Public Records
The documentary record of a town in the middle of an $89 billion project —
525 meeting records and
1069 documents from five official sources,
collected continuously and searchable in one place.
In documents
...MANUFACTURING PROJECT, CLAY, NY, FINALDRAFT ENVIRONMENTAL IMPACT STATEMENT
Altered Soil Changes to the length of soil saturation time can also alter marsh soil chemistry, which
Chemistry may further reduce plant productivity.
Sources: Manghwar et al. (2024); Haaf et al. (2015).
WHEREAS, pursuant to a resolution of the Agency adopted on August 20, 2015, the
Agency granted financial assistance to Morgan B Ville Apartment, LLC (“Morgan B Ville”) in
connection with a project consisting of the construction of 17 three story...
...The health of these waterbodies is influenced by local and regional conditions,
including the conditions of upstream and adjacent wetlands and streams (USEPA, 2015). In
general, the wildlife species identified at the Proposed Project sites also have the potential to...
...Altered Soil Changes to the length of soil saturation time can also alter marsh soil chemistry, which
Chemistry may further reduce plant productivity.
Sources: Manghwar et al. (2024); Haaf et al. (2015).
...Final rule signed October 1, 2015, and effective December 28, 2015. The previous (2008) O 3 standards are not revoked and
remain in effect for designated areas. Additionally, some areas may have certain continuing implementation obligations under
the prior revoked...
...Final rule signed October 1, 2015, and effective December 28, 2015. The previous (2008) O3 standards are not revoked and
remain in effect for designated areas. Additionally, some areas may have certain continuing implementation obligations under
the prior revoked 1...
...Vegetation clearing and other construction effects may elevate stream temperatures,
which could cause temperatures to exceed the tolerance levels of sensitive species, including many
cold-water fish and macroinvertebrates (Nelson and Palmer 2007). Changes in topography and soil
exposure may...
...Vegetation clearing and other construction effects may elevate stream temperatures,
which could cause temperatures to exceed the tolerance levels of sensitive species, including many
cold-water fish and macroinvertebrates (Nelson and Palmer 2007). Changes in topography and soil
exposure may...
2 results in minutes for “"May 2015"”
...3 – lateral; River Grove Water Supply District) all as
shown on a Final Plan prepared by Ianuzi & Romans Land Surveying, P.C., dated
February 2, 2015. Motion was seconded by Councilor Bick.
Ayes – 7 and Noes – 0. Motion carried.
Project...
...There are 175 new employees since 2015, and enrollment has gone
down by 525 students in the same timeframe. LCSD has exceeded their
budget since the 2024-2025 school year.
A pie chart showed that 49% of the money coming...