Typeset from the PDF of the official document (read by OCR) — headings, motions and recorded votes are detected automatically, so spacing may differ from the original. The official copy governs.
MICRON SEMICONDUCTOR MANUFACTURING PROJECT, CLAY, NY, FINAL ENVIRONMENTAL IMPACT STATEMENT Final EIS Topic/Resource Area Appendix
A-1: CPO Purpose and Need Factors A-2: Final SEQRA Scope A-3: Summary of NEPA Scoping Comments A-4: Notices A-5: Response to Comments A-6: Comment Matrix and Comments Received
ALTERNATIVES B-1: Micron Campus Site Selection Background B-2: Construction Phases, and Site B-3: Layout Alternatives B-4: Micron Campus Parking Space Needs B-5: Revised Proposed Project Construction Schedule Details and Impact Analysis Review B-6: Revised Traffic Modeling Technical Memorandum
C-1: Growth Inducing Effects C-2: REMI Study
PUBLIC POLICY D-1: Land Use, Zoning, and Public Policy Methodology D-2: Zoning Regulations D-3: Public Policies D-4: NRCS FPPA Review Documents 1 MICRON SEMICONDUCTOR MANUFACTURING PROJECT, CLAY, NY, FINAL ENVIRONMENTAL IMPACT STATEMENT Final EIS Topic/Resource Area Appendix
3.2 GEOLOGY, SOILS, AND Appendix E, Vol. 1 TOPOGRAPHY E-1: Geology, Soils, And Topography Methodology E-2: Soil Type Descriptions E-3: Topographical Figures E-4: Geotechnical Reports (part 1)
E-4 (cont.): Geotechnical Reports
E-4 (cont.): Geotechnical Engineering Report
E-4 (cont.): Geotechnical Engineering Report
E-4 (cont.): Geotechnical Engineering Report
E-4 (cont.): Geotechnical Engineering Report E-5: Blasting Plan 3.3 WATER RESOURCES Appendix F, Vol. 1 Part 1 F-1: Water Resources Study Area F-2: Legal and Regulatory Setting F-3: Supplemental Information: Affected Environment F-4: Supplemental Information: Environmental Consequences F-5: Water Resources Figures F-6: Jurisdictional Determination F-7: Compensatory Mitigation Plan
F-7 (cont.): Buxton Creek Mitigation Plan
F-7 (cont.):
2 MICRON SEMICONDUCTOR MANUFACTURING PROJECT, CLAY, NY, FINAL ENVIRONMENTAL IMPACT STATEMENT Final EIS Topic/Resource Area Appendix
Fish Creek Mitigation Plan Upper Caughdenoy Creek Mitigation Plan Lower Caughdenoy Creek Mitigation Plan
F-7 (cont.):
Oneida River Mitigation Plan Sixmile Creek Mitigation Plan F-8: Draft SWPPP 3.4 BIOLOGICAL RESOURCES Appendix G, Vol. 1 G-1: Biological Resources Methodology G-2: Legal and Regulatory Setting G-3: Supplemental Information: Affected Environment G-4: Draft Biological Assessment G-5: Grassland Breeding Bird Survey
G-6: Youngs Creek Surveys G-7: USFWS IPaC System Results G-8: NYSDEC EAF Mapper Results G-9: Draft Invasive Species Management Plan G-10: Preliminary Landscape Drawings
RESOURCES H-1: Area of Potential Effect (APE) Figures H-2: NHPA Section 106 Process Summary for the Preferred Action Alternative
I-1: Stationary Source Modeling Executive Summary: Micron Campus 4- Fab Scenario I-2: Mobile Source Methodology I-3: CO & PM Screening Spreadsheets 3 MICRON SEMICONDUCTOR MANUFACTURING PROJECT, CLAY, NY, FINAL ENVIRONMENTAL IMPACT STATEMENT Final EIS Topic/Resource Area Appendix
J-1: Air Application 2 GHG BACT
Analysis
J-2: CLCPA Analysis 3.8 SOLID WASTE, HAZARDOUS Appendix K, Vol. 1 WASTE, AND HAZARDOUS K-1: Solid Waste, Hazardous Waste, and MATERIALS Hazardous Materials Methodology K-2: Solid Waste Transfer Stations and Disposal Facilities K-3: Phase I ESA – Main Campus West K-4: Phase I ESA – Main Campus East, Rail Spur Site, and Childcare Site
K-5: Phase I ESA – Rail Spur Addition K-6: Supplemental Information Environmental Consequences K-7: Draft Soil Materials Management Plan K-8: Micron Construction Waste Management Plan K-9: Micron Hazardous Waste Contingency Plan (Outline) K-10: OCRRA Waste Capacity Availability K-11:2024 Micron Technology, Inc. Sustainability Report K-12: Example Micron Procedures
SAFETY L-1: Use, Management, and Disposal of Per- and Polyfluoroalkyl Substances at the Micron New York Semiconductor Fabrication Facilities L-2: Relevant OSHA Standards L-3: Micron Emergency Response Management System L-4: Micron Global EHS Construction Performance Standard
4 MICRON SEMICONDUCTOR MANUFACTURING PROJECT, CLAY, NY, FINAL ENVIRONMENTAL IMPACT STATEMENT Final EIS Topic/Resource Area Appendix
Traffic Impact Study
Traffic Impact Study (cont.) Traffic Impact Study Year 2041 Traffic Operations Summary and Recommendations References
Traffic Impact Study Appendices TRANSPORTATION AND A. Data and Referenced Documents
TRAFFIC B. Calibration C. Crash Data D. Model Output
Traffic Impact Study Appendices (cont.) Referenced Planned Road Improvement Plans Referenced SMTC Models Referenced Studies
Traffic Impact Study Appendices (cont.) B. Calibration C. Crash Data D. Model Output
N-1: Noise and Vibration Methodology
N-3: Detailed Predicted Constructed and Vibration Impacts N-4: Detailed Traffic Noise Model Results N-5: Traffic Model Receptor Locations
COMMUNITY CHARACTER O-1: Visual Effects and Community Character Methodology O-2: Supplemental Information: Affected Environment O-3: Site Visit Viewpoint Photographs
OPEN SPACE, AND P-1: Community Facilities, Open Space, RECREATION and Recreation Methodology P-2: Healthcare Facilities P-3: School Growth Projections 5 MICRON SEMICONDUCTOR MANUFACTURING PROJECT, CLAY, NY, FINAL ENVIRONMENTAL IMPACT STATEMENT Final EIS Topic/Resource Area Appendix
CONDITIONS Q-1: Socioeconomic Conditions Assessment Methodology Q-2: Supplemental Information: Affected Environment Q-3: Supplemental Information: Environmental Consequences
R-1: Supplemental Methodology R-2: Summary of Public Outreach
UNAVOIDABLE
IRREVERSIBLE OR
6