executive Session
   Jeff Davis noted that the Board was going into Executive Session for the purpose of
   discussing a proposed acquisition of real property. Motion to enter Executive Session was
   made by Janice Herzog, seconded by Susan Stanczyk. Motion was carried.
                                         Page 5 of 42
   5. Purchase Contract Execution
      Jeff Davis noted that the Board is authorizing the adoption of SEQRA determination for six
      properties. This was a long form EAF where it looked at the acquisition of six properties
      from four different purchasers as one, following the intent and purpose of SEQR, everything
      in the area was looked at collectively.
Patrick Hogan read the Agency Action Requested of “A resolution of the Board authorizing
       the adoption of a SEQRA determination for the acquisition of properties.” A motion was
       made by Janice Herzog and seconded by Susan Stanczyk. Motion was carried.
       Patrick Hogan read the Agency Action Requested of “Resolutions of the Board authorizing
       the Executive Director to enter into purchase contracts and related documents with respect to
       the acquisition of properties.” A motion was made by Susan Stanczyk and seconded by
       Janice Herzog. Motion was carried.
Motion to adjourn was made by Janice Herzog and seconded by Susan Stanczyk at 9:10 AM.
___________________________________
      Alexis Rodriguez, Secretary
                                            Page 6 of 42
                                    April 30, 2025
    Revenue / Expense / Income              Current Period        Current YTD
Operating/Non-Op Revenue                                145,657          821,983
Administrative Expense                                   49,067          206,172
Operating/Program Expense                                21,139          192,411
Net Ordinary Income                                      75,451          423,400
Current Assets                           Current YTD
Total Cash                                                             9,405,704
Less Pass Through Received                                               306,566
Net Cash                                                               9,099,139
                                  Page 7 of 42
                  Onondaga County Industrial Development Agency
                                Profit and Loss
                                                   April 2025
Total
Income
 500 Operating Revenue
   2116 Fees
     2116.1 Agency Fees                                                        1,000.00
     2116.3 WPCP Agency Fee                                                  111,111.11
   Total 2116 Fees                                         $                 112,111.11
   2410 Lease Income                                                           1,224.30
 Total 500 Operating Revenue                               $                 113,335.41
 501 Non-Operating Revenue
   2401 Interest Income                                                       32,321.66
 Total 501 Non-Operating Revenue                            $                 32,321.66
 550 WPCP Pass Thru Revenue                                                  306,565.66
Total Income                                               $                 452,222.73
Gross Profit                                               $                 452,222.73
Expenses
 6400 Operating Expense
   6406 Other Professional Services
     6406.50 Consulting Services                                               3,000.00
   Total 6406 Other Professional Services                   $                  3,000.00
   6407 Administrative Expense                                                49,066.88
   6409 Conference Attendence                                                  3,676.45
   6410 Office Expense                                                         1,717.59
   6411 Memberships / Sponsorships                                             5,800.00
 Total 6400 Operating Expense                               $                 63,260.92
 6440 Legal Fees
   6450 Barclay Damon
     6460 IDA General Legal                                                     825.00
     6480 Roth Legal                                                            240.00
   Total 6450 Barclay Damon                                 $                  1,065.00
 Total 6440 Legal Fees                                      $                  1,065.00
 6500 Agency Program Expenses
   6510 White Pine Commerce Park
     6510.7 WPCP Marketing                                                     2,028.29
   Total 6510 White Pine Commerce Park                      $                  2,028.29
 Total 6500 Agency Program Expenses                         $                  2,028.29
 6514 White Pine Science & Technology Park
   6514.1 Legal                                                                3,851.75
 Total 6514 White Pine Science & Technology Park            $                  3,851.75
 6600 Non-Operating Expenses
Page 8 of 42
6605 Pilot & Pass Thru Expenses p. 9
6605 Pilot & Pass Thru Expenses
    6606 OHB Redev LLC Funds Pass Thru                                                     987.50
   Total 6605 Pilot & Pass Thru Expenses                       $                           987.50
 Total 6600 Non-Operating Expenses                             $                           987.50
 6610 WPCP Pass Thru Expenses
   6610.1 Barclay Damon                                                                 177,777.78
