Micron Updates
Micron Updates
General
Click to view Micron's
Draft EIS
***ATTENTION MEDIA PERSONNEL***
The Town of Clay acknowledges your request to obtain materials submitted by consultants retained by Micron in support of their proposed semiconductor manufacturing facility at...
Micron Updates Click to view Micron's Draft EIS ***ATTENTION MEDIA PERSONNEL*** The Town of Clay acknowledges your request to obtain materials submitted by consultants retained by Micron in support of their proposed semiconductor manufacturing facility at the White Pine...
...Micron New York Semiconductor Manufacturing LLC - Project Updates
Main Campus (Project #3101-23-07A), Rail Spur (Project #3101-25-06A)
Carson Henry and Katie Birchenough presented the update to the Micron Semiconductor and
Rail projects.
C. Henry stated the following:
...Prevention Plan;
(9) implement a Toxic Organics Management Plan; and (10) incorporate measures to implement
anticipated near-term updates to regulatory requirements. Micron will also be required to increase
and maximize water recycling, reuse, and restoration, where feasible during operations.
...Micron New York Semiconductor Manufacturing LLC - Project Updates
Main Campus (Project #3101-23-07A), Rail Spur (Project #3101-25-06A)
5. Contract Authorization
Agency Action Requested:
a. A resolution of the Board authorizing an amendment to the contract with Barton...
...Micron New York Semiconductor Manufacturing LLC - Project Updates
Main Campus (Project #3101-23-07A), Rail Spur (Project # 3101-25-06A)
5. Contract Authorization
Agency Action Requested:
a. A resolution of the Board authorizing an amendment to the contract with Barton...
Regular Meeting of the Board of Education
458
4/6/26
STEAM & MICRON Nickolas Scholz, Director of STEM, and Jason Clark, Director of Technology, provided an update
on STEAM and Micron initiatives.
Regular Meeting of the Board of Education
459...
...Rakitech presented a power point presentation highlighting the updates made to date.
The power point presentation included: (a copy of this presentation is available on the website
under “Micron”
• Cover Sheet Index Revision History
• Phase 1 Site Plan Naming (MOD1...
...The Caughdenoy Road site is a 99.05-acre parcel in
the Micron Campus. A revised landscaping plan has been submitted which shows the existing
trees will be protected during the construction. The sheet on the plan has been updated...
...Hurta gave an update on this project:
• Updating the site plan drawings anticipating submitting to town by October 14.
• Received comments on SWPP from NYS and town engineer and will be working to
address these comments
• ZBA meeting is scheduled...
...Chairman Mitchell gave a list to the applicant stating what sheets are needed for site plan.
✓ Cover Sheet – Original date and revision dates as updated)
✓ 101 – identify trees, lighten up sheet
✓ 102 incorporate on 105 and 106
✓ 502 keep and...
...He stated Micron would likely be one of them. Mr.
REPORTS
Crabtree stated we had Tier 6 on this year and that was very successful.
OCM BOCES BOARD Mr. Crabtree stated that OCM BOCES just had their Olympics in Cortland...