clayny.news

AI for transparency
Clay, New York · Friday, November 6, 2026· Nov 6, 2026
Public Records › Town of Clay › Supervisor's notice

OCWA Eastern Branch MAP

Catalog date 2026-09-21 · PDF · 91 words · catalog collection 2026-09-22 Official copy↗ Plain text Mentions

Text index: 2 passages across 1 pages with extracted text; 2 passages have semantic vectors. Pages with any indexed text may still contain unextracted scanned content. Complete page coverage has not been verified. No verified archived PDF is available. Failed captures are not served as archived PDFs.

No recorded acquisition check; current official availability unknown. Recorded acquisition check: not recorded. This is not a live source availability check.

Document type unverified. Event date unknown. Issue date unknown. Catalog date: 2026-09-21.
Background page processing · status is stale

0 jobs match the current original: 0 queued, processing or awaiting import; 0 awaiting page review; 0 held; 0 with machine text indexed. Machine recognition can contain errors. Indexed text and complete page extraction are different states.

Status received: 2026-11-06T07:36:14.215909+00:00. Producer observation: 2026-11-06T07:35:19.765553+00:00. These are processing observations, not document issue dates.

Search index status: success. Last checked: 2026-11-06T07:35:05.928051+00:00. Last successful check: 2026-11-06T07:35:19.762315+00:00.

Typeset from the PDF of the official document — extraction method is not certified for this historical record; headings, motions and recorded votes are detected automatically, so spacing may differ from the original. The official copy governs.

Eastern Branch Parallel Transmission Main Design Phase: Sept. 2026 - Nov. 2027 Design Phase work includes:

• site observation/utility marking • land surveying and staking • soil boring and subsurface investigation • archaeological surveying (hand digging) • brush clearing and temporary access creation.

Micron Great Northern Mall

OCWA

Facility Henry Clay Boulevard Maple Road The new Construction transmission main Phase work is To contact OCWA (shown in red) projected from Email: projects@ocwa.org will run parallel to Dec. 2027 to Phone: 315-455-7061, Ext. 3159 the existing main. Jan. 2031 © OpenStreetMap contributors

Context from the archive

This notice from an unspecified board concerns an OCWA Eastern Branch MAP. The record contains no prior action related to this notice.

Same source EBTM Letter to Owners in ROW · 2026-09-21
Same source EBTM Letter to Owners in ROW · 2026-09-21
Same source OCWA Eastern Branch MAP · 2026-09-21
Same source EBTM Letter to Owners in ROW · 2026-09-21
Same source OCWA Eastern Branch MAP · 2026-09-21