clayny.news

AI for transparency
Clay, New York · Monday, September 21, 2026· Sep 21, 2026

Public Records

The documentary record of a town in the middle of an $89 billion project — every meeting minute, public document, local law and line of town code we can collect, kept current and searchable together.

Searches minutes and documents together · for the codified law and historical material use Ask Clay
...Final EIS and determined that none of the changes from Draft EIS to Final EIS materially changed the reasonably foreseeable effects 32692910.1 Page 81 of 327 that were described in the Draft EIS for the Proposed Micron Project or...
The Agency created a working group to understand and evaluate the proposed Micron project and all potentially significant environmental impacts, including available avoidance, mitigation, and minimization measures, as well as to consider a preliminary draft of the Draft EIS. During...
The Final EIS incorporates certain changes from the Draft EIS including a potential revision to the proposed Micron project's construction schedule and commencement of construction for each fab, as well as the childcare site, compared to what was presented...
...The Agency created a working group to understand and evaluate the proposed Micron project and all potentially significant environmental impacts, including available avoidance, mitigation, and minimization measures, as well as to consider a preliminary draft of the Draft EIS. During...
...When Micron announced, the Micron project was going to be larger than the Intel project, so the Agency had to pivot off the Generic EIS and do a supplement and a specific EIS for their project. Christina Hollenback asked whether...
...General opposition to the proposal cannot be accommodated within the scoping document or the Draft EIS. The Proposed Action is the development of the White Pine Commerce Park (Park), 5171 Route 31, Town of Clay, New York, by Micron New...
...General opposition to the proposal cannot be accommodated within the scoping document or the Draft EIS. The Proposed Action is the development of the White Pine Commerce Park (Park), 5171 Route 31, Town of Clay, New York, by Micron New...
...The Agency determines that none of the changes from the Draft EIS to Final EIS materially change the reasonably foreseeable effects that were described in the Draft EIS for the proposed Micron project, or alter the significance of those effects...
INDUSTRIAL DEVELOPMENT AGENCY studied in the Generic Environmental Impact Statement (EIS) that will ultimately lead to the development of the site. After the Agency receives the comments on the Draft Scope, the Agency will then develop a Final Scope, which...
...When Micron announced, the Micron project was going to be larger than the Intel project, so the Agency had to pivot off the Generic EIS and do a supplement and a specific EIS for their project. Christina Hollenback asked whether...
Zoning Board of Appeals 2025-12-08 Meeting →
...as Lead Agency determined that the Proposed Micron Project, including the ancillary Rail Spur Project may result in one or more significant adverse environmental impacts and therefore, that an environmental impact statement (“EIS”) must be prepared with respect to the...
Town Board 2025-12-15 Meeting →
...EIS") must be prepared with respect to the entire Project, and, on or about June 25, 2025, OCIDA accepted a Draft EIS as complete and ready for public review. 13. On November 7, 2025 OCIDA determined that a Final EIS...