   6610.2 JMT                                                                           128,787.88
 Total 6610 WPCP Pass Thru Expenses                           $                         306,565.66
Total Expenses                                                $                         377,759.12
Net Operating Income                                           $                         74,463.61
Net Income                                                     $                         74,463.61
                               Monday, May 05, 2025 10:55:27 AM GMT-7 - Accrual Basis
                                                        Page 9 of 42
Page 10 of 42
Page 11 of 42
Page 12 of 42
ONONDAGA COUNTY INDUSTRIAL DEVELOPMENT AGENCY p. 13
ONONDAGA COUNTY INDUSTRIAL DEVELOPMENT AGENCY
  PAYMENT OF BILLS - SCHEDULE #505
  May 8, 2025
GENERAL EXPENSES p. 13
GENERAL EXPENSES
1. BARCLAY DAMON*                                                    $     5,000.00
  Deposit - Tax Parcel #064.-01-07.2
2. BARCLAY DAMON*                                                    $    10,000.00
  Deposit - Tax Parcel #064.-01-06.2
3. BOND SCHOENECK & KING*                                            $   100,000.00
  Deposit - Tax Parcels #064.-01-12.1, 064.-01-12.4 & 077.-01-14.1
4. NYS ECONOMIC DEVELOPMENT COUNCIL**                                $     2,300.00
  2024 Membership Renewal, Inv#15714
5. BARCLAY DAMON                                                     $   177,777.78
  March 2025 Legal Costs
6. JMT OF NEW YORK, LLP                                              $   128,787.88
  March 2025 Engineering Costs
7. JMT OF NEW YORK, LLP                                              $      392.50
  Roth Steel - Invoice #39-105904
8. JMT OF NEW YORK, LLP                                              $     3,302.68
  Roth Steel - Invoice #39-105471
9. BARCLAY DAMON                                                     $     1,968.75
  Retained Corporate & Public Finance Matters, Inv#5334640
10. BARCLAY DAMON                                                    $     7,205.70
  WPSTP Inv#5334645
11. BARCLAY DAMON                                                    $     8,542.78
  OHB Redev, Inv#5334433
                                           Page 13 of 42
12. BARCLAY DAMON                                                    $        75.00
  Roth Steel Inv#5334637
13. BARCLAY DAMON                                                    $      907.00
  Sevigne v. OCIDA, Inv#5334412
14. ABC CREATIVE                                                     $     4,550.00
  Inv #8622
15. LOVELL AND ASSOCIATES                                            $     3,000.00
  April 2025 Consulting
                                                            Total:   $   453,810.07
  *Ratification of checks dated 4/10/2025
  **Ratification of check dated 4/16/2025
                                            Page 14 of 42
                                                                                                                                                 4/8/2025
Project:                                                 United Auto Supply of Syracuse West, Inc.                Project Number:                3101-25-03A
Location:                                                Geddes                                                   School District:      Solvay
                                                                                                                  Project Type:         Distribution/Wholesale
Tax Parcel(s):                                           019.-02-07.0, 019.-02-02.2, 019.-02-08.1, 019.-02-11.1   Village:    N/A
Total Project Cost:                                       $                         19,250,000                    8. Total Jobs           498
Land Acquisition                                          $                                  -                    8A. Job Retention       433
Site Work/Demo                                            $                                  -                    8B: Job Creation         65
Building Construction & Renovation                        $                          4,000,000                         (Next 5 Years)
Furniture & Fixtures                                      $                                  -
Equipment                                                 $                         15,000,000
Project Soft Cost                                         $                            250,000
Community Investment /Abatement                                                                                                                   Project Description
                                                 Fiscal Impact ($)
Abatement Summary                                         $1,512,500
  Sales Tax Abatement                                     $1,400,000
  Mortgage Tax Abatement                                  $112,500
  Property Tax Relief (PILOT)                             $0
                                                                                                                   The applicant is proposing to renovate approximately 259,000 square feet located at
Community Investment                                     $48,804,807                                                 1200 State Fair Blvd in the Town of Geddes to allow for expansion of operations,
  PILOT Payments                                         $0                                                                     distribution, and warehousing at one centralized location.
