LEGEND Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 93 VARIANCE- FENCING HEIGHT (ZBA CASE #1988) TOWN OF CLAY ZONING CODE § 230-17(D)(5) EXCERPT FROM ZONING BOARD OF APPEALS NARRATIVE - SECTION II-C, REQUEST...
LEGEND Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 93 VARIANCE- FENCING HEIGHT (ZBA CASE #1988) TOWN OF CLAY ZONING CODE § 230-17(D)(5) EXCERPT FROM ZONING BOARD OF APPEALS NARRATIVE - SECTION II-C, REQUEST...
LEGEND Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 93 VARIANCE- FENCING HEIGHT (ZBA CASE #1988) TOWN OF CLAY ZONING CODE § 230-17(D)(5) EXCERPT FROM ZONING BOARD OF APPEALS NARRATIVE - SECTION II-C, REQUEST...
PROPOSED VARIANCES • REQUIRED LOADING DOCKS • PARKING • FENCING HEIGHT • SITE SETBACK • PRIMARY AND SECONDAY STRUCTURES 91 VARIANCE- REQUIRED LOADING DOCKS (ZBA CASE #1988)
PROPOSED VARIANCES • REQUIRED LOADING DOCKS • PARKING • FENCING HEIGHT • SITE SETBACK • PRIMARY AND SECONDAY STRUCTURES 91 VARIANCE- REQUIRED LOADING DOCKS (ZBA CASE #1988)
PROPOSED VARIANCES • REQUIRED LOADING DOCKS • PARKING • FENCING HEIGHT • SITE SETBACK • PRIMARY AND SECONDAY STRUCTURES 91 VARIANCE- REQUIRED LOADING DOCKS (ZBA CASE #1988)
BACKFLOW PREVENTION BUILDING Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 95 VARIANCE- PRIMARY AND SECONDARY STRUCTURES (ZBA CASE #1988) Accessory Structure: A structure or mechanical equipment or decorative device attached or detached from the principal...
BACKFLOW PREVENTION BUILDING Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 95 VARIANCE- PRIMARY AND SECONDARY STRUCTURES (ZBA CASE #1988) Accessory Structure: A structure or mechanical equipment or decorative device attached or detached from the principal...
BACKFLOW PREVENTION BUILDING Micron New York Semiconductor Manufacturing Facility - Planning Board Presentation - October 08, 2025 95 VARIANCE- PRIMARY AND SECONDARY STRUCTURES (ZBA CASE #1988) Accessory Structure: A structure or mechanical equipment or decorative device attached or detached from the principal...
TABLE OF CONTENTS • Project Site Location • ZBA Standard of Proof • Variance Requests (ZBA Case #1988) 1. Number of Required Loading Docks 2. Number of Required Parking Spaces 3. Fence Height Restrictions 4. Setback Requirements 5. Accessory Structure Requirements • Permitting Drawing...
Zoning Board of Appeals 2025-10-13 Meeting →
MOTION was made by Mr. Frantzis in Case #1988 to approve the Area Variances as requested with the condition they be in substantial compliance with Exhibit “A”. Motion was seconded by Mr. Porter.
Town Board 2014-02-03 Meeting →
...Special Permit (PH) – Town Board Case #1056 PLUS REAL ESTATE, LLC: Adjourned to March 3rd 2014 at 7:44 P.M. Licenses and Permits (PH) - CASUAL ESTATES (MOBILE HOME COURT) LLC, d/b/a MADISON VILLAGE: A public hearing to...
Zoning Board of Appeals 2021-03-08 Meeting →
...Liebi in Case #1823 to approve the Area Variance as requested with the condition it be in substantial compliance with Exhibit “A”, dated June 3, 1988. Motion was seconded by Mrs. Magaro-Dolan.
Zoning Board of Appeals 2025-12-08 Meeting →
...The Zoning Board of Appeals (ZBA), at its October 13th meeting, heard Cases #1988 and #1989 requesting deviations from the Town of Clay Zoning Ordinance to facilitate development of the Micron Semiconductor Manufacturing campus at the White Pine Commerce Park...