  Project Salaries and Benefits Estimated (10 yrs)       $27,378,307
  Construction Benefit Estimate                          $2,176,500
  Total Project Cost                                     $19,250,000
Investment:Abatement Ratio                               32.27                                   :1
© 2025 Onondaga County Industrial Development Agency. All rights reserved.
Page 15 of 42
Page 16 of 42
Page 17 of 42
Page 18 of 42
Page 19 of 42
Page 20 of 42
Page 21 of 42
Page 22 of 42
Page 23 of 42
Page 24 of 42
Page 25 of 42
Page 26 of 42
Page 27 of 42
Page 28 of 42
Page 29 of 42
Page 30 of 42
Page 31 of 42
Page 32 of 42
Page 33 of 42
Page 34 of 42
Page 35 of 42
Page 36 of 42
Page 37 of 42
Page 38 of 42
Page 39 of 42
Page 40 of 42
                                      OCIDA Application Appendix
Section 2 – Project Information
D.      Project Narrative, Description of Project
Without the requested benefits from the Onondaga County Industrial Development Agency, the project
would not be undertaken at this time. The proposed project value of approximately $19 million would
be shelved or looked to be completed at locations outside of Onondaga County if financial assistance is
not approved by the Agency.
E.      Description of Project
United Auto Supply (UAS) is a distributor/retailer of auto parts which was founded in 1946. Over the last
seventy-nine years they have expanded from a 2,500 square foot store on West Genesee Street to a
70,000 square foot facility on Tracy Street in the City of Syracuse. Based on the continued growth in our
business, in 2016 they purchased and renovated the former P&C Warehouse at 1200 State Fair Blvd,
which is now Ranalli Industrial Park which is 567,000 square feet and corporate headquarters for United
Auto Supply. UAS has a lease agreement with 1200 State Fair Boulevard LLC for the project site and
associated facilities, a copy of the agreement has been provided as part of the application.
UAS currently occupies approximately 308,000 square feet of the Ranalli Industrial Park which is located
on 22+/- acres in the Town of Geddes. The property is currently zoned and utilized for warehouse
distribution services. Previously the Industrial Park had multiple tenants within the facility, but due to
the growth within UAS’s business over the last several years and the desire to expand their operation at
1200 State Fair Boulevard, additional warehouse/distribution facilities have been constructed or
acquired to relocate tenants within the complex to other locations throughout Onondaga County.
Previously, Lowe’s Home Improvements distribution facility was relocated from the Industrial Park to a
100,000 sf facility off Erie Boulevard in the City of Syracuse. Additionally, WB Mason, is currently being
relocated to a facility located off Buckley Road in the Town of Clay.
Based on our continued growth of UAS in the northeast and commitment to Onondaga County there is a
need for an additional warehouse and distribution space for their operations. The proposed project is
the renovation of approximately 259,000 square feet (previously occupied by WB Mason) at 1200 State
Fair Boulevard to allow for expansion of operations, distribution and warehousing at one centralized
location. The portion of the existing building that were the proposed expansion is contemplated was
constructed in the late 1960s. In order to allow for expansion, the facility requires structural,
mechanical, electrical and life safety upgrades for the installation of a state-of-the art automated
distribution system.
United Auto Supply has experienced great revenue growth year over year which has allowed for the
company to continuously expand. The expansion of warehouse/distribution services at 1200 State Fair
Boulevard will allow greater flexibility in future expansions and bringing on new product lines to serve
the automotive and retail industry in the northeast and US. The anticipated expansion would allow for
job creation and revenue increases over the upcoming three to five years.
                                              Page 41 of 42
F.      As previously stated in the Description of the Project, the project will not result in the removal
or abandonment of existing facilities elsewhere in NYS to the proposed project location. Additionally,
the project relocates existing tenants of Industrial Park to other sites within Onondaga County to
continue their warehouse and distribution operations.
                                               Page 42 of 42